Forwards LER 97-031-00 Which Documents Event That Occurred at Mnps,Unit 2 on 970918.Commitments Made within Ltr Listed
ML20212B298
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/17/1997
From: Price J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20212B302 List:
References
B16782, NUDOCS 9710280038
Download: ML20212B298 (2)


LER-2097-031, Forwards LER 97-031-00 Which Documents Event That Occurred at Mnps,Unit 2 on 970918.Commitments Made within Ltr Listed
Event date:
Report date:
3362097031R00 - NRC Website

text

~ _ , w it.q.c I try lhi (ilmete 1%). Wctrrlurit, (Tr (NOM Nascicar Ericgy u it io Na<i< t l'-er Nai6"a

, Nortlica.: S ue lcar 1.ncrgi Danaany

, I'D ILis 12ft Watesfor<l,(Il (NdM Ol216 (fWeU) 447 1798 I at (fue0) 444 42*7 1he Nortlica.: 1%1a,c, by.tcin OCT I 71997 Docket No 50 336 B16782 Re: 10 CFR 50.73(a)(2)(li) 10 CFR 50.73(a)(2)(v)

U.S. Nuclear Regulatory Commission l Document Control Desk Washington, DC 20555 This letter forwards Licensee Event Report (LER) 97-031-00, documenting a condition that was discovered at Millstone Nuclear Power Station, Unit No. 2 on September 18, 1997. This LER la being submitted pursuant to 10 CFR 50.73(a)(2)(ii) and 10 CFR 50.73(a)(2)(v).

The following are NNECO's commitments made within this letter.

B16782 01: As a result of this condition, the present pipe rupture design configurations associated with postulated high energy line breaks will be evaluated against the fat"ity design criteria and corrective action required for facility startup, including compensatory measures, will be identif,ed and performed prior to entering Mode 4 from the current outage.

t Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY Ji A./fyice ,

Dire 6tbr - Millstone Unit No. 2 cr cc: see page 2

/gb- m. 3 6 Map "

t._ ,m ,, ,,

IIIIIElE,B,5Hi

U. S. Nuclear Regul: tory Commission B16782/f age 2

Attachment:

LER 97-031-00 cc: H. A Miller, Region i Administrator D, G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2 D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 W. D. Travers, PhD, Director, Special Projects Office P. F. McKee, Deputy Director of Licensing, Special Projects Office W. D. Lanning, Deputy Director of Inspections, Special Projects Office

~

d

+r44*e-d-3&gy pn e-F 7e-r+e-m 9+.=--g ..m.,.9 -.g4 - my