| | | Reporting criterion |
|---|
| 05000336/LER-1982-001-04, /04T-0:on 820121,recording Device for Radiation Monitor Found Out of Svc During Liquid Radwaste Discharge to Long Island Sound.Caused by Removal of Recorder for Calibr. Recorder Labeled | /04T-0:on 820121,recording Device for Radiation Monitor Found Out of Svc During Liquid Radwaste Discharge to Long Island Sound.Caused by Removal of Recorder for Calibr. Recorder Labeled | |
| 05000245/LER-1982-001, Forwards LER 82-001/03L-0.Detailed Event Analysis Encl | Forwards LER 82-001/03L-0.Detailed Event Analysis Encl | |
| 05000245/LER-1982-001-03, /03L-0:on 820115,while Performing Steam Line High Flow Functional Test,Switches 261-2B & 261-2D Failed to Trip at Desired Setpoint.Caused by Setpoint Drift.Switches Recalibr | /03L-0:on 820115,while Performing Steam Line High Flow Functional Test,Switches 261-2B & 261-2D Failed to Trip at Desired Setpoint.Caused by Setpoint Drift.Switches Recalibr | |
| 05000336/LER-1982-001, Forwards LER 82-001/04T-0.Detailed Event Analysis Encl | Forwards LER 82-001/04T-0.Detailed Event Analysis Encl | |
| 05000336/LER-1982-002, Forwards LER 82-002/03L.Detailed Event Analysis Encl | Forwards LER 82-002/03L.Detailed Event Analysis Encl | |
| 05000336/LER-1982-002-03, /03L-0:on 820106,w/plant in Shutdown for Refueling,Fuses in Inverters 2 & 6 Blew Resulting in Loss of Vital Instrument Panel VA-20 & Causing Closure of Overpressure Circuit.Caused by Short Circuited Test Lead | /03L-0:on 820106,w/plant in Shutdown for Refueling,Fuses in Inverters 2 & 6 Blew Resulting in Loss of Vital Instrument Panel VA-20 & Causing Closure of Overpressure Circuit.Caused by Short Circuited Test Lead | |
| 05000245/LER-1982-002-03, /03L-0:on 820115,B Emergency Svc Water Pump Declared Inoperable After Failure to Meet Min Pump Discharge Pressure.Caused by Marine Fouling of Pump Suction W/Possible Slippage of Second Stage Impeller to Pump Shaft | /03L-0:on 820115,B Emergency Svc Water Pump Declared Inoperable After Failure to Meet Min Pump Discharge Pressure.Caused by Marine Fouling of Pump Suction W/Possible Slippage of Second Stage Impeller to Pump Shaft | |
| 05000245/LER-1982-002, Forwards LER 82-002/03L-0.Detailed Event Analysis Encl | Forwards LER 82-002/03L-0.Detailed Event Analysis Encl | |
| 05000336/LER-1982-003-03, /03L-0:on 820104,fan F394 Tripped on Overload, Rendering Radiation Monitors 8123A & B Inoperable.Caused by Seized Bearings Due to Lack of Lubricaton.Blower Replaced. Proper Drainplug Installation Will Be Verified | /03L-0:on 820104,fan F394 Tripped on Overload, Rendering Radiation Monitors 8123A & B Inoperable.Caused by Seized Bearings Due to Lack of Lubricaton.Blower Replaced. Proper Drainplug Installation Will Be Verified | |
| 05000336/LER-1982-003, Forwards LER 82-003/03L-0 | Forwards LER 82-003/03L-0 | |
| 05000245/LER-1982-003, Forwards LER 82-003/01T-0.Detailed Event Analysis Encl | Forwards LER 82-003/01T-0.Detailed Event Analysis Encl | |
| 05000245/LER-1982-003-01, /01T-0:on 820217,while Switching to Isolate North 345 Kv Line Circuit Switcher 15G-2T-6 Faulted Phase a to B Causing Fire to Circuit Switcher.Caused by Interrupter Contact within Circuit Switcher Failed in Open Position | /01T-0:on 820217,while Switching to Isolate North 345 Kv Line Circuit Switcher 15G-2T-6 Faulted Phase a to B Causing Fire to Circuit Switcher.Caused by Interrupter Contact within Circuit Switcher Failed in Open Position | |
| 05000245/LER-1982-004-03, /03L-0:on 820212,during Containment Isolation Valve Operability Demonstration,Isolation Condenser Condensate Return Valve 1-IC-3 Failed to Open Upon Signal. Caused by Contraction Upon Cooling.Valve Heated to Open | /03L-0:on 820212,during Containment Isolation Valve Operability Demonstration,Isolation Condenser Condensate Return Valve 1-IC-3 Failed to Open Upon Signal. Caused by Contraction Upon Cooling.Valve Heated to Open | |
| 05000245/LER-1982-004, Forwards LER 82-004/03L-0.Detailed Event Analysis Encl | Forwards LER 82-004/03L-0.Detailed Event Analysis Encl | |
| 05000336/LER-1982-004-03, /03L-0:on 820126,pressure Channel for 1 of 2 Motor Operated Shutdown Cooling Isolation Valves Found to Be Approx 80 Psi Above Tech Specs.Caused by Shift in Zero Point of transmitter,Fisher-Porter Model 50EP 1042BC5A | /03L-0:on 820126,pressure Channel for 1 of 2 Motor Operated Shutdown Cooling Isolation Valves Found to Be Approx 80 Psi Above Tech Specs.Caused by Shift in Zero Point of transmitter,Fisher-Porter Model 50EP 1042BC5A | |
| 05000336/LER-1982-004, Forwards LER 82-004/03L-0 | Forwards LER 82-004/03L-0 | |
| 05000336/LER-1982-005-03, /03L-0:on 820304,during Filling of Rcs,Power Operated Pressure Relief Valve 2-RC-403 Was Closed in Order to Isolate Leak in Body to Bonnet Joint.Leak Caused by Lack of Pressure & Temp in Rcs.Temp & Pressure Increased | /03L-0:on 820304,during Filling of Rcs,Power Operated Pressure Relief Valve 2-RC-403 Was Closed in Order to Isolate Leak in Body to Bonnet Joint.Leak Caused by Lack of Pressure & Temp in Rcs.Temp & Pressure Increased | |
| 05000336/LER-1982-005, Forwards LER 82-005/03L-0 | Forwards LER 82-005/03L-0 | |
| 05000245/LER-1982-005, Forwards LER 82-005/01T-0.Detailed Event Analysis Encl | Forwards LER 82-005/01T-0.Detailed Event Analysis Encl | |
| 05000245/LER-1982-005-01, /01T-0:on 820224,HFA Relay 595-113D Coil Bobbin Found Severely Melted & Four Other Relays Found W/Initial Signs of Melting.Apparently Caused by Use in Continually Energized Application,Raising Temp to Melting Point | /01T-0:on 820224,HFA Relay 595-113D Coil Bobbin Found Severely Melted & Four Other Relays Found W/Initial Signs of Melting.Apparently Caused by Use in Continually Energized Application,Raising Temp to Melting Point | |
| 05000336/LER-1982-006, Forwards LER 82-006/03L-0 | Forwards LER 82-006/03L-0 | |
| 05000336/LER-1982-006-03, /03L-0:on 820310,during Type B & C Local Leak Rate Testing During Refueling,Excessive Combined Leakage Rate Discovered.Caused by Mechanical Deficiencies in Valves & Personnel Access Hatch.Deficiencies Corrected | /03L-0:on 820310,during Type B & C Local Leak Rate Testing During Refueling,Excessive Combined Leakage Rate Discovered.Caused by Mechanical Deficiencies in Valves & Personnel Access Hatch.Deficiencies Corrected | |
| 05000245/LER-1982-006-03, Le 82-006/03L-0:on 820212,MSIV 1-MS-2C Closing Time Exceeded Tech Spec Range.Caused by Maladjustment of Control Valve Hydraulic Cylinder.Cylinder Speed Readjusted | Le 82-006/03L-0:on 820212,MSIV 1-MS-2C Closing Time Exceeded Tech Spec Range.Caused by Maladjustment of Control Valve Hydraulic Cylinder.Cylinder Speed Readjusted | |
| 05000245/LER-1982-006, Forwards LER 82-006/03L-0.Detailed Event Analysis Encl | Forwards LER 82-006/03L-0.Detailed Event Analysis Encl | |
| 05000336/LER-1982-007, Forwards LER 82-007/03L-0 | Forwards LER 82-007/03L-0 | |
| 05000245/LER-1982-007-03, /03L-0:on 820315,while Performing Isolation Condenser Isolation Instrument Functional & Calibr Test, Switch 1350B Tripped at 147 Inches of Water.Caused by Setpoint Drift.Switch Recalibr | /03L-0:on 820315,while Performing Isolation Condenser Isolation Instrument Functional & Calibr Test, Switch 1350B Tripped at 147 Inches of Water.Caused by Setpoint Drift.Switch Recalibr | |
| 05000245/LER-1982-007, Forwards LER 82-007/03L-0.Detailed Event Analysis Encl | Forwards LER 82-007/03L-0.Detailed Event Analysis Encl | |
| 05000336/LER-1982-008-03, Reactor Coolant Pump Speed Sensing Bistable Trip Setpoint Found Out of Spec. Caused by Instrument Drift.Bistable Trip Unit Replaced.W/ | Reactor Coolant Pump Speed Sensing Bistable Trip Setpoint Found Out of Spec. Caused by Instrument Drift.Bistable Trip Unit Replaced.W/ | |
| 05000245/LER-1982-008-03, /03L-0:on 820318,breakers for Main Steamline Drain Valve,Inboard Torus Spray Stop Valve & Inboard Drywell Spray Stop Valve Found Tripped.Caused by Water Soaking Through Environ Encl Penetration Seal | /03L-0:on 820318,breakers for Main Steamline Drain Valve,Inboard Torus Spray Stop Valve & Inboard Drywell Spray Stop Valve Found Tripped.Caused by Water Soaking Through Environ Encl Penetration Seal | |
| 05000245/LER-1982-008, Forwards LER 82-008/03L-0.Detailed Event Analysis Encl | Forwards LER 82-008/03L-0.Detailed Event Analysis Encl | |
| 05000336/LER-1982-008, Forwards LER 82-008/03L-0 | Forwards LER 82-008/03L-0 | |
| 05000336/LER-1982-009-01, Review of ECCS Subsystem Revealed Mode Changes Occurred Operating Under Action Statement.Caused by Misinterpretation Between Tech Spec Sections.Tech Spec Changed to Reduce Confusion | Review of ECCS Subsystem Revealed Mode Changes Occurred Operating Under Action Statement.Caused by Misinterpretation Between Tech Spec Sections.Tech Spec Changed to Reduce Confusion | |
| 05000336/LER-1982-009, Forwards LER 82-009/01T-0.Detailed Event Analysis Encl | Forwards LER 82-009/01T-0.Detailed Event Analysis Encl | |
| 05000245/LER-1982-009-03, /03L-0:on 820412,while Performing High Pressure Scram & Containment Isolation Functional Calibr Test, Pressure Switch 2206-1612D Failed to Trip at Desired Setpoint.Caused by Setpoint Drift.Switch Replaced | /03L-0:on 820412,while Performing High Pressure Scram & Containment Isolation Functional Calibr Test, Pressure Switch 2206-1612D Failed to Trip at Desired Setpoint.Caused by Setpoint Drift.Switch Replaced | |
| 05000245/LER-1982-009, Forwards LER 82-009/03L-0.Detailed Event Analysis Encl | Forwards LER 82-009/03L-0.Detailed Event Analysis Encl | |
| 05000336/LER-1982-010, Forwards LER 82-010/03L-0 | Forwards LER 82-010/03L-0 | |
| 05000245/LER-1982-010-03, /03L-0:on 820413,while Performing Emergency Svc Water Sys Operational Readiness Test,Valve 1-LPC-4A Failed to Open When Emergency Svc Water Pumps Started.Caused by Excessive Play in Potentiometer.Slider Adjusted | /03L-0:on 820413,while Performing Emergency Svc Water Sys Operational Readiness Test,Valve 1-LPC-4A Failed to Open When Emergency Svc Water Pumps Started.Caused by Excessive Play in Potentiometer.Slider Adjusted | |
| 05000245/LER-1982-010, Forwards LER 82-010/03L-0.Detailed Event Analysis Encl | Forwards LER 82-010/03L-0.Detailed Event Analysis Encl | |
| 05000336/LER-1982-010-03, /03L-0:on 820401,while at 100% Power,Svc Water Header a Removed from Svc to Repair Leak in Pipe Downstream to Reactor Bldg Closed Cooling Water HX Isolation Valve. Caused by Coating Failure.Leak Repaired | /03L-0:on 820401,while at 100% Power,Svc Water Header a Removed from Svc to Repair Leak in Pipe Downstream to Reactor Bldg Closed Cooling Water HX Isolation Valve. Caused by Coating Failure.Leak Repaired | |
| 05000336/LER-1982-011, Forwards LER 82-011/03L-0.Detailed Event Analysis Encl | Forwards LER 82-011/03L-0.Detailed Event Analysis Encl | |
| 05000245/LER-1982-011-03, /03L-0:on 820508,gas Turbine Trouble Annunciator Alarmed on Panel 908 in Control Room.Caused by Shorted Undervoltage Relay for Ac Lube Oil Pump.Undervoltage Relay Replaced.One Amp Fuse Will Be Added | /03L-0:on 820508,gas Turbine Trouble Annunciator Alarmed on Panel 908 in Control Room.Caused by Shorted Undervoltage Relay for Ac Lube Oil Pump.Undervoltage Relay Replaced.One Amp Fuse Will Be Added | |
| 05000245/LER-1982-011, Forwards LER 82-011/03L-0.Detailed Event Analysis Encl | Forwards LER 82-011/03L-0.Detailed Event Analysis Encl | |
| 05000336/LER-1982-011-03, /03L-0:on 820405,RCS Temp Dropped to 514 F.Caused by Borating to Control Xenon While Placing Turbine on-line Which Caused Power Reduction & Cooldown.Control Element Assemblies Withdrawn to Increase Power & Temp | /03L-0:on 820405,RCS Temp Dropped to 514 F.Caused by Borating to Control Xenon While Placing Turbine on-line Which Caused Power Reduction & Cooldown.Control Element Assemblies Withdrawn to Increase Power & Temp | |
| 05000336/LER-1982-012, Forwards LER 82-012/03L-0 | Forwards LER 82-012/03L-0 | |
| 05000245/LER-1982-012, Forwards LER 82-012/01T-0.Detailed Event Analysis Encl | Forwards LER 82-012/01T-0.Detailed Event Analysis Encl | |
| 05000336/LER-1982-012-03, /03L-0:on 820417,RBCCW Heat Exchanger Outlet Temp Control Valve 2-SW-8.1A Operated Erratically During Inservice Testing.Caused by Sheared Link/Shaft Pin.Shear Pin Replaced & Valve Tested Satisfactorily | /03L-0:on 820417,RBCCW Heat Exchanger Outlet Temp Control Valve 2-SW-8.1A Operated Erratically During Inservice Testing.Caused by Sheared Link/Shaft Pin.Shear Pin Replaced & Valve Tested Satisfactorily | |
| 05000245/LER-1982-012-01, /01T-0:on 820702,timer Which Inhibits Throttling LPCI Valve During First 5 Minutes Following LPCI Sys Initiation Found Wired Incorrectly.Timer Rewired & Tested Satisfactorily | /01T-0:on 820702,timer Which Inhibits Throttling LPCI Valve During First 5 Minutes Following LPCI Sys Initiation Found Wired Incorrectly.Timer Rewired & Tested Satisfactorily | |
| 05000245/LER-1982-013, Forwards LER 82-013/03L-0.Detailed Event Analysis Encl | Forwards LER 82-013/03L-0.Detailed Event Analysis Encl | |
| 05000336/LER-1982-013, Forwards LER 82-013/03L-0 | Forwards LER 82-013/03L-0 | |
| 05000336/LER-1982-013-03, /03L-0:on 820417,while at 100% Steady State Operation,Grounded Bus Traced to 2-CH-514 (Boric Acid Emergency Supply Charging Pump Suction).Plant Trip Occurred. Caused by Ground on Motor Valve Operator Overheating | /03L-0:on 820417,while at 100% Steady State Operation,Grounded Bus Traced to 2-CH-514 (Boric Acid Emergency Supply Charging Pump Suction).Plant Trip Occurred. Caused by Ground on Motor Valve Operator Overheating | |