05000336/LER-1996-039, Forwards LER 96-039-00 Which Documents Event That Occurred at Mnps,Unit 2 on 961106.Commitment Made within Ltr,Listed

From kanterella
Jump to navigation Jump to search
Forwards LER 96-039-00 Which Documents Event That Occurred at Mnps,Unit 2 on 961106.Commitment Made within Ltr,Listed
ML20133E306
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/08/1997
From: Price J
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20133E311 List:
References
B16133, NUDOCS 9701130002
Download: ML20133E306 (2)


LER-2096-039, Forwards LER 96-039-00 Which Documents Event That Occurred at Mnps,Unit 2 on 961106.Commitment Made within Ltr,Listed
Event date:
Report date:
3362096039R00 - NRC Website

text

% ggggg Millstone Offices

  • Hope Ferry Rd., Waterford, CT Utilities System p.o.rw i28 Waterford, CT 063M-0128

.(203) 447 1791 JAN 0 81997 ,

DocN tWS. SI d%M 1 816133 Re: 10 CFR 50.73(a)(2)(i)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 This letter forwards Licensee Event Report (LER) 96-039-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. 2 on November 6,1996. This LER is j being submitted pursuant to 10 CFR 50.73(a)(2)(i).  !

l The following are NNECO's commitments made within this letter. All other statements made within this letter are for information only.

B16133-01: Technical Specification surveillance procedures will be reviewed to ensure compliance with Technical Specification surveillance requirements as part of the Millstone Unit No. 2 Operational Readiness Plan. The review will initially focus on Technical Specification surveillance procedures required for Mode 6 and defueled. Surveillance procedures required for subsequent mode changes will be reviewed prior to mode entry. (This commitment was previously sent to the NRC in the response to NOV 336/96-08-07, NNECO Commitment No. B16076-2.)

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY t

Ni e. \\

4q, 970k130002970108 A. M U -

V PDR ADOCK 05000336 DirectorhVlillstone Unit No. 2 Q" S PDR /

cc: see page 2 083422 9 RF114 l

, U. S. Nucle:r Regulatory Commission B16133/Pags 2

Attachment:

LER 96-039-00 cc: W. D. Travers, Director of Special Projects i H. J. Miller, Region l Administrator  !

D. P. Beaulieu, Senoir Resident inspector (Acting), Millstone Unit No. 2 I D. G. Mcdonald, Jr., NRC Project Manager, Millstone Unit No. 2 I