05000336/LER-1997-037, Forwards LER 97-037-00,documenting Event That Occurred at Mnps,Unit 2,on 971126.Commitments Made by Util,Encl

From kanterella
Jump to navigation Jump to search
Forwards LER 97-037-00,documenting Event That Occurred at Mnps,Unit 2,on 971126.Commitments Made by Util,Encl
ML20197J156
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/22/1997
From: Price J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20197J161 List:
References
B16920, NUDOCS 9801020097
Download: ML20197J156 (3)


LER-2097-037, Forwards LER 97-037-00,documenting Event That Occurred at Mnps,Unit 2,on 971126.Commitments Made by Util,Encl
Event date:
Report date:
3362097037R00 - NRC Website

text

,.

/ ( .h R<ge ferry Rd. (bute 1%). c':terford, Ur Otum

( ,

Nuclear Faergy m,,,,,, %,, ,,,,,, 3,,,,,,

N< hurlear f.rrigy Corng.any

  • Waterfurd, Cr Dea $ 0128 (860) 417 1791 Fan (860) 444 4277 11,e Notti,caet ti tibtme System DEC 2 21997 Docket No. 50-336 '

B16920 Re: 10 CFR 50.73(a)(2)(v)  !

U.S. Nuclear Regulatory Commission Document Control Desk  ;

Washington, DC 20555 This letter forwards Licensee Event Report (LER) 97-037-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. 2, on November 27. 1997. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(v).

The NNECO's commitments made within this letter err included in Attachment 1.

Very truly yours, NORTH ST NUCLEAR ENERGY COMPANY

/_

J.A./P3ce Diredfor - Millstone Unit No. 2 Attachments: 1. List of Regulatory Commitments

2. LER 97-037-00 cc: H. J. Miller, Region 1 Administrator D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2 D. P. Beaul:au Senior Resident inspector, Millstone Unit No. 2 W. D. Travers, PhD, Director, Special Projects Office P. F. McKee, Deputy Director of Licensing, Special Projects Office W. D. Lanning, Deputy Director of Inspections, Special Projects Office ,

~ '

9901020097 971222 f ADOCK 0 6' g }') g

/

tum4 atv. > e ,,

pocket No. 50-336 B16290 Attachment 1 i Millstone Nucies.- Power Station, Unit No. 2 Commitments December 1997 i

l

l U.S. Nuclear Regul: tory Commission

. B16920\ Attachment 1\Page 1

. S Attachment 1

-9 Regulatory Commitment Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.

Any other actions discussed in the submittal represent intended or planned actions by NNECO. They are described to the NRC for the NRC's information and are not regulatory commitments. The Director Regulatory Affairs or Manager - Regulatory  ;

Compliance Unit 2 should be notified of any questions regarding this document or any associated regulatory comrnitments.

REGULATORY COMMITMENT COMMITTED DATE OR OUTAGE B16920-1: Service water piping Mode 6 from current outage internal inspections will be performed -

to locate the source of the piece of PVC liner material and to identify any additional ereas of damaged liner. An ,

engineering evaluation is being performed to determine the causa of the PVC liner failure.

B16920-2: Piping liner repairs will be Mode 4 from current outage performed as indicated by the piping inspection. At least one service water train will be completed prior to entering Mode 6 from the current outage. Both trains will be completed prior to entering Mode 4 from the current outage.

. _ - __-__ _ - - - - -. _. __ ---