05000336/LER-1998-006, Forwards LER 98-006-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 980327.LER Being Submitted Per 10CFR50.73(a)(2)(ii).NNECOs Commitments Made within Ltr Listed

From kanterella
Jump to navigation Jump to search
Forwards LER 98-006-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 980327.LER Being Submitted Per 10CFR50.73(a)(2)(ii).NNECOs Commitments Made within Ltr Listed
ML20247A364
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/24/1998
From: Price J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20247A371 List:
References
B17191, NUDOCS 9805060053
Download: ML20247A364 (4)


LER-2098-006, Forwards LER 98-006-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 980327.LER Being Submitted Per 10CFR50.73(a)(2)(ii).NNECOs Commitments Made within Ltr Listed
Event date:
Report date:
3362098006R00 - NRC Website

text

f-

  • 1 g g Repe Ferry Rd. (Route 156), Waterford, CT 06385 Nuclear Energy uiti,ioo. Nociear rower station f , ,

Northeast Nuc!<ar Energy Company P.O. Box 128 Waterford, CT 06'885-0128 1 (860) 447-1791 l Fu (860) 444-4277 l

l The Northeast Utilities System APR 2 41998 D00kel No,JO-33Q l B17191 l

l Re: 10 CFR 50.73(a)(2)(ii)

U.S. Nuclear Regulatory Commission Document Control Desk i Washington, DC 20555 l Millstone Nuclear Power Station Unit 2 Licensee Event Report 98-006-00 Reactor Building Closed Cooling Water System Outside Design i Basis Uoon Loss of Service Water l l This letter forwards Licensee Event Report (LER) 98-006-00, documenting an event i

that occurred at Millstone Nuclear Power Station, Unit No. 2 on March 27,1998. This

.LER is being submitted pursuant to 10 CFR 50.73(a)(2)(ii).

l The NNECO's commitments made within this letter are included in Attachment 1.

i Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY

~

L QV**D J.A. rice Dir or - Millstone Unit No. 2 Attachments: 1. List of Regulatory Commitments

2. LER 98-006-00 H. J. Miller, Region i Administrator I cc: {

D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2 D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 '

W. D. Travers, Ph.D, Director, Special Projects Office P. F. McKee, Deputy Director of Licensing, Special Projects Office fg[

/

W. D. Lanning, Deputy Director of inspections, Special Projects Office

'9905060053 990424 PDR ACOCK 05000336

Docket No. 50-336 B17191 Attachment 1 Millstone Nuclear Power Station, Unit No. 2 Commitments l

l l

i l-

, 1

l. l i

t April 1998 l

1 1

,' O.S. Nucl r Regul tory Commission i I

B17191\ Attachment 1\Page 1 t

1 Regulatory Commitment Enclosure  !

List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.

REGULATORY COMMITMENT COMMITTED DATE OR OUTAGE i

B17191-1: As a result of this event, procedure Mode 4 from current revisions will be implemented, prior to r. itering outage Mode 4 from the present outage, to ensure that upon loss of the associated Service Water pump, Service Water it restored or the Reactor Building Closed Cocling Water pump is shutdown.

I 1

I l

l

Docket No. 50-336 B17191 l

l Attachment 2 Millstone Nuclear Power Station, Unit No. 2 i

LER 98-006-00 April 1998