05000336/LER-1996-018, Forwards LER 96-018-01,documenting Condition That Was Discovered at Unit 2 on 960319.LER Suppl Provides Update on Analyses & Investigation of Condition.Attachment 1 Is Clarification of Original Commitment Associated W/Ler

From kanterella
Jump to navigation Jump to search
Forwards LER 96-018-01,documenting Condition That Was Discovered at Unit 2 on 960319.LER Suppl Provides Update on Analyses & Investigation of Condition.Attachment 1 Is Clarification of Original Commitment Associated W/Ler
ML20151T253
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/02/1998
From: Price J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20151T256 List:
References
B17425, NUDOCS 9809090323
Download: ML20151T253 (5)


LER-2096-018, Forwards LER 96-018-01,documenting Condition That Was Discovered at Unit 2 on 960319.LER Suppl Provides Update on Analyses & Investigation of Condition.Attachment 1 Is Clarification of Original Commitment Associated W/Ler
Event date:
Report date:
3362096018R00 - NRC Website

text

.

. ." Ned Rope Ferry Rd. (Houte 156), Weterford, CT 06385 Nucl:ar Energy wratoo, Nocica, ro er statioo Northeast Nuclear Energy Company P.O. Box 128 Waterford, Cr 06385-0128 (860) 447-1791 Fax (860) 444 4277 The Northemat Utilitice System SEP 2 1998 Docket No. 50-336 B17425 Re: 10 CFR 50.73(a)(2)(v) 1 I

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 l

Millstone Nuclear Power Station Unit No. 2 Licensee Event Report 96-018-01 Gaps Discovered in Enclosure Door Seals for Motor Control Centers B51 and B61 This letter forwards Licensee Event Report (LER) 96-018-01, documenting a condition that was discovered at Millstone Nuclear Power Station, Unit No. 2, on March 19, 1996. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(v). This LER supplement provides an update on the analyses and invest!gation of this condition.

The Northeast Nuclear Energy Company (NNECO) commitment described in Attachment 1 is a clarification of the original commitment associated with this LER.

/

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY 7Z MM J. A. Price

- Direct 6d- Millstone Unit No. 2 cc: see page 2 09 OD43 9809090323 980902 J' PDR ADOCK 05000336 S PDR i

I

, U.S. Nuclear Regulatory Commission B17425\Page 2 l Attachments: 1. List of Regulatory Commitments

2. LER 96-018-01 cc: H. J. Miller, Region l Administrator D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No 2 D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 E. V. Imbro, Director, Millstone ICAVP inspections i

l l

)

1 l

l l

l 1

l

, Docket No. 50-336 B17425 i

i Attachment 1 Millstone Nuclear Power Station, Unit No. 2 Commitments i

l September 1998 l

i i

-I l

4

, - U.S. Nuclear Regulatory Commission B17425\ Attachment 1\Page 2 Attachment 1 Regulatory Commitment Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.

REGULATORY COMMITMENT COMMITTED DATE OR OUTAGE B17425.01: The HELB barrier inspection program Prior to entry into Mode 4 will be improved so that the protective function of from the current outage the HELB protective barriers will be verified periodically. Utilizing the above program an inspection procedure will be developed and implemented so that doors and enclosures serving as a protective barrier for safety related equipment will be inspected and maintained as committed in NNECO letter B156G5, dated April 18,1996. The procedure will be implemented and the inspection conducted prior to entry into Mode 4 from the current outage. (This commitment is the same as, and supersedes, commitment B15665.03. This commitment has been reworded for clarity).

i l

l

- 1 i

l

Docket No. 50-336.

B17425 L

Attachment 2 Millstone Nuclear Power Station, Unit No. 2 LER 96-018-01 l

?

1 i

i i

c i

I-3

?

5 4

4

i September 1998  !

J 4

l 4

v ~ ,.- ,- , , , , , - - - , .