Forwards LER 97-009-01,documenting Condition Discovered at Mnps,Unit 2 on 970325.Suppl Provides Update on Analysis for Condition,Including Identification of Addl Deficiencies. Commitments Made by Util,Encl
ML20203B011
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/01/1999
From: Price J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20203B015 List:
References
B17599, NUDOCS 9902100174
Download: ML20203B011 (4)


LER-2097-009, Forwards LER 97-009-01,documenting Condition Discovered at Mnps,Unit 2 on 970325.Suppl Provides Update on Analysis for Condition,Including Identification of Addl Deficiencies. Commitments Made by Util,Encl
Event date:
Report date:
3362097009R00 - NRC Website

text

. -- _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ - _ - _ - _ - - _ _ _ _ - _ _ _ - - .

, g Rope Ferry Rd. (Route 156), Ttserford, Cr 06385 M eat' b rE7 Milletene Nuclear Power Station hortheast Nuclear Energy Company P.O. Box 128

, Taterford, CT 06385-0128 (860) 447 1791 Fas (860) 444-4277 m heribean Utilities synem FEB - l 1999 Docket No. 50-336 B17599 Re: 10 CFR 50.73(a)(2)(i)

U.S. Nuclear Regulatory Commission Document Control Desk - ,

Washington, DC 20555 -

Millstone Nuclear Power Station Unit No. 2 Licensee Event Report 97-009-01 Insufficient ESFAS Surveillance Testina (Generic Letter 96-01 Review)

This letter forwards Licensr.,e Event Report (LER) 97-009-01, documenting a condition that was discovered at Millstone Nuclear Power Ste!on, Unit No. 2 on

. March 25,1997. This LER supplement provides an update on the analyses for this condition, including the identification of additional deficiencies identified during the investigation of this condition. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(i).

The Northeast Nuclear Energy Company's (NNECO) commitments made within this letter are included in Attachment 1.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY jI I

l J. (A.' Price Dipror - Millstone Unit No. 2 cc: see page 2 /g 9902100174 990201 " ~

PDR ADOCK 05000336 s PDn_

osu n.s u v.n.n .

lir .ii.. .

. . . . . . - . . ~ . . .. - - - - - .- -. .. . . - . _ . . . - - . . - - -. -

U.S. Nuclear Regulatory Commission B17599\Page 2

. t Attachments: 1. List of Regulatory Commitments  ;

2. LER 97-009-01 cc: H. J. Miller, Region i Administrator S. Dembek, NRC Project Mar,ager, Millstone Unit No. 2  :

. D. P. Beaulieu, Senior Resicent inspector, Millstone Unit No. 2 [

E. V. Imbro, Director, Millstone ICAVP inspections l I

s e

4 4

. -. . . ,-. .- . . - . - - . . _ . - . . . . . . . . . . _ . . . . . . . - . . - . ~ . - . . . - . - . .

aT l 1

1

)

Docket No. 50-336 B17599 1

)

l, i

)

i i

i I

I Attachment 1 Millstone Nuclear Power Station, Unit No. 2 l

Commitments I

I l \

l l

February 1999 i

l l

1- , . - , , _ _ _ _ _ _

s _ . , -

.- -- _. - _ = . . - - . _ . . _ _ .

U.S. Nuclear Regulatory Commission l B17599%ttachment 1\Page 1 1

. Attachment i Regulatory Commitment Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this l document.

REGULATORY COMMITMENT COMMITTED DATE OR OUTAGE i B17599.01: Operational surveillances (which Mode 4 from current ]

perform the functional tests required by the facility outage )

TS) associated with deficiencies identified under l the GL 96-01 review will be revised prior to entry  ;

into Mode 4 from the current outage to ensure that l TS functional requirements are satisfied. j 1

l l

l 1

l l

l 1

J e

)

l . .

Docket No. 50-336 B17599 l

l Attachment 2 Millstone Nuclear Power Station, Unit No. 2 l

LER 97-009-01 1

i i

I l

i \

i i

1 February 1999 4

1 l l

+

4

.