05000336/LER-1996-003, Forwards LER 96-003-01,documenting Event That Originally Occurred at Mnps,Unit 2,on 960205.Encl Provides Final Update on Analyses & Investigation for Event.Commitments Made by Util Are Included in Attachment 1

From kanterella
Jump to navigation Jump to search
Forwards LER 96-003-01,documenting Event That Originally Occurred at Mnps,Unit 2,on 960205.Encl Provides Final Update on Analyses & Investigation for Event.Commitments Made by Util Are Included in Attachment 1
ML20151V392
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/04/1998
From: Price J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20151V394 List:
References
B17238, NUDOCS 9809140293
Download: ML20151V392 (4)


LER-2096-003, Forwards LER 96-003-01,documenting Event That Originally Occurred at Mnps,Unit 2,on 960205.Encl Provides Final Update on Analyses & Investigation for Event.Commitments Made by Util Are Included in Attachment 1
Event date:
Report date:
3362096003R00 - NRC Website

text

. . _ . _ _ _ _ . _ . . _ _ _ _ . . _ _ . ~ _ . . . _ _ _ _ _ _ _ _ . . _ . . . _ . _ . _ _ _ _ _ .

g-gg

, Rope Ferry Rd. (Route 156), hterford, CT 06385 l~ Nuclear Energy Millstone Nuclear Power Station Nonheast Nuclear Energy Company P.O. Box 128

. Waterford, CT 06385-0128 (860) 447-1791 Fax (860) 444-4277 The Northeast Utilities System SEP 4 1958 Docket No. 50-336 B17238 Re: 10 CFR 50.73(a)(2)(i)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit No. 2 Licensee Event Report 96-003-01 Requirement to Enter Technical Specification Limiting Condition for Operation 3.0.3 Following Discovery of Ice Blockage in Common Service Water Strainer Backwash Discharoe Line Not Recoanized This letter forwards Licensee Event Report (LER) 96-003-01, documenting an 4 event that originally occurred at Millstone Nuclear Power Station, Unit No. 2, on  !

February 5,1996. This LER supplement is being submitted pursuant to 10 CFR 50.73(a)(2)(i), and provides a final; update on the analyses and investigation for this event.

The Northeast Nuclear Energy Company (NNECO) commitments made within this letter are included in Attachment 1.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY i

J.A.PF

.f, "g Directi r Millstone Unit No. 2 I cc: See Page 2 99 l

/

9909140293'990904 Y FDR ADOCK 05000336 S PDR g

. U.S. Nucirr Regul tory Commission -

B17238\Page 2 i l'

Attachments: 1. List of Regulatory Commitments

2. LER 96-003-01 l cc: H. J. Miller, Region I Administrator ,

D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2 D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 .

E. V. Imbro, Millstone ICAVP inspections  :

i r

I i

l

.-. . _ _ _ . . - . -.- . . . . - . _ _ , - _ . - _ . . - - . - . ~ - _ . - . - . . . . . _ - . . .

i I i l

Docket No. 50-336 B17238 l

i Attachment 1 Millstone Nuclear Power Station, Unit No. 2 Commitments 1

i

)

1

~

\-

! September 1998  ;

i 1

J l

I t

. U.S. Nucl=r Rtgulatory Commission I B17238\ Attachment 1\Page 1 ,

Regulatory Commitment Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.

REGULATORY COMMITMENT COMMITTED DATE OR OUTAGE B17238.01: Design Basis Summary Documents have Complete ,

been prepared to identify Technical Specification safety ,

systems cross-referenced to their appropriate support systems. These summaries serve as a reference tool to those individuals performing operability determinations.

B17238.02: To improve methods for effectively Complete implementing change at Millstone, a number of programmatic methods, such as Configuration Control Process, Design Control, Corrective Action Program, Self-Assessment, Independent Oversight, Procedural Adherence and Upgrade, and the Employee Concerns Program,' have been instituted at the station and are addressed in the Millstone Unit 2 Operational Readiness Plan. In addition, the Operations Department Excellence Plan was developed to create an atmosphere that recognizes the need for changes to raise plant-operating standards, to raise management standards, and to improve the conduct of plant operations.

B17238.03: An Operability Determination procedure has Complete been implemented that contains the appropriate guidance on performing operability determinations including initiation, review, approval and acceptability.

B17238.04: Training of Operations personnel has been Complete

completed which addressed the impact of various non-Technical Specification support systems upon safety systems. In addition, appropriate station personnel have received Operability Determination training.

s F

l

?

I

. _ ~. __ _ _ _ . _ . _ . . _ . _ _ . . _ . . _ - .._ _ _ _ . _ . _ _ _ _ _ _ _ _ . _ _ _

l I

I l

Qp_cket No. 50-336  :

B17238 1 1

i r

i e

r Attachment 2 i

Millstone Nuclear Power Station, Unit No. 2 LER 96-003-01 f

9 1

1 i

i t

September 1998 l

.a- " - ,- -s

&. .m

.' .s. > . '. .,

. -, .ys ,

- };;n :

t s f '. :t 5 *

,_ .+ 4 ;;p

. ,j ._,1

-.T t

,_' .::f '}_

.13 '

e ," { t *

  • ,4. ,.

?w. 'f H- : ,3.,.

,_