05000336/LER-1999-005, Forwards LER 99-005-00,documenting Condition That Was Discovered at Millstone Nuclear Station,Unit 2 on 990223. Util Commitments Made within Ltr Included in Attachment 1

From kanterella
Jump to navigation Jump to search
Forwards LER 99-005-00,documenting Condition That Was Discovered at Millstone Nuclear Station,Unit 2 on 990223. Util Commitments Made within Ltr Included in Attachment 1
ML20196K559
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/24/1999
From: Price J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20196K562 List:
References
B17709, NUDOCS 9904010282
Download: ML20196K559 (4)


LER-2099-005, Forwards LER 99-005-00,documenting Condition That Was Discovered at Millstone Nuclear Station,Unit 2 on 990223. Util Commitments Made within Ltr Included in Attachment 1
Event date:
Report date:
3362099005R00 - NRC Website

text

Ndg R0Pe Ferry Rd. (Route 156), Waterford, CT 06385 k NuclearEnergy niiisioo. Nuciear power station Northeast Nuclear Eoergy Company P.O. Box 128 Waterford, CT 06385-0128 (860) 447-1791 Fax (860) 444-4277 The Northeast Utilities System MAR 2 41999 Docket No. 50-336 B17709 Re: 10 CFR 50.73(a)(2)(i)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555  ;

Millstone Nuclear Power Station, Unit No. 2 ,

Licensee Event Report 99-005-00 Insufficient verification of Technical Specification Surveillance 4.8.2.3.2, 125 Volt Class 1E Batterv Bank Load Test This latter forwards Licensee Event Report (LER) 99-005-00, documenting a condition that was discovered at Millstone Nuclear Power Station, Unit No. 2, on February 23, 1999. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(i).  ;

The Northeast Nuclear Energy Company's (NNECO) commitments made within this l letter are included in Attachment 1.  !

Very truly yours, //

NORTHEAST NUCLEAR ENERGY COMPANY Abb J.'AJ ~ Price D cector - Millstone Unit No. 2 010015 Attachments: 1. List of Regulatory Commitments

2. LER 99-005-00 l

cc: H. J. Miller, Region i Administrator S. Dembek, NRC Project Manager, Millstone Unit No. 2 D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 E. V. Imbro, Director, Millstone ICAVP Inspections j 9904010282 990324

~

{DR ADOCK 05000336 PDR I

~ '

Docket No. 50-336 B17709 l

i 1

Attachment 1 i

Millstone Nuclear Power Station, Unit No. 2 Commitments j

March 1999

U.S. Nucl:ar Regul: tory Commission B17709\ Attachment 1\Page 1 Attachment 1 Regulatory Commitment Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.

REGULATORY COMMITMENT COMMITTED DATE OR OUTAGE B17709.01: Design controls and administrative Complete controls have been implemented to ensure that the most recent battery load profile tests (performed in November 1998 and January 1999) are adequate to meet the applicable TS surveillance requirements. These controls include physical disconnection of some loads and manual (in lieu of automatic) loading of other non-esseniia! load (s).

B17709.02: The applicable surveillance RFO 13 procedure shall be revised and performed prior to the completion of Refueling Outage Thirteen to ensure that battery capacity is verified for actual emergency loads.

1 I

l l

1 j

1

L Docket No.50-33Q B17709 l

Attachmerit 2 Millstone Nuclear Power Station, Unit No. 2 LER 99-005-00 1

1 March 1999

,