Provides List of Commitments Re LER 96-037
ML20133C597
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/31/1996
From: Price J
NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20133C603 List:
References
B16115, NUDOCS 9701080004
Download: ML20133C597 (2)


LER-2096-037, Provides List of Commitments Re LER 96-037
Event date:
Report date:
3362096037R00 - NRC Website

text

f

. Northe:st m., ome . . iwi.e errry iu., worr.,ni, er Utilities System p.o,it, 128 Waterrortl, CT 0638*2-0128 (203) 447-1791 DEC 311996 Docket No. 50-336 B16115 Re: 10 CFR 50.73(a)(2)(i) i U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 l l

l This letter forwards Licensee Event Report (LER) 96-037-00, documenting an event that I occurred at Millstone Nuclear Power Station, Unit No. 2 on December 2,1996. This LER is I being submitted pursuant to 10 CFR 50.73(a)(2)(i). j The following are NNECO's commitments made within this letter. All other statements made within this letter are for information only.

B16115-01: As a result of this event, a Technical Specification revision will be initiated to remove the requirement to take the average temperature 1 of the ultimate heat sink at the Unit 2 intake structure. Included in this is a revision of the Technical Specification Bases to identify instrumentation to be used to perform the Technical Specification surveillance. This revision will be submitted to the NRC by March 31,1997.

B16115-01: Technical Specification surveillance procedures will be reviewed to ensure compliance with Technical Specification surveillance ,

requirements as part of the Millstone Unit No. 2 Operational / j Readiness Plan. The review willinitially focus on Technical I //  !

Specification surveillance procedures required for Mode 6 and defueled. Surveillance procedures required for subsequent mode changes will be reviewed prior to mode entry. (The above -

p'N 0?Onen 9701000004 961231 PDR ADOCK 05000336 S PDR 08",422 9 REY.195

- - . _ _ ~ . . - . . . . -. - . . . . . . . .-. . . - . . .. .. ~ - . .. -

2 I

U. S. .Nuclarr Rggulatory Commission

-

  • B16115/Page 2 l

commitment was previously sent to the NRC in the response to NOV 336/96-08-07, NNECO Commitment No. B16076-2.)

l l l

l l  :

l Very truly yours, l

?

l NORTHEAST NUCLEAR ENERGY COMPANY

! i l

N l l

t J.A.Fbr)W

! Directg/- Millstone Unit No. 2 l

Attachment:

LER 96-037-00 ,

i l cc: W. D. Travers, Director of Special Projects H. J. Miller, Region i Administrator

! D. P. Beaulieu, Senoir Resident inspector (Acting). Millstone Unit No. 2 D. G. Mcdonald, Jr., NRC Project Manager, Millstone Unit No. 2 l