05000336/LER-1983-012, Updated LER 83-012/03X-1:on 830322 & 26,charging Pump C Shut Down Due to Lost Oil Pressure.Caused by Failed Integral Oil Pump Drive Coupling.Coupling Repaired

From kanterella
Jump to navigation Jump to search
Updated LER 83-012/03X-1:on 830322 & 26,charging Pump C Shut Down Due to Lost Oil Pressure.Caused by Failed Integral Oil Pump Drive Coupling.Coupling Repaired
ML20087N194
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/12/1984
From: Komosky G, Mroczka E
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
LER-83-012-03X, LER-83-12-3X, MP-5865, NUDOCS 8404030204
Download: ML20087N194 (3)


LER-2083-012, Updated LER 83-012/03X-1:on 830322 & 26,charging Pump C Shut Down Due to Lost Oil Pressure.Caused by Failed Integral Oil Pump Drive Coupling.Coupling Repaired
Event date:
Report date:
3362083012R00 - NRC Website

text

-

CC 8 CIM 366 U $ NL8CL tc2 RE GUL A10 h COvv'ESiON

  • ?M * UPDATE REPORT - PREVIOUS REPORT LICENSEE EVENT REPORT DATE APRIL 22, 1983 (PLEAst paint On TvPt ALL stouinto mFOmuAtiOm costmOL stoen: l l l l l l@

1 toll@

l o Ii8 l9 l C L6Clutt l T lCOOL M l N l S l 2 l@160 l0 l- l0 l0 l0 l0 l0 l- l0L6;t%5L to LICt h11 hsW8 E m 28 l0 l@M4_l TvPt Jo 6 7 C.T I l 1l 1l@l CON'T o1il a

l'!"c' Q10 .o l 5 l 0 l 0ooc.g,%sontn si l 0 l 3 l 3 l 6 @l se 0 l 3e,est e, l 2 l2 castl 8 l3 @l Ol 3 34 is l1 l eais

. .o.3 2 l 8 l so4 l@

tVEN1 DESCRIPTION AND PROS.BLE CONSEoJENCt5 h

[T]T) l During routine steady state power operation with the A charging ptwp tagged out pyyy] e for maintenance and the B+C pumps in service, oil pressure was lost on the C g o , i pump and it was shut down; subsequently 4 days later, the C ptop was shut down l c 3 g again due to low oil pressure. The plant was operated in accordance with j io yg Technical Specification statcsmnts 3.1.2.2, 3.1.2.4, tuid 3.5.2 for 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> 33 g gi minutes in the first case and 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 8 minutes in the subsequent case. Similar j gg LER's: None, g oc CDE Co E S 90 t Co4*0NENT Ct DE Ssn og s)N Q7 8 l Cl Bl@ W@ W@ lM lE lC lF lU lN lh W@ W @t 9 to 11 12 13 16 19 20

  • I V'8'O%

St OJt NTi.t OCCsanENCE REromi tyfNTygam at*DAt h0 CODE TYPE hD.

tra ac

@,aj,Po,p 18 l3 ]

21 22 lJ 23 l01112 i 24 M Ld 27 10131 N M lx 30 J L--J 31 Lil 32 T ag%

.ti ea T w 'a t*0JRs 5i Foa g er,i w sds. T ata Wllj@ [2_j@ [2j@ 10 l01010 l LM@

3E 37 40 41 LLj@

42 l43LI@ lc as I 014 l 5l@

47 33 34 Jt cAUSE DtSCRIPTION AND CORRECTivt ACTIONS h

, o l C charging pump oil pressure was lost due to failure of the drive coupling for y g, the integral oil punp. Subscquently, after repairs were made, the drive g coupling set screw backed-out, disengaging the coupling, and the pump was again ,

shut down. Feinstallation was done and the set screw was staked to prevent g

, , g gy loorening. g

=

, .o

's'& mia or .,,.rus @ s'd2iK o,5:om, otsC.,nio~ @

@ W @ g,,,

1 l1l0l0l@l o n NA

.4 l W

.s

@l Operator Observation

.e l

. ,g,,

Ri toCr.oso,.iaur@

Q [ause o, . aufZj @ @10l A NAousto..: mirv @l l de 46 NA E

I 1 8 y tt PImsoNNEL EEPO5 Vats svuwstm TYPE Q l 0 l 0 l 0 @y@OtsCRIPTio% l NA ]

' m so~~it..u # is SJwsta 8404030204 840312 i e oe 10 l 0 l 0 l@ot5C"'"' *b is

]

i2 NA PDR ADOCK 05000336 S PDR

'#5 ' "of'".",','IR '"" @

Q e@,l 7 e ic NA oc l

    • "* NRC USE ONLY ,

8, wd, O,,n,o.,@

i NA l lllllllllllllj m.

Gary E. Komosky gg (203) 447-1791 X4725 ,(

UPDATE REPORT - PREVIOUS REPORT DATE APRIL 22, 1983 ATTACHMENT 'IO LER 83-012/3X-01 NORTHEAST NUCLEAR E'EIGY CmPANY MILISKNE NUCLFAR POWER STATION - UNIT 2 FACILITY OPERATING LICENSE NUMBER DPR-65 DOCKET NO. 50-336 CAUSE DESCRIPTIN AND CURRrLnVE ACTICN:

On March 22, 1983 with the A charging pmp tagged out for maintenance and the B+C charging pumps on line, the drive coupling for the integral oil punp of the C charging punp failed, causing a loss of oil pressure, consequently the pump was shut down.

The drive coupling and the integral oil punp were replaced. The cause of the failure of the drive coupling is unknown.

During the repair of the C charging pump, the A charging punp was returr.ad to service.

On March 26, 1983, with the A charging punp tagged out for maintenance and the B+C charging punps on line, the set screw that holds the oil pump drive coupling in place backed out, allowing the coupling to disengage. At this point oil pressure was lost on the C charging pump and the pump was shut

. down.

The drive coupling was reinstalled and the set screw was tightened and staked to prevent future loosening. The set screws for the drive coupling of the A+B charging punps have been inspected, tightened, and staked. The charging punp overhaul procedure has been changed to stake these set screws when the pump is overhauled.

The charging punps are Gaulin model no. NP18; the coupling and set screw are provided by Gaulin and are listed as iterrs 21 (part No. M0019 - oil punp coupling) and 28 (part No. 820185 - oil pump coupling set screw) on Gaulin drawing D15424, Power End Assembly.

j

s F **

General Offices

,, co,,,,cion iu,.r e w co. P.O. BOX 270 9 .nw 4u.ow,,s itec'aic co***

HARTFORD. CONNECTICUT 06141-0270

%,m . e. = = cow *""

,,0.......w--. (203) 666-6911 ar] stress.3, s uCLt Redmov conapeeve March 12, 1984 MP-5865 Dr. 'Ihmas E. M1rley Regional Administrator, Region I II. S. Nuclear Regulatory Cmmission 631 Park Avenue King of Prussia, Pennsylvania 19406

Reference:

Facility Operating License No. DPR-65 Docket No. 50-336 Reportable Occurrence RO 50-336/83-12/03X-1

Dear Dr. M1rley:

This letter forwards the update Licensee Event Peport 83-12 concerning operation of the unit with a limiting condition for operation in a less conservative cordition than is established in the Technical Specifications.

Ar. additional three copies of the report are enclosed.

Yours truly, NORPHEAST NUCLEAR ENERGY CWPANY E. J. Mroczka Station Superintendent Millstone Nuclear Power Station FJM/G:mo Attachnent: LER RO 83-12/03X-1 cc: Director, Office of Inspection and Enforcement, Washington, D. C. (30)

Director, Office of Management Information and Program Control, Washington, D. C. (3)

U. S. Nuclear Regulatory Ccumission, c/o Document Managment Branch, Washington, D. C. 20555 Or bv hm