05000336/LER-1982-053, Forwards LER 82-053/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-053/03L-0
ML20083P017
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/28/1983
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20083P019 List:
References
MP-4630, NUDOCS 8302030332
Download: ML20083P017 (1)


LER-2082-053, Forwards LER 82-053/03L-0
Event date:
Report date:
3362082053R00 - NRC Website

text

_ _ _ _ _

NORTHEAST IFFII.rFIES vm u w etturie'** * *"*'*' P.O. BOX 270 J rea mmos anmo m'"" HARTFORD. CONNECTICUT 06101

? 17.' :l,t';"*"* (2 w) s w sett L L A  ::: C;?;;;.::':::::

January 28, 1983 MP-4630 Mr. Ronald C. Haynes Regional Mninistrator, Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Cm mission 631 Park Avenue King of Prussia, Pennsylvania 19406 Referencer Facility Operating License No. DPR-65 Docket No. 50-336 Reportable Occurrence RO 50-336/82-53/3L-0

Dear Mr. Haynes:

This letter forwards the Licensee Event Report 82-53/3L-0 required to be subnitted within thirty days pursuant to Millstone Unit 2 Appendi:: A Technical Specifications, Section 6.9.1.9.b, conditions leading to operation in a degraded mode permitted by u limiting condition. An additional three copies of the report are enclosed.

Yours truly, NORTHEAST NUCLEAR ENERGY CmPANY

//

/E M 'd<L E. J. Mroczka Station Superintendent Millstone Nuclear Power Statior.

EJM/BD:mo

Attachment:

LER RO 82-53/3L-0 cc: Director, Office of Inspection and Enforcement, Washington, D. C. (30)

Director, Office of Management Information and Program Control, Washington, D. C. (3)

U. S. Nuclear Regulatory Cmmission, c/o Docunent Management Bra"^h, Washington, D. C. 20555 8302030332 830128 PDR ADOCK 05000336 C PDR

%@