05000336/LER-1996-038, Forwards LER 96-038.Commitments Made Re LER Submitted

From kanterella
Jump to navigation Jump to search
Forwards LER 96-038.Commitments Made Re LER Submitted
ML20133C584
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/31/1996
From: Price J
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20133C587 List:
References
B16119, NUDOCS 9701080002
Download: ML20133C584 (2)


LER-2096-038, Forwards LER 96-038.Commitments Made Re LER Submitted
Event date:
Report date:
3362096038R00 - NRC Website

text

. . - . . . .-. - .- . .

,,.'i Northeast men, omce. . a m .e rerry u nierrora. cr gp Utilities System i,.o. is,, 3.,,8 l

%terrord. Ur 06385-0128 (203) 447-1791 I

i DEC 311996 i Docket No. 50-336 B16119 Re: 10 CFR 50.73(a)(2)(i)

)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 l 1

This letter forwards Licensee Event Report (LER) 96-038-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. 2 on December 2,1996. This LER is 1 being submitted pursuant to 10 CFR 50.73(a)(2)(i).

The following are NNECO's commitments made within this letter. All other statements made within this letter are for information only.

B16119-01: Technical Specification surveillance procedures will be reviewed to ensure compliance with Technical Specification surveillance requirements as part of the Millstone Unit No. 2 Operational Readiness Plan. The review will initially focus on Technical Specification surveillance procedures required for Mode 6 and defueled. Surveillance procedures required for subsequent mode ,

changes will be reviewed prior to mode entry. (This commitment i was previously sent to the NRC in the response to NOV 336/96 07, NNECO Commitment No. B16076-2.)

\

\

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY gf s% '

070054

/

  • 9701000002 961231 ' l" PDR ADOCK 05000336 J.A.9rfe s PDR DirectM - Millstone Unit No. 2 cc: see page 2 OH3422 9 REV l 95

. - - . . . _ . - . -. - _ ..- . - .-. ~.. .. ...~.-.. .-- -- - ... _ . . _ _ . . . - .

i l I

,U. S. Nuciscr Rsgulatory Commission B16119/Pags 2  ;

} )

1

Attachment:

LER 96-038-00 4

l cc: W. D. Travers, Director of Special Projects

H. J. Miller, Region I Administrator
D. P. Beaulieu, Senior Resident inspector (Acting), Millstone Unit No. 2
D. G. Mcdonald, Jr., NRC Project Manager, Millstone Unit No. 2  ;

i l 4

i d

i l i

l l

I l

l