05000336/LER-1999-008, Forwards LER 99-008-00,documenting Event That Occurred at Unit 2 on 990511.Util Commitments Made within Ltr Included in Attachment 1

From kanterella
Jump to navigation Jump to search
Forwards LER 99-008-00,documenting Event That Occurred at Unit 2 on 990511.Util Commitments Made within Ltr Included in Attachment 1
ML20195H867
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/09/1999
From: Schwarz C
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20195H872 List:
References
B17800, NUDOCS 9906180022
Download: ML20195H867 (4)


LER-2099-008, Forwards LER 99-008-00,documenting Event That Occurred at Unit 2 on 990511.Util Commitments Made within Ltr Included in Attachment 1
Event date:
Report date:
3362099008R00 - NRC Website

text

__

. Northeast Roge Feny Rd. (Route W), Woedord, CN385 Nuclear Energy mustoo. Noaear rown stauon Northeast Nudcar Energy Cominy P.O. Box 128 Waterford, CT 00385-0128 (860) 447 1791 Fax (860) 444-4277 1he Northeast Utilities System M 9M Docket No. 50-336 B17800 Re: 10 CFR 50.73(a)(2)(i)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit No. 2 Licensee Event Report 99-008-00 Auxiliary Feedwater Regulating Valve Failed j Surveillance Test. Entry into Technical Specification 3.0.3  ;

i This letter forwards Licensee Event Report (LER) 99-008-00, documenting an '

event that occurred at Millstone Nuclear Power Station, Unit No. 2, on May 11,1099. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(i).

Northeast Nuclear Energy Company's (NNECO) commitments made within this letter are included in Attachment 1.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY f N 4-~ _ - ,

MJ. O

~

C.

Drfector - Millstone Unit No. 2 l

1  !

i Attachments: 1. List of Regulatory Commitments j l

2. LER 99s008-00 cc: H. J. Miller, Region I Administrator /

R. B. Eaton, NRC Senior Project IMnager, Millstone Unit No. 2 / D@V D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 9906100022 990609

= ao" " 8J'

I Docket No. 50-336 B17800 l

Attachment 1 Millstone Nuclear Power Station, Unit No. 2 Commitments i

i l

June 1999 i

.U.S. Nucl=r R:gulttory Commission B17800\ Attachment 1\Page 1 Attachment 1 Regulatory Commitment Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.

REGULATORY COMMITMENT COMMITTED DATE OR OUTAGE B17800.01: Applicable procedures will be revised August 1,1999 to provide additional guidance on determining action required upon failure of the monthly inservice operability test.

j

Docket No. 50-336 ,

B17800 l i

i I

I Attachment 2 Millstone Nuclear Power Station, Unit No. 2 LER 99-008-00 I

June 1999 1

d