Forwards LER 97-026-00,documenting Event That Occurred at Facility on 970729.Commitments Made within Ltr,Listed
ML20210R292
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/28/1997
From: Price J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20210R298 List:
References
B16713, NUDOCS 9709030064
Download: ML20210R292 (2)


LER-2097-026, Forwards LER 97-026-00,documenting Event That Occurred at Facility on 970729.Commitments Made within Ltr,Listed
Event date:
Report date:
3362097026R00 - NRC Website

text

'

' Ned """ "'7 "d- (""" ' 56)' ' '"d' 'T 6885 hh Ntwicar Faern- uai.i< Nuci.a,s' ,si.iion Northeast Nuricar l'.rmgy C4ssyiatiy I'.O. Ikin 128 Waterford. Cr 06385 0128 l

(203) 447 1791 I'as (203) 444 4277 m Nortleast Utumes Byetern I'

August 28,1997 Dockot No. 50-336 j B16713 Re: 10 CFR 50.73(a)(2)(iv)-

l U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 This letter forwards Licensee Event Report (LER) 97-026-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. 2 on July 29,1997. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(iv).

The following are NNECO's commitments made within this letter.

B16713-01: A briefing will be prov) ed to Operations personnel prior to September 30,1997 regarding the need to analyze equipment which is planned to be left in an indeterminate state.

B16713-02: Prior to January 31,1998 a root cause evaluation will be completed and corrective action (s) deemed appropriate by facility management shall be implemented.

& i Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY J.A. Yd F/ro:e

, y sq y ,aos -

Direct /r - Millstone Unit No. 2

(,11449% RI%' 1 m"mumL:

S PDR

U. S Nuclear Regulatory Commission B1G713/Page 2 w

I

Attachment:

LER 97-026-00 W

kh '

cc: H J. Miller, Region i Administrator D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2 D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 W. D. Travers, PhD, Director, Special Projects Office P. F. McKee, Depu'y Director of Licensing, Special Projects Office W. D. Lanning, Deputy Director of Inspections, Special Projects Office i_

i L

- . - - - ' '