05000336/LER-1997-020, Forwards LER 97-020-03,documenting Condition That Was Discovered at Mnps,Unit 2,on 970423.LER Supplements Update on Analyses & Investigation of Condition.Commitments Made by Util Are Included in Attachment 1

From kanterella
Jump to navigation Jump to search
Forwards LER 97-020-03,documenting Condition That Was Discovered at Mnps,Unit 2,on 970423.LER Supplements Update on Analyses & Investigation of Condition.Commitments Made by Util Are Included in Attachment 1
ML20239A360
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/31/1998
From: Price J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20239A361 List:
References
B17422, NUDOCS 9809090096
Download: ML20239A360 (4)


LER-2097-020, Forwards LER 97-020-03,documenting Condition That Was Discovered at Mnps,Unit 2,on 970423.LER Supplements Update on Analyses & Investigation of Condition.Commitments Made by Util Are Included in Attachment 1
Event date:
Report date:
3362097020R00 - NRC Website

text

, _ - - _ __ _ - - _ - _ - _ - - . _ - _ _ _ . - _ - - _ - _ _ _ _ _ _ _ - - - -

, g Rope Ferry Rd. (Route 156), Wr.terford, CT 06385

_ Nuclear Energy wai. tone Nuclear Power Sation Northeast Nuclear Energy Company P.O. Box 128 Waterford, Cr 06385-0128 (860) 447-1791 Fax (860) 444-4277 Tbc Northeast Utilities System ALG 3 l 1998 Docket No. 50-336 )

B17422 Re: 10 CFR 50.73(a)(2)(i)

-. U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MilIstone Nuclear Power' Station Unit No. 2 i Licensee Event Report 97-020-03

- Insufficient Verification of Boron Iniection Flowcaths l This letter forwards Licensee' Event Report (LER) .97-020-03, documenting a condition that was discovered at Millstone Nuclear Power Station, Unit No. 2, on -  !

April 23,1997. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(i).

I L This LER supplement provides an update on the analyses and investigation of l this condition. There are no regulatory commitments contained within this letter. ,

The Northeast Nuclear Energy Company (NNECO) commitments made within this letter are included in Attachment 1. 7,7 Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY i- J. A. P? ice Diregtpr - Millstone Unit No. 2 l

L cc: see page 2 is n

. i (, d

.a 9809090096 980831 'e PDR 8 ADOCK 05000336 png, ua

-c 083422-5 REV.12 95 -

I d.

l l . U.S. Nucliar R:gulatory Commission B17422\Pcge 2 Attachmer)ts: 1. List of Regulatory Commitments

2. LER 97-020-03 cc: H. J. Miller, Region I Administrator D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2 D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 E. V. Imbro, Director, Millstone ICAVP Inspections l

l l

I I

j :-

L I

i

i l l

Docket No. 50-336 B17422 l

Attachment i l

Millstone Nuclear Power Station, Unit No. 2 Commitments I

l.

L l

l i.

I ll l l

l August 1998 4

{'

I c . _ - - _ - - _ - _ - - _ _ - _ - - _ _ _ - - _ - _ _ _ _ la

~

. U.S. Nucl:cr R gul: tory Commission B17422\Att:chment 1\P gs 1 i

. Attachment 1 Regulatory Commitment Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this l document.

REGULATORY COMMITMENT COMMITTED DATE OR i OUTAGE l

l i

l u

Docket No. 50-336 B17422 Attachment 2 Millstone Nuclear Power Station, Unit No. 2 LER 97-020-03 1

l.

August 1998 2 ..e.,m- 4