PNO-II-87-080, on 871209,plant Unit 2 Manually Shut Down from 33% Power to Repair Leak Believed to Be in 6 Inch Pipe to Elbow Weld.Plant Being Placed in Cold Shutdown for Repair. Licensee Anticipates 5 to 10 Day Outage

From kanterella
Jump to navigation Jump to search
PNO-II-87-080:on 871209,plant Unit 2 Manually Shut Down from 33% Power to Repair Leak Believed to Be in 6 Inch Pipe to Elbow Weld.Plant Being Placed in Cold Shutdown for Repair. Licensee Anticipates 5 to 10 Day Outage
ML20212E314
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/09/1987
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
References
PNO-II-87-080, PNO-II-87-80, NUDOCS 9711030142
Download: ML20212E314 (1)


- - _ _ _ - _ _ _ - - _ _ _ _ - - - - - _ - - _ - - - _ - _

I December 9, 1987 VMQ hw e~% PRELIMINARY NOTIFICATION OF EVE OR UNUSUAL OCCURRENCE PNO-II-87-8'O j y

(/ This preliminary notification constitutes EARLY notice of events of POSSIBLE sa','ety or public interest significance. The information is as initially received without verifi-cation or evaluation, and is basically P.11 that is known by the Region II staff on this date.

FACILITY: Alabama Power Company Licensee Emergtney Classification:

Farley Unit 2 Notification of Unusual Event Docket No. 50-364 Alert Dothan, Alabama Site Area Emergency General Emergency X Not Applicable

SUBJECT:

SHUTDOWN EXCEEDING 48 HOURS Farley Unit 2 was manually shut down from 33 percent power on December 9 at 10:57 a.m. EST to repair a leak believed to be in a 6-inch pipe to elbow weld. The unidentified leak rate was 0.7 gpm. The leak is non-isolatable in the safety injection line in the cold leg of "B" recirculation loop. The plant is being placed in cold shutdown for repair. A five- to ten-day outage is anticipated. Unit 2 was in power ascension following a refueling outage.

Unit I was shut down on December 7 for an 11-day maintenance outage.

Th State of Alabama has been informed.

The NRC received initial notification of this event by telephone from the licensee at 12:14 p.m. (EST) on December 9.

9 This information is current as of 3:00 p.m. (EST) on December 9.

Contact:

H. C. Dance - 242-5533 Distribution H. Street MNB3 Phillips EU Willste Regions Chairman Zech XE66 NRR hMSS Region I Comm. Roberts ARM 01 Region II Comm. Bernthal EDO Region III Comm. Carr PA Region IV Comm. Rogers OGC AirRights Region V SECY SLITP OGC-H CA FAX T0: Nicholson Lane MAIL TO:

GPA INPO ' RES DCS(Orginal)

ACRS. NSAC 00T (Trans. only)

""P5ft / LICENSEE RESIDENT IN5PECTOR HQS. OPERATIONS OFFICER c,ee ,man30d ~O 1 0 i g .) 2 7 9y,\f \ h Chm, Cmr

',' 3WDC/R Di:tribution:M GC, CA, Mas, Historian SECY, Records, l 9711030142 871209 i NO-I 7-000 PDR L

_ _ - _ _ _ _ _ _ _ _ _ - _ _