PNS-76-030:on 760701,bomb Threat Was Phoned Into Const Superintendent by Male,Saying Bomb Was Placed on Site to Go Off During Second Shift.Search Was Made.No Bomb Was Found & None Exploded
ML20236F410
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/02/1976
From: Gower G, Roy G, Thompson D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNS-76-030, PNS-76-30, NUDOCS 9807020150
Download: ML20236F410 (1)


Text

'3, f m) ') 0~ G Ypl PRELIMINARY NOTIFICATION

'~ff.lJ.1l '

EXEMPT FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.790(d)

=aram. .

~w.~.ma,=~ x~rmwmmem m nw-n .mamm.m.mmamura.mmewen

/

July 2, 1976 PRELIMINARY NOTIFICATION.0F SAFEGUARDS EVENT - FNS-76-30 This preliminary notification constitutes EARLY notice of events of POSSIBLE^

national security or public interest significance. The information presented is as initially received without verification or evaluation and is basically all that is known by IE staff as of this date.

Facility:

Alabama Power Company, Farley Nuclear Plant (CA 3L/h Sl)3h

Subject:

BOMB THREAT AT CONSTRUCTION SITE i

A bomb threat was phoned into the Construction Superintendent Thursday I (7-1-76) at 1:43 p.m. (CDT) by a male saying a bomb was placed on site to go off during the second shift.

Day shift personnel were evacuated and 2nd shift personnel were told of the threat. A search was made; no bomb was found and none exploded.

The FBI has been notified. Local police departments were not notified by W the licensee. A press release has not been made by the licensee or NRC.

Region II (Atlanta) received notification of this occurrence by telephone l

./ at 3:45 p. m. on July 1,1976, from the Quality Assurance Supervisor at the Farley construction site.

Additional Information The teamsters, iron workers, operating engineers and electrical craf t union contracts expired 6-30-76.

The electrical workers have agreed to work while their contract is being negotiated. The other 3 crafts are on strike. The plant is not being picketed. Contract negotiations are continuing.

Con _act: GCGower, IE x27261 GWRoy, IE x27261 DTnompson, IE x27541 Distribution: ,

Chairman Rowden Commissioner Mason S. J. Chilk, SECY Commissioner Gilinsky C. C. Kammerer, CA G. F. Murphy, JCAE Commissioner Kennedy /

/  !

I L. V. Gossick, EDO E. Volgenau, OIE J. A. Harris, PA l B. C. Rusche, NRR J. La Fleur, ISP T. J. McTiernan, AIA , t K. R. Chapman, NMSS H. K. Shapar, ELD D' Transmitted: P Bldg 4 * -- ; H St 9 a; MNBB9 -; Luge /}t/t$ ;

me -

EXEMPT FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.790(d) l , PRELTMTNARY NOTIFICATION l 9807020150 760702 j P,RcJb car a