ML20151V198
| ML20151V198 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 05/27/1977 |
| From: | Grier B, Henderson J, Reinmuth G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | |
| References | |
| PNO-77-093, PNO-77-93, NUDOCS 9809140150 | |
| Download: ML20151V198 (1) | |
Text
J f/M' yx?p; UNnWV2 V
urrY PRELIMINAR
_ _. - _.m. m..Y NOTIFICATION
.... m.. t.
PRELIMINARYNOTIFICATIONOFEVENTORUNUSUALOCCURRE This areliminary notification constitutes EARLY notice of an event of POSSI3LE safety or public interest significance.
The information presented is as initially received without verification or evaluation and is basically all that is known by IE staff on this date.
Facility:
Alabama Power Company Farley Nuclear Plant
Subject:
PICKETING 0F JOB SITE The job site is being whose contract has axr) picketed by Daniel Construction Co. painters ired. An offer was made and rejected and the picket line was established on May 23, 1977. All Daniel crafts are honoring the picket line. Daniel non-craft personnel and all APC0 personnel are continuing to work.
The picketing is orderly and contract negotiations are continuing.
APC0 does not expect Unit 1 core loading date to be affected.
'i Region II received notification of this occurrence by teleph:,ne call from the QA SJpervisor, APC0, at 2:20 pm, S/27/77.
Contact:
JHenderson, IE x28238 GReinmuth, IE x27461 BHGrier, IE x27356 wa
,1 Distribution: Transmitted H St '/* b"7 Chairman Rowden C.~ C. Kammerer, CA G. F. Murphy, JCAE
/
Commissioner Kennedy S. J. Chilk, SECY H. H. Whiteside, SCNR Comissioner Gilinsky H. R. M,*ers, HCEE h
Transmitted:
MNBBf/9 3 P Bldg '! i.W SS Bldg Y!.7 *2 h
L. V. Gossick, ED0 E. G. Case, NRR C. V. Smith, NMSS i
S. H. Hanauer, EDO J. A. Harris, PA W. G. Mcdonald, MIPC Luge (MAIL)
E. Volgenau, IE"'
R. G. Ryan, OSP T. J. McTiernan, 0IA Region Q t/ 0 3,
H. K. Shapar, ELD m.=. -.