MONTHYEARPNO-II-98-013, on 980308,util Declared NOUE Due to High River Level & Subsequent Flooding.Licensee Established Constant Communications W/Early,Ga & Houston County,Al.Resident Inspectors Are Monitoring Licensee Activities1998-03-0909 March 1998
[Table view]PNO-II-98-013:on 980308,util Declared NOUE Due to High River Level & Subsequent Flooding.Licensee Established Constant Communications W/Early,Ga & Houston County,Al.Resident Inspectors Are Monitoring Licensee Activities PNO-II-97-039A, on 970720,Hurricane Danny Downgraded to Depression.Storm Disipated Without Reaching Farley Nuclear Plant.Farley Nuclear Plant Experienced Light Rain W/Both Units Remaining at Full Power1997-07-21021 July 1997 PNO-II-97-039A:on 970720,Hurricane Danny Downgraded to Depression.Storm Disipated Without Reaching Farley Nuclear Plant.Farley Nuclear Plant Experienced Light Rain W/Both Units Remaining at Full Power PNO-II-97-039, on 970718,response Was Made to Hurricane Danny.Region II State Liason Officer Has Been in Contact W/Fema & State of Al.Plant Staff Taking Precautionary Measures in Preparation for High Wind Conditions1997-07-18018 July 1997 PNO-II-97-039:on 970718,response Was Made to Hurricane Danny.Region II State Liason Officer Has Been in Contact W/Fema & State of Al.Plant Staff Taking Precautionary Measures in Preparation for High Wind Conditions PNO-II-93-075, on 931221,Unit 2 Shutdown Due to Turbine Virbrations.Unit 2 Planned to Be Shutdown for Approx Six Days to Implement Repairs on Secondary Side1993-12-22022 December 1993 PNO-II-93-075:on 931221,Unit 2 Shutdown Due to Turbine Virbrations.Unit 2 Planned to Be Shutdown for Approx Six Days to Implement Repairs on Secondary Side PNO-II-93-004, on 930130,facility Began Reactor Shutdown to Replace Leaking Pressurizer Code Safety Valve 2B. Leak Reached Max Rate of 20-28 Gpm Prior to Shutdown.Facility in Cold Shutdown on 930131.State of AL Informed1993-02-0101 February 1993 PNO-II-93-004:on 930130,facility Began Reactor Shutdown to Replace Leaking Pressurizer Code Safety Valve 2B. Leak Reached Max Rate of 20-28 Gpm Prior to Shutdown.Facility in Cold Shutdown on 930131.State of AL Informed PNO-II-90-021, on 900419,during Review of Dothan Eagle Newspaper,Region II Became Aware of Lawsuit Filed Against Util on 900417.Complaint States That Summer Student Received Whole Body TLD Exposure of 40 Mrem in Sept 19851990-04-24024 April 1990 PNO-II-90-021:on 900419,during Review of Dothan Eagle Newspaper,Region II Became Aware of Lawsuit Filed Against Util on 900417.Complaint States That Summer Student Received Whole Body TLD Exposure of 40 Mrem in Sept 1985 PNO-II-89-078, on 891205,male Individual Called Dept of Corrections,State of Alabama & Requested to Talk to Dept Commissioner.Commissioner Not in & Individual Left Name, Phone Number & Message Threatening to Blow Up Farley NPP1989-12-0505 December 1989 PNO-II-89-078:on 891205,male Individual Called Dept of Corrections,State of Alabama & Requested to Talk to Dept Commissioner.Commissioner Not in & Individual Left Name, Phone Number & Message Threatening to Blow Up Farley NPP PNO-II-89-077, on 891115,high Winds from Storm Caused Damage to Electrical Switchyard.Section of 500 Kv Transmission Line Knocked Out & Electrical Equipment Damaged,Resulting in Spill of 3 Gallons of Pcb.Util Notified State of AL & EPA1989-11-17017 November 1989 PNO-II-89-077:on 891115,high Winds from Storm Caused Damage to Electrical Switchyard.Section of 500 Kv Transmission Line Knocked Out & Electrical Equipment Damaged,Resulting in Spill of 3 Gallons of Pcb.Util Notified State of AL & EPA PNO-II-89-068, on 890920,facility Manually Tripped from Approx 60% Power Due to Loss of Main Feedwater.Caused by Bumping of Valve on Main Feedwater Pump Turbine A.Resident Inspector Monitoring Licensee Actions1989-09-22022 September 1989 PNO-II-89-068:on 890920,facility Manually Tripped from Approx 60% Power Due to Loss of Main Feedwater.Caused by Bumping of Valve on Main Feedwater Pump Turbine A.Resident Inspector Monitoring Licensee Actions PNO-II-89-030, on 890405,diver from Nuclear Util Const Co Caused Alarm of Portal Monitor When Entering Site.Caused by Clothing Being Contaminated from Working at Plant in Spain. Individual Showed No Internal Activity1989-04-0707 April 1989 PNO-II-89-030:on 890405,diver from Nuclear Util Const Co Caused Alarm of Portal Monitor When Entering Site.Caused by Clothing Being Contaminated from Working at Plant in Spain. Individual Showed No Internal Activity PNO-II-87-080A, on 871209,plant Shut Down to Correct 0.7 Gpm Unidentified Leak.Elbow & Defective Weld Will Be Replaced & Sent to Westinghouse for Failure Analysis.Specialists Onsite Performing Reviews & Exams1987-12-14014 December 1987 PNO-II-87-080A:on 871209,plant Shut Down to Correct 0.7 Gpm Unidentified Leak.Elbow & Defective Weld Will Be Replaced & Sent to Westinghouse for Failure Analysis.Specialists Onsite Performing Reviews & Exams PNO-II-87-080, on 871209,plant Unit 2 Manually Shut Down from 33% Power to Repair Leak Believed to Be in 6 Inch Pipe to Elbow Weld.Plant Being Placed in Cold Shutdown for Repair. Licensee Anticipates 5 to 10 Day Outage1987-12-0909 December 1987 PNO-II-87-080:on 871209,plant Unit 2 Manually Shut Down from 33% Power to Repair Leak Believed to Be in 6 Inch Pipe to Elbow Weld.Plant Being Placed in Cold Shutdown for Repair. Licensee Anticipates 5 to 10 Day Outage PNO-II-87-073, on 871019,licensee Identified Thermal Sleeve Butt Weld Nozzle Loose Inside of Reactor Vessel.Problem Being Evaluated by Licensee & Westinghouse.Licensee Will Remove Internals & Retrieve Thermal Sleeve1987-10-22022 October 1987 PNO-II-87-073:on 871019,licensee Identified Thermal Sleeve Butt Weld Nozzle Loose Inside of Reactor Vessel.Problem Being Evaluated by Licensee & Westinghouse.Licensee Will Remove Internals & Retrieve Thermal Sleeve PNO-II-86-085A, util Determined That 97 Potentially Contaminated Snubbers Shipped to Pacific Scientific,Inc as Nonradioactive Matl.Surveys of 6 of 87 Snubbers Detected Radiation Levels of 2.2 M/H.Ten Snubbers Not Located1986-11-12012 November 1986 PNO-II-86-085A:util Determined That 97 Potentially Contaminated Snubbers Shipped to Pacific Scientific,Inc as Nonradioactive Matl.Surveys of 6 of 87 Snubbers Detected Radiation Levels of 2.2 M/H.Ten Snubbers Not Located PNO-II-85-086A, on 850830,Hurricane Elena Located Near Latitude 28.0 North & Longitude 87.5 West,Approx 160 Miles South of Pensacola,Fl.Utils Aware of Location & Prepared to Implement Appropriate Procedures1985-08-30030 August 1985 PNO-II-85-086A:on 850830,Hurricane Elena Located Near Latitude 28.0 North & Longitude 87.5 West,Approx 160 Miles South of Pensacola,Fl.Utils Aware of Location & Prepared to Implement Appropriate Procedures PNO-II-85-086, on 850826,Natl Weather Svc Upgraded Tropical Storm Elena to Hurricane.Utils Contacted Re Implementation of Hurricane Procedures1985-08-29029 August 1985 PNO-II-85-086:on 850826,Natl Weather Svc Upgraded Tropical Storm Elena to Hurricane.Utils Contacted Re Implementation of Hurricane Procedures PNO-II-82-014, on 820130,reactor Coolant Pump Seal Found Leaking Excessively.Cause Not Stated.Backup Seal Placed in Svc.Maint Outage Advanced to Coincide W/Repairs1982-02-0101 February 1982 PNO-II-82-014:on 820130,reactor Coolant Pump Seal Found Leaking Excessively.Cause Not Stated.Backup Seal Placed in Svc.Maint Outage Advanced to Coincide W/Repairs PNO-II-82-001, util & Bechtel Continuing Evaluation of Cause & Possible Consequences of Mispositioned Containment Spray Nozzles Identified During 5-yr Surveillance Test.Corrective Actions Not Expected to Delay 820301 Restart1982-01-0606 January 1982 PNO-II-82-001:util & Bechtel Continuing Evaluation of Cause & Possible Consequences of Mispositioned Containment Spray Nozzles Identified During 5-yr Surveillance Test.Corrective Actions Not Expected to Delay 820301 Restart PNO-II-81-080, six to Eight Employees Suspended Pending Completion of Investigation to Determine Whether Drugs Were in Use at Plant1981-09-23023 September 1981 PNO-II-81-080:six to Eight Employees Suspended Pending Completion of Investigation to Determine Whether Drugs Were in Use at Plant PNO-II-81-046, on 810622,primary to Secondary Leak Identified in Steam Generator 2B.Caused by Mechanical Tube Damaged During Installation of Insp Access1981-06-23023 June 1981 PNO-II-81-046:on 810622,primary to Secondary Leak Identified in Steam Generator 2B.Caused by Mechanical Tube Damaged During Installation of Insp Access PNO-II-81-034, on 810508,facility Achieved Initial Criticality.Actual Parameters Were in Close Agreement W/Predicted Conditions.Low Power Physics Tests Being Conducted1981-05-0808 May 1981 PNO-II-81-034:on 810508,facility Achieved Initial Criticality.Actual Parameters Were in Close Agreement W/Predicted Conditions.Low Power Physics Tests Being Conducted PNO-II-80-132, on 800729,oil Leak Developed on Turbine Governor Valve.While Ramping Power Down,Main Feedwater Pump Tripped & Reactor Tripped on Low Steam Generator Level. ECCS Did Not Actuate & Plant Sys Functioned as Designed1980-07-30030 July 1980 PNO-II-80-132:on 800729,oil Leak Developed on Turbine Governor Valve.While Ramping Power Down,Main Feedwater Pump Tripped & Reactor Tripped on Low Steam Generator Level. ECCS Did Not Actuate & Plant Sys Functioned as Designed PNO-II-80-108, on 800614,plant Was Shut Down Due to Steam Generator Tube Leakage.Unit Presently in Cold Shutdown Condition1980-06-16016 June 1980 PNO-II-80-108:on 800614,plant Was Shut Down Due to Steam Generator Tube Leakage.Unit Presently in Cold Shutdown Condition PNO-II-80-012, on 800121,while Quarterly Inservice Insp Valve Cycling Tests Being Performed,Unidentified RCS Sys Leakage Increased Suddenly from 0.2 Gpm to 3.04 Gpm.Probably Caused by Blown First Set of Valve Packing1980-01-21021 January 1980 PNO-II-80-012:on 800121,while Quarterly Inservice Insp Valve Cycling Tests Being Performed,Unidentified RCS Sys Leakage Increased Suddenly from 0.2 Gpm to 3.04 Gpm.Probably Caused by Blown First Set of Valve Packing ML19322B8781979-11-0808 November 1979 PNO-II-79-29:on 791108,variations in Leakoff Rate Noted from Seal 2 on Pump B.Facility Shut Down to Repair Pump Seals on Reactor Coolant Pump.Licensee Plans News Release ML19322A7801979-11-0505 November 1979 PNO-II-79-22:on 791106 & 07,State of AL Will Conduct Concurrence Exercise to Test State Radiological Emergency Response Plan PNO-II-79-020, on 791031,Unit 1 Achieved Criticality Following Refueling Outage Which Began on 790308.Zero Power Physics Testing Planned1979-10-31031 October 1979 PNO-II-79-020:on 791031,Unit 1 Achieved Criticality Following Refueling Outage Which Began on 790308.Zero Power Physics Testing Planned PNO-II-79-005, on 791008,120 Cubic Ft of Gas Containing 17 Mci of Kr-85 Leaked from Waste Gas Sys Valve Into Auxiliary Bldg.Gas Released Into Environ Via Auxiliary Bldg Ventilation Sys.Caused by Maint Work on Valve1979-10-0909 October 1979 PNO-II-79-005:on 791008,120 Cubic Ft of Gas Containing 17 Mci of Kr-85 Leaked from Waste Gas Sys Valve Into Auxiliary Bldg.Gas Released Into Environ Via Auxiliary Bldg Ventilation Sys.Caused by Maint Work on Valve ML19256C6521979-09-12012 September 1979 PNO-79-415A:Region 2 Is Continuing Watch for Hurricane Frederic.Farley Facility Is Approx 175 Miles East of Projected Landfall Point.Utils Have Been Contacted Re Procedures ML19256C6541979-09-11011 September 1979 PNO-79-415:on 790911 Region 2 Initiated Watch for Hurricane Frederic.Communication W/Utils Established.Emergency Power Supplies Are Operable ML19256C7021979-08-31031 August 1979 PNO-79-387:Region 3 Hurricane Watch Initiated on 790831. Licensees Report That Emergency Power Sources Are Operable. Monitor of Licensee Emergency Backup Power Status, Operational Status & Hurricane Alert Procedures Underway ML19256C8841979-07-23023 July 1979 PNO-79-273:task Force Formed by Util Released 220 Page Rept of Recommendations Designed to Improve Safety of Plants.Rept Covered Plant Design,Operating Procedures,Personnel Training,Administrative Controls & Emergency Planning ML19256C6031979-05-15015 May 1979 PNO-79-112:on 790514,three of Five Sinks in Equipment Decontamination Room Drained to Unit 2 Floor Drain Tank Instead of Unit 1 Chemical Drain Tank.Led to Discharge to Two Onsite Ponds.Caused by Design Noncompliance ML19256C7961979-04-0606 April 1979 PNO-79-76:on 790406,pipe Engineer Working in Containment Fell from 155-foot to 117-foot Level & Was Contaminated Above Background Level.Extent of Injuries Is Unknown. Unit Has Been in Cold Shutdown for Refueling for 30 Days ML19256C8081979-03-0909 March 1979 PNO-79-47:on 790309,operations & Maint Personnel Went on Wildcat Strike.Strike Contingency Plan Is Being Implemented. on 790308 Reactor Was Shut Down for Refueling Outage. Supervisors Are Able to Meet Tech Spec Manning Requirements ML20217A6491978-12-29029 December 1978 PNO-78-215:on 790102,util Will Commence Reduction in Force of 1160 Personnel at Plant Site.Util Anticipates That Const Shutdown & Layoff Activities Will Take from 4-6 Days ML20217A1151978-08-17017 August 1978 PNO-78-144:on 780817,union Representing 40% of Util Employees Voted 63% to Reject Offered Contract.Strike Plan Prepared & Reviewed by Region II ML20151X9161977-10-21021 October 1977 PNO-77-188:on 771020,unit Was Shut Down,Due to Turbine Bearing Vibration Indications on Main Westinghouse Turbine. Preliminary Exam Indicated That One or More Turbine Shrouds Were Thrown from Row 2 of Low Pressure Turbine ML20126D1901977-08-12012 August 1977 PNO-77-143:Pacific Pump Co Supplied Facilities W/Production Lot of 40 Pumps Mfg Using Shafts Made of Inferior Matl. Cause Unstated.All Utils W/Pumps Were Notified.Nrc Headquarters Notified on 770812 ML20151X4721977-08-10010 August 1977 PNO-77-141:on 770809,Unit 1 of Farley Nuclear Plant Achieved Initial Criticality.Control Rod Configuration & Reactor Coolant Boron Concentration Substantially as Predicted ML20151V1981977-05-27027 May 1977 PNO-77-093:on 770523,job Site Being Picketed by Daniel Const Co Painters Whose Contract Has Expired.Offer Was Made & Rejected.Picket Line Was Established on 770523.Picketing Orderly & Contract Negotiations Continuing ML20151U6331977-04-20020 April 1977 PNO-77-061:on 770419,cracking of 18-inch Thick Concrete at Containment Floor Level Was Observed in SGs B & C Cubicles. Cause Believed to Be Air Leakage & Air Buildup Under Containment Floor Metal Liner.Press Release Planned ML20236J7541976-07-27027 July 1976 PNS-76-035:on 760726,Daniel Construction Co Manager of Services at Farley Received Call on Office Phone from Unidentified Male,Claiming There Would Be a Lot of Trouble Today at Farley Plant.Fbi Notified ML20249B5651976-07-20020 July 1976 PNO-76-123:Farley Construction Site Being Picketed by Sheet Metal Workers Whose Contract Expired 760715.All Other Crafts Honoring Picket Line.Licensee Reports That Little Progress Being Made Re Union Contract Negotiations ML20249B4961976-07-0909 July 1976 PNO-76-113:on 760709,Delcon Superintendent Was Shot Twice in Side.Individual Was Taken to Hosp.Sheriff Was Notified.Cause of Shooting Not Known ML20236F4101976-07-0202 July 1976 PNS-76-030:on 760701,bomb Threat Was Phoned Into Const Superintendent by Male,Saying Bomb Was Placed on Site to Go Off During Second Shift.Search Was Made.No Bomb Was Found & None Exploded 1998-03-09 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARIR 05000348/19990051999-09-0202 September 1999
[Table view]Insp Repts 50-348/99-05 & 50-364/99-05 on 990627-0807.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000348/19990041999-07-26026 July 1999 Insp Repts 50-348/99-04 & 50-364/99-04 on 990516-0626.One Noncited Violation Identified.Major Areas Inspected: Operations,Maint,Engineering & Plant Support ML20210H1591999-07-23023 July 1999 Notice of Violation from Insp on 990308-10.Violation Noted: from Time of Receipt of Alarm Until Arrival at Three Different Vital Areas,Response Objective & Physical Security Plan Were Not Met IR 05000348/19990031999-06-10010 June 1999 Insp Repts 50-348/99-03 & 50-364/99-03 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000348/19990021999-04-29029 April 1999 Insp Repts 50-348/99-02 & 50-364/99-02 on 990221-0403.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000348/19990091999-04-0606 April 1999 Partially Withheld Insp Repts 50-348/99-09 & 50-364/99-09 on 990308-10 (Ref 10CFR73.21).Non-cited Violation Identified. Major Areas Inspected:Area of Plant Support Re Physical Security Program for Power Reactors IR 05000348/19990011999-03-19019 March 1999 Insp Repts 50-348/99-01 & 50-364/99-01 on 990110-0220. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000348/19980081999-02-0202 February 1999 Insp Repts 50-348/98-08 & 50-364/98-08 on 981129-990109.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000348/19980141999-01-0808 January 1999 Partially Withheld Insp Repts 50-348/98-14 & 50-364/98-14 on 981207-10 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Procedures & Representative Records,Interviews with Personnel & Observations of Activities in Progress IR 05000348/19980071998-12-28028 December 1998 Insp Repts 50-348/98-07 & 50-364/98-07 on 981018-1128.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000348/19980061998-11-10010 November 1998 Insp Repts 50-348/98-06 & 50-364/98-06 on 980830-1017.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000348/19980101998-11-0303 November 1998 Insp Repts 50-348/98-10 & 50-364/98-10 on 980908-11.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise & Response in Control Room Simulator & Technical Support Ctr IR 05000348/19980051998-09-28028 September 1998 Insp Repts 50-348/98-05 & 50-364/98-05 on 980712-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000348/19980041998-08-10010 August 1998 Insp Repts 50-348/98-04 & 50-364/98-04 on 980601-0711.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20236J7021998-07-0101 July 1998 Insp Repts 50-348/98-03 & 50-364/98-03 on 980412-0530.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20236J6971998-07-0101 July 1998 Notice of Violation from Insp on 980412-0530.Violation Noted:Several Conditions Adverse to Quality Associated W/Cr Ventilation Sys Were Not Promptly Corrected.Conditions Inappropriately Closed Out Before Adequate C/As Completed IR 05000348/19980991998-06-29029 June 1998 SALP Repts 50-348/98-99 & 50-364/98-99 Covering Period 961124-980530 IR 05000348/19980021998-05-0808 May 1998 Insp Repts 50-348/98-02 & 50-364/98-02 on 980221-0411.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20217E5921998-03-23023 March 1998 Notice of Violation from Insp on 980111-0212.Violation Noted:While Performing Maint on 1A Centrifugal Charging Pump,Maint Personnel Violated Requirements of FNP-0-M-001, Rev 13 PNO-II-98-013, on 980308,util Declared NOUE Due to High River Level & Subsequent Flooding.Licensee Established Constant Communications W/Early,Ga & Houston County,Al.Resident Inspectors Are Monitoring Licensee Activities1998-03-0909 March 1998 PNO-II-98-013:on 980308,util Declared NOUE Due to High River Level & Subsequent Flooding.Licensee Established Constant Communications W/Early,Ga & Houston County,Al.Resident Inspectors Are Monitoring Licensee Activities IR 05000348/19970151998-02-0909 February 1998 Insp Repts 50-348/97-15 & 50-364/97-15 on 971130-980110. No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 07100019/20110291997-12-29029 December 1997 Notice of Violation from Insp on 971019-1129.Violation Noted:As Early as June 1985,licensee Identified Degradation of Cork Seal Between Containment & Auxiliary Bldg Walls, Condition Adverse to Quality IR 05000348/19970141997-12-29029 December 1997 Insp Repts 50-348/97-14 & 50-364/97-14 on 971019-1129. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000348/19970131997-11-20020 November 1997 Partially Withheld Insp Repts 50-348/97-13 & 50-364/97-13 on 971021-24 (Ref 10CFR73.21).Major Areas Inspected:Physical Security Program for Power Reactors IR 05000348/19970111997-11-17017 November 1997 Insp Repts 50-348/97-11 & 50-364/97-11 on 970907-1018. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20199H1281997-11-17017 November 1997 Notice of Violation from Insp on 970907-1018.Violations Noted:Battery Capacity After Svc Test Was Inadequate & Check Valve V003 & V002D F & H Were Not Flow Tested in Manner That Proves That Disk Travels to Seat on Cessation IR 05000348/19970071997-10-10010 October 1997 Insp Repts 50-348/97-07 & 50-364/97-07 on 970825-29.No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program,Including Problem Identification & Resolution ML20211Q9391997-10-0606 October 1997 Notice of Violation from Insp on 970803-0906.Violation Noted:As of 970906 Licensee Installed One 1-inch Thick Wrap of Kaowool on Sides & Bottoms of Raceways BDE-9 & BDE-15, Carrying Train B Charging Pump Power Cable in Fire Area ML20211K8161997-09-26026 September 1997 Notice of Violation from Insp on 970818-22.Violation Noted: Noted:Nrc Identified That Licensee Failed to Correctly Translate Applicable Design Specfication Input Requirements for Kaowool Electrical Raceway Fire Barrier Sys at Plant ML20217R2021997-08-28028 August 1997 Notice of Violation from Insp on 970622-0802.Violation Noted:On 970616,most of M&TE Used Onsite Did Not Have Written & Approved Calibration Procedures IR 05000348/19970081997-08-28028 August 1997 Insp Repts 50-348/97-08 & 50-364/97-08 on 970622-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support PNO-II-97-039A, on 970720,Hurricane Danny Downgraded to Depression.Storm Disipated Without Reaching Farley Nuclear Plant.Farley Nuclear Plant Experienced Light Rain W/Both Units Remaining at Full Power1997-07-21021 July 1997 PNO-II-97-039A:on 970720,Hurricane Danny Downgraded to Depression.Storm Disipated Without Reaching Farley Nuclear Plant.Farley Nuclear Plant Experienced Light Rain W/Both Units Remaining at Full Power IR 05000348/19970061997-07-18018 July 1997 Insp Repts 50-348/97-06 & 50-364/97-06 on 970511-0621.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-97-039, on 970718,response Was Made to Hurricane Danny.Region II State Liason Officer Has Been in Contact W/Fema & State of Al.Plant Staff Taking Precautionary Measures in Preparation for High Wind Conditions1997-07-18018 July 1997 PNO-II-97-039:on 970718,response Was Made to Hurricane Danny.Region II State Liason Officer Has Been in Contact W/Fema & State of Al.Plant Staff Taking Precautionary Measures in Preparation for High Wind Conditions ML20148K6431997-06-0909 June 1997 Notice of Violation from Insp on 970330-0510.Violation Noted:On 970321,facility Licensee Physician Determined That Licensed Operator Eyesight No Longer Met Min Stds Required by 10CFR55.33(a)(1) as Measured by Std of ANSI/ANS-3.4-1983 ML20148K6511997-06-0909 June 1997 Insp Repts 50-348/97-05 & 50-364/97-05 on 970330-0510. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000348/19972011997-05-13013 May 1997 Insp Repts 50-348/97-201 & 50-364/97-201 on 970127-0314.No Violations Noted.Major Areas Inspected:Engineering, Auxiliary Feedwater Sys,Component Cooling Water Sys & Sys Interface Design Review ML20196G4241997-05-0606 May 1997 Notice of Violation from Insp Completed on 970314.Violation Noted:Prior to 970314,licensee Failed to Prescribe Documented Instructions or Procedures to Implement Listed Activities Affecting Quality of Operation of PRF Sys ML20138J6661997-04-28028 April 1997 Insp Repts 50-348/97-03 & 50-364/97-03 on 970216-0329. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support,Including Health Physics IR 05000348/19973001997-04-22022 April 1997 Exam Repts 50-348/97-300 & 50-364/97-300 on 970324-27.Exam Results:Two of 5 Applicants Passed Exam.One Was Grades as Marginal Pass ML20137U6021997-04-0202 April 1997 Insp Repts 50-348/97-04 & 50-364/97-04 on 970125-0314. Violations Noted.Major Areas Inspected:Detailed Esfs Review & Walkdown of Units 1 & 2 PRF Sys,Including Associated Surveillance Test & Sys Design Requirements ML20140B7851997-03-17017 March 1997 Notice of Violation from Insp on 970105-0215.Violation Noted:Test Engineer Failed to Comply W/Procedural Requirements of FNP-1-STP-124.0 During Performance Testing of Plant Penetration Room Filtration Sys Train a ML20140B7921997-03-17017 March 1997 Insp Repts 50-348/97-01 & 50-364/97-01 on 970104-0215. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000348/19960151997-02-0303 February 1997 Insp Repts 50-348/96-15 & 50-364/96-15 on 961124-970104.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134G3961997-01-24024 January 1997 Insp Repts 50-348/96-14 & 50-364/96-14 on 961209-13.No Violations Noted.Major Areas Inspected:Biennial Emergency Preparedness Exercise ML20133G8371997-01-0909 January 1997 SALP Repts 50-348/96-99 & 50-364/96-99 for Period 950326- 961123 ML20133F6891996-12-23023 December 1996 Notice of Violation from Insp on 961013-1123.Violation Noted:On 961010,security Guards Failed to Search Westinghouse Sludge Lance Trailer Prior to Allowing Trailer to Enter Plant Protected Area ML20133F6921996-12-23023 December 1996 Insp Repts 50-348/96-13 & 50-364/96-13 on 961013-1123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20149M5771996-12-0404 December 1996 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Noncompliance Noted:Licensee Failed to Assure Electrical Cables Associated W/Sys Necessary to Achieve & Maintain Hot SD Conditions Encl in Fire Barrier ML20134J4201996-11-0808 November 1996 Notice of Violation from Insp on 960901-1012.Violation noted:non-licensed Sys Operators in Two Separate Events Failed to Properly Implement Applicable Sys Operating Procedures 1999-09-02 |
Text
PDg O d sicL G C-%
D h!
l
- w PRELIMINARY NOTIFICATION i(
l August 17, 1978 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE -- PNO i This preliminary notification constitutes EARLY notice of an event of POSSIBLE safety or public interest significance.
The information presented is as initially received without verification or evaluation and is basically all that is known by IE staff as of this date.
FACILITY: Alabama Power Company Farley Unit No.1 i
l Occket No. 50-348 Houston County, Alabama
SUBJECT:
POTENTIAL STRIKE The union representing 40 percent of Alabama Power Company employees voted 63 percent to reject an offered contract.
A strike vote is to be taken Friday evening August 18.
The licensee has prepared a strike plan which has been reviewed by Region II, Atlanta.
The licensee is uncertain as to the outcome of the strike vote, but is prepared to implement the plan.
The plant security force is not represented by the union and
!!l'S '
according to the licensee would not honor a picket line.
There has been no media interest.
A news release is not planned by the
,(
licensee nor the NRC.
The State of Alabama has been notified.
l Region II (Atlanta) received notification of this occurrence by telephone from the Plant Manager at 10:00 a.m. on August 17.
Contact:
GRKlingler, IE x28019 FNolan, IE x28019 JSniezek, IE x28019 Distribution:
Transmitted H St 2-.'s N Chairman Hendrie Commissioner Bradford S. J...Sil k, SECY Commissioner Kennedy Commissioner Ahearne C. C. Kammerer, CA Commissioner Gilinsky (ForDistribution)
Transmitted:
MNBB A;. @ P Bldg L', f 3 J.G.D[avisL'f[o IE L. V. Gossick, EDO H. R. Denton, NRR Region S. H. Hanauer, EDO J. J. Fouchard, PA SS Bldg 2.' O -
(MAIL)
N. M. Haller, MPA C. V. Smith, NMSS