ML20151X472
| ML20151X472 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 08/10/1977 |
| From: | Blackwood E, Sniezek J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | |
| References | |
| PNO-77-141, NUDOCS 9809170106 | |
| Download: ML20151X472 (1) | |
Text
-.
~~---
PREL1HINARY NOTIFICATION ODS G<h d' N1
- i. 10,JXy.:
o i
August 10, 1977 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-77 141 i
This preliminary notification constitutes EARLY notice of an hvent of POSSIBLE safety or public interest significance. The inforination presented is_as initially received without verification or evaluation and is basically all that is known by IE staff on this date.
Facility: Alabama Power Company J
Farley, Unit No.1 (Docket No. 50-348)
Dothan, Alabama
Subject:
Initial Criticality No.1 of th$ Fhrley Nuclear Plant achieved initial criticality at 1:35 p.m. !
O Unit
-(EDT) on August 9, 1977. The control rod configuration and reactor coolant boron concentration were substantially as predicted.
The licensee plans to issue a news release. The State of Alabama has been infonned by Region II of the initial criticality.
Region II does l
not plan to issue a news release.
Media interest is not expected.
Region II (Atlanta) received notification of this event by telephone i
from the IE inspector at the Farley site at 2:15 p.m. on August 9 j
1977.
Contact:
EBlackwood, IE x28019,JSniezek IE x28019 e
Distribution:
Transmitted H St /oldf; Commissioner Kennedy S. J. C.'lill:, SECY C. C. Kammerer, CA Commissioner Gilinsky (ForDistribution)
Transmitted: MNBB fdf/d P Bldg 10t/ V E. Volge IE L. V. Gossick, EDO~
E. G. Case, NRR Regio
/dik0 S. H Hanauer, EDO 8: If J. J. Fouchard, PA SS Bldg (ith, NMSS (MAIL)
W. G. Mcdonald, MIPC C. V. Sm R. J. McTiernan, 01A R. G. Ryan, OSP R. Minogue, SD H. K. Shapar, ELD PRELIMINARY NOTIFICATION 4
/-
p f o" 9909170106 770810 PDR KLE PNO-77-141 PDR g w
a.w* <,
v"--