NRC-84-0019, Forwards Detailed Control Room Design Review Summary Rept, in Response to NUREG-0737,Suppl 1

From kanterella
Jump to navigation Jump to search
Forwards Detailed Control Room Design Review Summary Rept, in Response to NUREG-0737,Suppl 1
ML20086L018
Person / Time
Site: Wolf Creek, Callaway, 05000000
Issue date: 02/02/1984
From: Petrick N
STANDARDIZED NUCLEAR UNIT POWER PLANT SYSTEM
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20086L019 List:
References
RTR-NUREG-0737, RTR-NUREG-737 SLNRC-84-0019, SLNRC-84-19, NUDOCS 8402070114
Download: ML20086L018 (1)


Text

r-p.. v.

SNUPPS Standardised Nuclear Unit Pouver Plant System 5 choke cherry need Nicholas A. Petrick

" ' * * % '*"d N Executive Director (300 ses.colo February 2, 1984 SLNRC 84-0019 FILE: 0671.1 SUBJ: DCRDR Sumary Report for SNUPPS Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Docket Nos. STN 50-482 and STN 50-483

Dear Mr. Denton:

In response to NUREG-0737, Supplement 1, transmitted herewith is the Detailed Control Room Design Review (DCRDR) Summary Report for the SNUPPS plants (Callaway and Wolf Creek). This report reflects our longstanding commitment to review and upgrade the SNUPP5 control rooms to accepted human factors standards and methods. It may be desirable for the NRC to utilize the Summary Report during the NRC site audits of the Callaway and Wolf Creek control room design reviews, scheduled for the week of February 27, 1984.

Very truly yours,

[  %(Mw R Nicholas A. Petrick DJK/dck/9b8 Attachment cc: D. F. Schnell UE G. L. Koester KGE D. T. McPhee KCPL W. S. Schum USNRC/WC J. H. Neisler USNRC/ CAL W. Middleton NRC 900

')

8402070114 840202 hDRADOCK 05000482 PDR

F .

" 7 i

)

g a

h

_ _ - _ _ _ _ _ _ _ - _ _ __ _ _