Discusses Audit on Restart & long-range Scope List (Rsl/Lrsl) Completed on 871112.Concludes That Rsl/Lrsl Process Effective in Transferring Items from Original Data Bases to New Lists
ML20236V451
Person / Time
Site: Rancho Seco
Issue date: 11/13/1987
From: Andognini G
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
GCA-87-778, NUDOCS 8712040314
Download: ML20236V451 (2)


Text

- -

4 A [ : ' *"; ,

(,m3SMUD "

'b SACRAMENTO MUNICIPAL UTILITY DISTRICT O P. O. Box 15830, Sacramento CA 95852-1830,(916) 452-3211 AN ELECTRIC SYSTEM SEJ,TylNG E HEART OF CALIFORNIA

~'

o l}l l@ (,y fiS';

NOV 131987 '7 GCA 87-778 U.S. Nuclear Regulatory Commission Attn: J. B. Martin, Regional Administrator Region V offica of Inspection Enforcement 1450 Maria Lane, Suite 210 Walnut Creek, Ca 94596 DOCKET NO. 50-312 RANCHO SECO NUCLEAR GENERATING STATION LICENSE NO. DPR-54 CERTIFICATION OF THE RESTART SCOPE LIST (RSL) AND LONG RANGE SCOPE LIST (LRSL)

Dear Mr. Martin:

An audit was on the RSL/LRSL process was completed by the District's Nuclear Quality Department on November 12, 1987. The following conclusions were made concerning the RSL/LRSL.

1. All valid items identified by number in the Quality Tracking System (QTS) were found within the LRSL and/or RSL.
2. It is noted that some QTS Priority 1 items were re-evaluated to be Priority 2R within the RSL. Since Priority 2R on the RSL is still " restart required", it is considered that those Praority 1 QTS items were satisfactorily captured.

Adriitionally, some QTS restart /non-restart priorities were changed by resubmittal to the Performance Analysis Group.

Guch changes were appropriately approved and documented.

3. Also within the scope of this audit, a Mil Standard sampling process was used to verify the intent of the original data bases (the QTS, System Status Reports and System l Investigation Reports, and the Action Plan Amendment III j list) had been transferred to the RSL/LRSL items. '

The conclusion we have drawn from the results of the audit is that the RSL/LRSL process was effective in transferring the items from the original data bases to the new lists. Therefore, to the best of my belief and knowledge the RSL/LRSL data base accurately reflects the District's restart commitments.

I m2Ogg;gmfg2 g P \

MeI RANCHO SECO NUCLEAR GENERATING STATION O 14440 Twin Cities Road, Herald CA 95638-9799,(209) 333 2935 L -____________-__.___-.______________a

e v J.B. Martin- 8 IS07 GCA 87-778 1

1 It is ' also appropriate.' to point out that the RSL/LRSL are living documents that will be changed as new items are identified or '

closed. This will be accomplished per our procedures for accomplishing these tables which your staff has reviewed.

Please contact me if you have any questions. Members of your staff with questions requiring additional information or clarification may contact Steve Crunk of the Licensing Department atL(916) 452-3211, extension 4913.

Sincerely,

'h :rY >

G Carl And nini

. Chief Executive Officer, Nuclear Sworn to and subscribed before me this / day of Alovemhec .