Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P2061999-10-26026 October 1999 Forwards for First Energy Nuclear Operating Co Insp Rept 50-346/99-17 on 990928-1001.Insp Was Exam of Activities Conducted Under License Re Implementation of Physical Security Program.No Violations Identified ML20217N3851999-10-20020 October 1999 Forwards RAI Re Licensee 990521 Request for License Amend to Allow Irradiated Fuel to Be Stored in Cask Pit at Davis-Besse,Unit 1.Response Requested within 60 Days from Receipt of Ltr ML20217N2321999-10-15015 October 1999 Requests NRC Approval to Use Alternative to Requirements of 10CFR50.55a(f)(4)(ii).Licensee Requests Extension to Specified Schedule for Implementing Updates to IST Program ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes PY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl1999-10-14014 October 1999 Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl ML20217F8371999-10-0808 October 1999 Forwards Insp Rept 50-346/99-10 on 990802-0913.One Violation Occurred Being Treated as NCV ML20217A5641999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Davis-Besse on 990901.Informs That NRC Plans to Conduct Addl Insps to Address Questions Raised by Issues Re Operator Errors & Failure to Commit to JOG Topical Rept on MOV Verification ML20212L0691999-09-30030 September 1999 Forwards,For Review & Comment,Copy of Preliminary ASP Analysis of Operational Condition Discovered at Unit 1 on 981014,as Reported in LER 346/98-011 ML20216J6701999-09-24024 September 1999 Forwards Post Examination Documentation for Written Operator Initial License Examination Administered at Davis-Besse Nuclear Power Station on 990920.Without Encls ML20212D3501999-09-21021 September 1999 Forward Copy of Final Accident Sequence Precursor Analysis of Operational Event at Plant,Unit 1 on 980624,reported in LER 346/98-006 05000346/LER-1998-001, Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached1999-09-0909 September 1999 Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached ML20216E5961999-09-0707 September 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1,safety Features Actuation Sys Instrumentation & Associated Bases 3/4.3.1 & 3/4.3.2,reactor Protection Sys & Safety Sys Instrumentation ML20211P3001999-09-0707 September 1999 Forwards FEMA Transmitting FEMA Evaluation Rept for 990504 Emergency Preparedness Exercise at Davis-Besse Nuclear Power Plant.No Deficiencies Identified.One Area Requiring C/A & Two Planning Issues Identified ML20211K6681999-08-30030 August 1999 Forwards Copies of Certified Personal Qualification Statement - Licensee (NRC Form 398) for Operator Candidates Listed Below.Without Encls ML20211K6611999-08-30030 August 1999 Forwards Copies of Operator License Renewal Applications for Individuals Listed.Operators Have Successfully Completed Appropriate Operator Requalification Training Program at Dbnps.Without Encls ML20211K0951999-08-30030 August 1999 Forwards Request for Addl Info Re Fire & Seismic Analyses of IPEEE for Davis-Besse Nuclear Power Station,Unit 1. Response Requested within 60 Days ML20211H0201999-08-25025 August 1999 Forwards semi-annual FFD Rept for 990101-0630 for DBNPS, Unit 1,IAW 10CFR26.71(d) ML20211D1171999-08-20020 August 1999 Forwards Insp Rept 50-346/99-09 on 990623-0802.Violations Identified & Being Treated as Noncited Violations ML20211G3911999-08-20020 August 1999 Forwards Update to Estimated Info for Licensing Action Requests Through 010930,re Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl1999-08-19019 August 1999 Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl ML20211J9201999-08-13013 August 1999 Urges NRC to Find Funds for Stockpiling Radiation Pills for Residents Living Near Plant ML20211B0161999-08-13013 August 1999 Forwards SE Accepting Evaluation of Second 10-year Interval Inservice Insp Program Request for Relief Numbers RR-A16, RR-A17 & RR-B9 for Plant,Unit 1 ML20210T1061999-08-12012 August 1999 Forwards Preliminary NRC Forms 398 & 396 for Listed Candidates,Per Operator License Exam Scheduled for Week of 990913.Encl Withheld ML20210S6071999-08-11011 August 1999 Provides Final Response to NRC RAI Re GL 98-01, Y2K Readiness of Computer Systems at Npps ML20210P8051999-08-0909 August 1999 Forwards Insp Rept 50-346/99-15 on 990712-16.No Violations Noted.However,Several Deficiencies Were Identified with Implementation of Remp,Which Collectively Indicated Need for Improved Oversight of Program IR 05000346/19980211999-08-0606 August 1999 Refers to NRC Insp Rept 50-346/98-21 Conducted on 980901- 990513 & Forwards Nov.Two Violations Identified Involving Failure to Maintain Design of Valve & Inadequate C/A for Degraded Condition Cited in Encl NOV 05000346/LER-1998-009, Forwards LER 98-009-01,IAW 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util Are Encl1999-08-0606 August 1999 Forwards LER 98-009-01,IAW 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util Are Encl ML20210H6101999-07-30030 July 1999 Informs That Region III Received Rev 21 to Various Portions of Davis-Besse Nuclear Power Station Emergency Plan.Revision Was Submitted Under Provisions of 10CFR50.54(q) in Apr 1999 ML20210H0491999-07-28028 July 1999 Forwards Application for Amend to License NPF-3,revising TS 3/4.7.5.1, Ultimate Heat Sink, to Allow Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G5521999-07-28028 July 1999 Provides Addl Response to 980923 OL Licensing Exam Rept 50-346/98-301 Re OL Exam Administered in Aug 1998.Results of Root Cause Investigation & Corrective Actions,Discussed ML20210G3831999-07-27027 July 1999 Forwards Application for Amend to NPF-3,changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20211P3071999-07-26026 July 1999 Forwards Final Rept for 990504 Biennial Radiological Emergency Preparedness Exercise for David-Besse Power Station.No Deficiencies Identified for Any Jurisdiction During Exercise ML20210G4391999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1, Safety Features Actuation Sys Instrumentation, & Associated Bases 3/4.3.1 & 3/4.3.2, Reactor Protection Sys & Safety Sys Instrumentation ML20210G7151999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising TSs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrument - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5151999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs for Implementation of 10CFR50,App J,Option B for Type B & C Containment Leakage Rate Testing ML20210G3211999-07-26026 July 1999 Forwards Written OL Exam & Supporting Matl for Exam to Be Administered at DBNPS During Week of 990913.Listed Encls Withheld from Public Disclosure Until After Exam Complete ML20210C4381999-07-20020 July 1999 Forwards Insp Rept 50-346/99-08 on 990513-0622.Unidentified RCS Leak Approached TS Limit of 1 Gallon Per Minute Prior to Recently Completed Maint Outage.Three Violations of NRC Requirements Identified & Being Treated as NCVs ML20209G3681999-07-15015 July 1999 Advises That Info Submitted in & 990519 Affidavit Re Design & Licensing Rept,Davis-Besse,Unit 1 Cask Pit Rack Installation Project,Holtec Intl, HI-981933,marked Proprietary,Will Be Withheld from Public Disclosure ML20207H6401999-07-0909 July 1999 Discusses Closure of TAC MA0540 Re Util Responses to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. Staff Has Revised Info in Rvid & Releasing It as Rvid Version 2 ML20209D1341999-07-0808 July 1999 Forwards Notice of Withdrawal of Application for Amend to Operating License.Proposed Change Would Have Modified Facility TSs Pertaining to Allowable as-found Pressure Lift Setting Tolerance of Two Pressurizer Code Safety Valves 05000346/LER-1998-012, Forwards LER 98-012-01,which Is Being Submitted to Provide Addl Info Re 981018 Occurrence.Commitment List Attached1999-07-0707 July 1999 Forwards LER 98-012-01,which Is Being Submitted to Provide Addl Info Re 981018 Occurrence.Commitment List Attached ML20209C3981999-07-0101 July 1999 Responds to NRC Re Violations Noted in Insp Rept 50-346/98-21.Corrective Actions:Developed Rev to Boric Acid Control Program & Work Process Guideline on Plant Leakage ML20209B5821999-06-24024 June 1999 Provides Justification for Rev to Completion Date for One of Insp follow-up Items Cited in Insp Rept 50-346/98-03, Designated as Inspector follow-up Item 50-346/97-201-10 ML20196G1251999-06-23023 June 1999 Responds to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196E5321999-06-17017 June 1999 Forwards Addl Info Re Relief Request RR-A16 to Support NRC Approval of Relief Request ML20195K2751999-06-16016 June 1999 Forwards Safety Evaluation Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20196A6601999-06-16016 June 1999 Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1 ML20195F9071999-06-10010 June 1999 Forwards Application for Amend to NPF-3,changing Tech Specs 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.7.6.1, Crevs ML20195F8851999-06-0707 June 1999 Withdraws 950929 License Amend Application,Proposing Mod to Allowable as-found Pressure Lift Setting Tolerance of Two Pressurizer Code Safety Valves ML20207G0751999-06-0707 June 1999 Forwards Insp Rept 50-346/99-04 on 990323-0513.Violations Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217N2321999-10-15015 October 1999 Requests NRC Approval to Use Alternative to Requirements of 10CFR50.55a(f)(4)(ii).Licensee Requests Extension to Specified Schedule for Implementing Updates to IST Program PY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl1999-10-14014 October 1999 Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl ML20216J6701999-09-24024 September 1999 Forwards Post Examination Documentation for Written Operator Initial License Examination Administered at Davis-Besse Nuclear Power Station on 990920.Without Encls 05000346/LER-1998-001, Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached1999-09-0909 September 1999 Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached ML20216E5961999-09-0707 September 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1,safety Features Actuation Sys Instrumentation & Associated Bases 3/4.3.1 & 3/4.3.2,reactor Protection Sys & Safety Sys Instrumentation ML20211K6611999-08-30030 August 1999 Forwards Copies of Operator License Renewal Applications for Individuals Listed.Operators Have Successfully Completed Appropriate Operator Requalification Training Program at Dbnps.Without Encls ML20211K6681999-08-30030 August 1999 Forwards Copies of Certified Personal Qualification Statement - Licensee (NRC Form 398) for Operator Candidates Listed Below.Without Encls ML20211H0201999-08-25025 August 1999 Forwards semi-annual FFD Rept for 990101-0630 for DBNPS, Unit 1,IAW 10CFR26.71(d) ML20211G3911999-08-20020 August 1999 Forwards Update to Estimated Info for Licensing Action Requests Through 010930,re Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl1999-08-19019 August 1999 Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl ML20211J9201999-08-13013 August 1999 Urges NRC to Find Funds for Stockpiling Radiation Pills for Residents Living Near Plant ML20210T1061999-08-12012 August 1999 Forwards Preliminary NRC Forms 398 & 396 for Listed Candidates,Per Operator License Exam Scheduled for Week of 990913.Encl Withheld ML20210S6071999-08-11011 August 1999 Provides Final Response to NRC RAI Re GL 98-01, Y2K Readiness of Computer Systems at Npps 05000346/LER-1998-009, Forwards LER 98-009-01,IAW 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util Are Encl1999-08-0606 August 1999 Forwards LER 98-009-01,IAW 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util Are Encl ML20210H0491999-07-28028 July 1999 Forwards Application for Amend to License NPF-3,revising TS 3/4.7.5.1, Ultimate Heat Sink, to Allow Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G5521999-07-28028 July 1999 Provides Addl Response to 980923 OL Licensing Exam Rept 50-346/98-301 Re OL Exam Administered in Aug 1998.Results of Root Cause Investigation & Corrective Actions,Discussed ML20210G3831999-07-27027 July 1999 Forwards Application for Amend to NPF-3,changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G7151999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising TSs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrument - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5151999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs for Implementation of 10CFR50,App J,Option B for Type B & C Containment Leakage Rate Testing ML20210G3211999-07-26026 July 1999 Forwards Written OL Exam & Supporting Matl for Exam to Be Administered at DBNPS During Week of 990913.Listed Encls Withheld from Public Disclosure Until After Exam Complete ML20210G4391999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1, Safety Features Actuation Sys Instrumentation, & Associated Bases 3/4.3.1 & 3/4.3.2, Reactor Protection Sys & Safety Sys Instrumentation ML20211P3071999-07-26026 July 1999 Forwards Final Rept for 990504 Biennial Radiological Emergency Preparedness Exercise for David-Besse Power Station.No Deficiencies Identified for Any Jurisdiction During Exercise 05000346/LER-1998-012, Forwards LER 98-012-01,which Is Being Submitted to Provide Addl Info Re 981018 Occurrence.Commitment List Attached1999-07-0707 July 1999 Forwards LER 98-012-01,which Is Being Submitted to Provide Addl Info Re 981018 Occurrence.Commitment List Attached ML20209C3981999-07-0101 July 1999 Responds to NRC Re Violations Noted in Insp Rept 50-346/98-21.Corrective Actions:Developed Rev to Boric Acid Control Program & Work Process Guideline on Plant Leakage ML20209B5821999-06-24024 June 1999 Provides Justification for Rev to Completion Date for One of Insp follow-up Items Cited in Insp Rept 50-346/98-03, Designated as Inspector follow-up Item 50-346/97-201-10 ML20196G1251999-06-23023 June 1999 Responds to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196E5321999-06-17017 June 1999 Forwards Addl Info Re Relief Request RR-A16 to Support NRC Approval of Relief Request ML20196A6601999-06-16016 June 1999 Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1 ML20195F9071999-06-10010 June 1999 Forwards Application for Amend to NPF-3,changing Tech Specs 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.7.6.1, Crevs ML20195F8851999-06-0707 June 1999 Withdraws 950929 License Amend Application,Proposing Mod to Allowable as-found Pressure Lift Setting Tolerance of Two Pressurizer Code Safety Valves ML20207F4231999-06-0202 June 1999 Forwards Rev 1 to DBNPS Emergency Preparedness Evaluated Exercise Manual 990504, IAW 10CFR50.4.NRC Evaluated Exercise Has Been Rescheduled for 991208,since NRC Did Not Evaluate 990504 Exercise ML20207E2521999-05-28028 May 1999 Forwards Rev 18,App A,Change 1 to Davis-Besse Nuclear Power Station,Unit 1,industrial Security Plan IAW Provisions of 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20207E9561999-05-28028 May 1999 Forwards Update to NRC AL 98-03,re Estimated Info for Licensing Activities Through Sept 30,2000 ML20207E7801999-05-21021 May 1999 Forwards Application for Amend to License NPF-3,allowing Use of Expanded Spent Fuel Storage Capacity.Proprietary & non- Proprietary Version of Rev 2 to HI-981933 Re Cask Pit Rack Installation Project,Encl.Proprietary Info Withheld ML20206N0231999-05-0606 May 1999 Forwards License Renewal Applications for Davis-Besse Nuclear Power Station,Unit 1 for ML Klein,Cn Steenbergen & CS Strumsky.Without Encls ML20206D2421999-04-28028 April 1999 Forwards Combined Annual Radiological Environ Operating Rept & Radiological Effluent Release Rept for 1998. Rev 11, Change 1 to ODCM & 1998 Radiological Environ Monitoring Program Sample Analysis Results Also Encl PY-CEI-NRR-2382, Forwards 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for FY98 Also Encl1999-04-21021 April 1999 Forwards 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for FY98 Also Encl ML20206B8831999-04-17017 April 1999 Forwards 1634 Repts Re Results of Monitoring Provided to Individuals at Davis-Besse Nuclear Power Station During 1998,per 10CFR20.2206.Without Repts ML20205K3871999-04-0707 April 1999 Forwards Copy of Application of Ceic,Oec,Ppc & Teco to FERC, Proposing to Transfer Jurisdictional Transmission Facilities of Firstenergy Operating Companies to American Transmission Sys,Inc.With One Oversize Drawing ML20205K5641999-04-0707 April 1999 Forwards Response to NRC 980415 RAI Re GL 96-06, Assurance of Equipment Operability & Ci During Design-Basis Accident Conditions. Rept FAI/98-126, Waterhammer Phenomena in Containment Air Cooler Swss, Encl ML20205J1171999-03-29029 March 1999 Forwards Rev 1 to BAW-2325, Response to RAI Re RPV Integrity, Per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rev Includes Corrected Values in Calculations PY-CEI-NRR-2377, Submits Decommissioning Repts for Bvps,Units 1 & 2,Davis- Besse Nuclear Power Station,Unit 1 & Perry Nuclear Power Plant,Unit 1,per 10CFR50.75(f)(1)1999-03-29029 March 1999 Submits Decommissioning Repts for Bvps,Units 1 & 2,Davis- Besse Nuclear Power Station,Unit 1 & Perry Nuclear Power Plant,Unit 1,per 10CFR50.75(f)(1) ML20205F5961999-03-27027 March 1999 Forwards Comments on Preliminary Accident Sequence Percursor (ASP) Analysis of 980624 Operational Event at Dbnps,Unit 1, as Transmitted by NRC Ltr ML20205D4791999-03-26026 March 1999 Forwards Rept Submitting Results of SG Tube ISI Conducted in Apr 1998.Rept Includes Description of Number & Extent of Tubes Inspected,Location & Percent wall-thickness Penetration for Each Indication of Imperfection ML20205L2031999-03-26026 March 1999 Submits Correction to Dose History of Tj Chambers.Dose Records During 1980-1997 Were Incorrectly Recorded Using Wrong Social Security Number.Nrc Form 5 Not Encl ML20205C7371999-03-25025 March 1999 Certifies That Dbnps,Unit 1,plant-referenced Simulator Continues to Meet Requirements of 10CFR55.45(b) for Simulator Facility Consisting Solely of plant-referenced Simulator.Acceptance Test Program & Test Schedule,Encl ML20205E3551999-03-19019 March 1999 Requests That Proposed Changes to TS 6.8.4.d.2 & TS 6.8.4.d.7 Be Withdrawn from LAR Previously Submitted to NRC ML20204J6361999-03-17017 March 1999 Forwards Firstenergy Corp Annual Rept for 1998 & 1999 Internal Cash Flow Projection as Evidence of Util Guarantee of Retrospective Premiums Which May Be Served Against Facilities PY-CEI-NRR-2375, Forwards List That Details Util Insurers,Policy Numbers & Coverage Limits for Two Power Plants,Per Requirements of 10CFR50.54(w)(3) Re Reporting of Property Insurance Coverage1999-03-15015 March 1999 Forwards List That Details Util Insurers,Policy Numbers & Coverage Limits for Two Power Plants,Per Requirements of 10CFR50.54(w)(3) Re Reporting of Property Insurance Coverage ML20204E6821999-03-12012 March 1999 Requests That Listed Changes Be Made to NRC Document Svc List for Davis-Besse Nuclear Power Station,Unit 1 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARML20065D0491990-09-14014 September 1990 Forwards Operator & Senior Operator Licensing Exam Ref Matl for Exam Scheduled for Wk of 901112,per 900607 Request ML20065D4951990-09-14014 September 1990 Forwards Updated Exam Schedule for Facility,In Response to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule ML20059K4681990-09-14014 September 1990 Provides Supplemental Info Re Emergency Response Data Sys (Erds).Data Transmitted by Util ERDS Will Have Quality Tag of 4 & Point Identification for ERDS Renamed ML20059G2341990-09-10010 September 1990 Provides Response to Request for Addl Info Re Interpretation of Tech Spec 3/4.7.10, Fire Barriers. Interpretation Is Implemented & Unnecessary Compensatory Measures Removed.List of Fire Barriers Inspected on One Side Only Encl ML20059G4961990-09-0606 September 1990 Submits Voluntary Rept of Svc Water HX Testing During Sixth Refueling Outage.Expected Flow Rates Not Achieved.Periodic Tests Developed to Check Efficiency of Containment Air Coolers ML20064A6271990-09-0606 September 1990 Requests That Requirement Date for Installation & Testing of Alternate Ac Power Source & Compliance w/10CFR50.63 Be Deferred Until Completion of Eighth Refueling Outage ML20028G8611990-08-28028 August 1990 Forwards Davis Besse Nuclear Power Station Semiannual Rept: Effluent & Waste Disposal,Jan-June 1990. ML20059D4121990-08-28028 August 1990 Forwards Second 10-Yr Interval Pump & Valve Inservice Testing Program ML20059D5521990-08-24024 August 1990 Forwards Semiannual Fitness for Duty Rept for Jan-June 1990 ML20059B5291990-08-23023 August 1990 Forwards Updated Fracture Mechanics Analysis of Hpi/Makeup Nozzle,Per 900510 Meeting W/Nrc.Util Believes That Addl Analysis to Assess Structural Integrity of Nozzle Using More Conservative Fracture Model Supports Previous Analysis ML20058Q3911990-08-16016 August 1990 Requests NRC Concurrence on Encl Interpretation & Technical Justification of Tech Spec 3/4.7.10, Fire Barriers ML20058P7801990-08-10010 August 1990 Advises of Intentions to Revise Testing Requirements for Fire Protection Portable Detection Sys at Plant & Functional Testing of auto-dialer & Telephone Line Subsys from Daily to Weekly Testing ML20063P9981990-08-0909 August 1990 Submits Supplemental Response to Insp Rept 50-346/89-21. Util Rescinds Denial & Accepts Alleged Violation ML20056A5341990-08-0303 August 1990 Confirms Electronic Transfer of Payment of Invoice I0942 Covering Annual Fee for FY90,per 10CFR171 ML20058M7791990-08-0303 August 1990 Forwards Rev 10 to Industrial Security Plan & Rev 6 to Security Training & Qualification Plan.Revs Withheld ML20058L1821990-08-0101 August 1990 Forwards Davis-Besse Dcrdr Human Engineering Discrepancy Repts 1988 Summary Addendum 1,Vol 1, Per NRC Audit Team Request ML20056A8341990-07-23023 July 1990 Forwards Revised Monthly Operating Rept for June 1990 for Davis-Besse Nuclear Power Station Unit 1 ML20055H4601990-07-20020 July 1990 Discusses Resolution of Draft SER Open Item on Voluntary Loss of Offsite Power.Util Preparing License Amend Request Per Generic Ltrs 86-10 & 88-12 to Relocate Fire Protection Tech Specs & Update Fire Protection License Condition ML20055F9681990-07-17017 July 1990 Forwards Application for Amend to License NPF-3,adding Centerior Svc Company as Licensee in Facility Ol.Change Allows for Improved Mgt Oversight,Control & Uniformity of Nuclear Operations ML20055F8561990-07-17017 July 1990 Discusses Util Planned Activities Re Instrumented Insp Technique Testing Performed at Facility in View of to Hafa Intl.Relief Requests Being Prepared by Util for Sys on Conventional Hydrostatic Testing ML20044B3001990-07-12012 July 1990 Provides Written Confirmation of Util Electronic Transfer of Funds to NRC on 900711 in Payment of Invoice Number I1050 ML20044B1841990-07-10010 July 1990 Requests Approval of Temporary non-code Repair & Augmented Insp of Svc Water Piping,Per 900626 Telcon ML20055D9701990-06-29029 June 1990 Provides Written Confirmation of Util Electronic Transfer of Funds for Payment of Invoice 0111 Covering Insp Fees for 890326-0617 ML20043H5291990-06-14014 June 1990 Forwards Plans Re Reorganization & Combining of Engineering Assurance & Svc Program Sections ML20055C7521990-06-14014 June 1990 Responds to NRC Bulletin 89-002, Potential Stress Corrosion Cracking of Internal Preloaded Bolting in Swing Check Valves & Justification for Alternate Insp Schedule for One Valve. No Anchor Darling Swing Check Valves Installed at Plant ML20055F2261990-06-14014 June 1990 Forwards 1990 Evaluated Emergency Exercise Objectives for Exercise Scheduled for 900919 ML20043G5661990-06-14014 June 1990 Forwards Rev 9 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21) ML20043G7811990-06-12012 June 1990 Forwards Info Re Implementation of NUREG-0737,Item II.F.2, Inadequate Core Cooling Instrumentation, Per NRC 900214 Safety Evaluation.Item II.B.1 Issue Re Reactor Vessel Head Vent Also Considered to Be Closed ML20043F6091990-06-11011 June 1990 Forwards Util Comments on NRC Insp Rept 50-346/90-12, Per 900601 Enforcement Conference Re Core Support Assembly Movement & Refueling Canal Draindown.Refueling Canal Draindown Procedure Provides Specific Draining Instructions ML20043E1301990-06-0101 June 1990 Withdraws 870831 & 890613 Applications to Amend License NPF-3.Changes Requested Addressed by Issuance of Amend 147 or Can Now Be Made as Change to Updated SAR Under 10CFR50.59 ML20043D5601990-05-31031 May 1990 Forwards Application for Amend to License NPF-3,revising Tech Spec 3/4.6.4.1, Combustible Gas Control - Hydrogen Analyzers. Request Consistent W/Nrc Guidance,Generic Ltr 83-37,dtd 831101,NUREG-0737 Tech Specs & Item II.F.1.6 ML20043D5691990-05-31031 May 1990 Forwards Application for Amend to License NPF-3,requesting Extension of Expiration Date of Section 2.H to Allow Plant Operation to Continue Approx 6 Yrs Beyond Current Expiration Date ML20043D1451990-05-31031 May 1990 Forwards Rev 11 to Updated SAR for Unit 1.Rev Updates Table 6.2-23 Re Containment Vessel Isolation Valve Arrangements ML20043D1621990-05-29029 May 1990 Documents Util Understanding of NRC Interpretation of Plant Tech Spec 3.7.9.1,Action b.2 Re Fire Suppression Water Sys, Per 891206 Telcon.Nrc Considered Electric Fire Pump Operable Provided Operator Stationed to Open Closed Discharge Valve ML20043C2331990-05-25025 May 1990 Forwards Summary of 900510 Meeting W/B&W & NRC in Rockville, MD Re Hpi/Makeup Nozzle & Thermal Sleeve Program.List of Attendees & Meeting Handout Encl ML20043B1701990-05-18018 May 1990 Forwards Revised Exemption Request from 10CFR50,Section III.G.2,App R for Fire Areas a & B,Adding Description of Specific Limited Combustibles That Exist Between Redundant Safe Shutdown Components in Fire Area a ML20043A5441990-05-16016 May 1990 Discusses Status of Safety & Performance Improvement Program Portion of B&W Owners Group EOP Review Project ML20043A2311990-05-11011 May 1990 Responds to Violation Noted in Insp Rept 50-346/90-08. Corrective Actions:Results of Analysis of Radiological Environ Samples & Radiation Measurements Included in 1989 Annual Radiological Environ Operating Rept ML20043A4901990-05-10010 May 1990 Forwards Summary of Differences Between Rev 5 to Compliance Assessment Rept & Rev 1 to Fire Area Optimization,Fire Hazards Safe Shutdown Evaluation, Vols 1-3.Rept Demonstrates Compliance W/Kaowool Wrap Removal ML20042F9801990-05-0404 May 1990 Provides Written Confirmation of Util Electronic Transfer of Payment of Invoice Number 10716 to Cover Third Quarterly Installment of Annual Fee for FY90 ML20042F5781990-05-0303 May 1990 Provides Status of Hpi/Makeup Nozzle & Thermal Sleeve Program.Nrc Approval Requested for Operation of Cycle 7 & Beyond Based on Program Results.Visual Insp of Thermal Sleeve Identified No Thermal Fatique Indications ML20042F0951990-04-30030 April 1990 Responds to Violations Noted in Insp Rept 50-346/90-02. Corrective Actions:Maint Technician Involved in Tagging Violation Counseled on Importance of Procedure Adherence W/ Regard to Personnel Safety ML20042F0841990-04-27027 April 1990 Responds to Violations Noted in Insp Rept 50-346/89-201 for Interfacing Sys LOCA Audit on 891030-1130.Corrective Actions:Plant Startup Procedure Will Be Revised Prior to Restart from Sixth Refueling Outage ML20042E7311990-04-27027 April 1990 Forwards Application for Amend to License NPF-3,deleting 800305 Order Requiring Implementation of Specific Training Requirements Which Have Since Been Superseded by INPO Accredited Training Program ML20042F1961990-04-27027 April 1990 Informs of Adoption of Reorganization Plan Re Plants on 900424.Reorganization Will Make No Changes in Technical or Financial Qualifications for Plants.Application for Amends to Licenses Adding Company as Licensee Will Be Submitted ML20043F7261990-04-20020 April 1990 Requests Exemption from 10CFR55.59(a)(2) to Permit one-time Extension of 6 Months for Reactor Operators & Senior Reactor Operators to Take NRC 1990 Requalification Exam. Operators Will Continue to Attend Training Courses ML20042E7091990-04-17017 April 1990 Forwards Annual Environ Operating Rept 1989 & Table 1 Providing Listing of Specific Requirements,Per Tech Spec 6.9.1.10 ML20012F5091990-04-0303 April 1990 Forwards Completed NRC Regulatory Impact Survey Questionnaire Sheets,Per Generic Ltr 90-01 ML20012F6001990-04-0202 April 1990 Submits Supplemental Response to Station Blackout Issues,Per NUMARC 900104 Request.Util Revises Schedule for Compliance W/Station Blackout Rule (10CFR50.63) to within 2 Yrs of SER Issuance Date ML20012E0181990-03-22022 March 1990 Forwards Application for Amend to License NPF-3,changing License Condition 2.C(4) Re Fire Protection Mods to Fire Extinguishers,Fire Doors,Fire Barriers,Fire Proofing,Fire Detection/Suppression & Emergency Lighting 1990-09-06
[Table view] |
Text
,. -.
TOLEDO
%ss EDISON Docket No. 50-346 JOE WILUAMS. JR.
w u v,mm License No. NPF-3 $$$
Serial No. 1314 November 24, 1986 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz PWR Project Directorate No. 6 Division of PWR Licensing-B United States Nuclear Regulatory Commission 7ashington, D. C. 20555
Dear Mr. Stolz:
The purpose of this letter is to provide for informational purposes Toledo Edison's plans to utilize the HAFA International, Incorporated, Instrumented Inspection Technique (IIT) in a check valve test program at the Davis-Besse Nuclear Power Station, Unit No. I for those systems outlined in Serial No. 1199, dated October 18, 1985. The NRC has approved the use of the IIT as an alternative pressure testing method for the Davis-Besse Nuclear Power Station,' Unit No. 1 by letter dated November 13, 1985 (Log No.
1861).
The IIT is an alternate method for meeting the intent of ASME Section XI requirements for pressure testing, in general, of Class 1, 2, and 3 systems and components. The IIT was submitted to the NRC in Topical Report HAFA 135 (P)(A), and was approved by the NRC on November 7,1985.
IIT has the capability of obtaining reproducible data in the detection of external system leakage and intra- and intersystem valve leakage, while reducing personnel exposure to radiation and eliminating the potential for overpressurization of lower pressure rated piping and components.
This capability has been demonstrated by developmental work and inservice experience at four plants.
This program will test those check valves listed in Enclosure 1 for functional conformation at a test frequency of at least once every two years. This frequency is based on past experience of IIT testing for check valves in non-brackish water environments. The data on which this frequency is based is available on-site for review. This frequency is also based on the 1980 Edition of ASME Section XI clarification to the performance of leak testing once every two years.
A t 8612O20589 861124 PDR ADOCK 05000346 PDR R
Q g
G THE TOLEDO EDISON COMPANY ED SON PLAZA 300 MAD l SON AVENUE TOLEDO. CHO 43652 l
~
Docket No. 50-346 License No. NPF-3 Serial No. 1314 November 24, 1986 Page 2 As you should be aware, Topical Report HAFA 135 (P)(A) is proprietary information and it should continue to be handled as NRC " Official Use Only" information. It should not be discussed or made available to any person not requiring such information.
Very truly yours, N
JW:EC:p1f Enclosures cc: DB-1 NRC Resident Inspector NSSS Reviewers:
B. D. Liew J. Wong
. P. T. Kuo j T.-Marsh G. Johncon i
I f
1 L
i
o Docket No. 50-346 License No. NPF-3 Serial No. 1314 November 24, 1986 Enclosure 1 Check Valves Tested or To Be Tested Post November 13, 1985 at Davis-Besse Unit 1 Nuclear Power Station, Using HAFA International's Instrumented Inspection Technique (IIT)
VALVE P&ID & LOCATION
AF1 M-006D-1(G-6)
AF2 M-006D-1(H-4)
AFIS M-006D-1(E-10)
AF16 M-006D-1(J-9)
AF19 M-006D-1(G-11)
AF20 M-006D-1 (J-11)
AF49 M-006D-1(C-5)
AF52 M-006D-1(D-6)
AF63 M-006D-1(G-8)
AF68 M-006D-1(K-6)
AF39 M-007B-2(B-12)
AF43 M-007B-2(B-3)
AF72 M-007B-2(B-10) .
AF73 M-007B-2(A-8)
AF74 M-007B-2(A-7)
AF75 M-007B-2(B-5)
FW147 M-007B-2(E-11)
FW156 M-007B-2(F-3)
RC51 M-030A-10(C-9)
MU169 M-031B-3(D-7)
CF2A M-033-45(B-3)
CF29 M-033-45(B-2)
DH49 M-033-45(H-2)
HP48 M-033-45(C-3)
HP49 M-033-45(C-2)
HP50 M-033-45(C-3)
HP51 M-033-45(C-2)
HP56 M-033-45(C-4)
HP57 M-033-45(C-4)
HP58 M-033-45(C-4)
HP59 M-033-45(C-4)
CS9 M-034-32(D-9)
- CS10 M-034-32(D-9) l CC17 M-036A-0(D-5) i
'Dockht No. 50-346 License No. NPF-3 Serial No. 1314 November 24, 1986 Enclosure 1 VALVE P&ID &^ LOCATION CC18 .M-036A-0(G-5)
CC19 M-036A-0(J-5)
CC532 ~M-036A-0(F-9)
CC533 M-036A-0 (H-9)
CC91 M-036B-0(B-3)
CC530' M-036B-0(B-5).
CC531 M-036B-0(B-3)
CC549 M-036E-0(B-4)
- These valves (MS726, MS727, MS734, MS735, AS274) were tested with water to check the leak tightness of the valve. In the future, the above mentiened valves will be tested using acoustic emissions for gross leakage.
- These valves will'still be leak tested to the frequency as specified in the Technical Specifications for pressure boundary isolation valves.
The attached drawings provide examples of the current instrument connections for several check valves tested. Details of these tests and of all other tests,.a regression analysis of the results, and acceptance criteria applied are provided in our test procedures, which are available on-site for review. 11e acceptance criteria for the check velves are based on both in:ra- and inter-system leakage considerations for the system func-tional requirements for those valves and maintenance considerations (i.e., measured leakage, while acceptable, indicates degradation is occurring and planned maintenance may be warranted).
1".EY TO ATTACHED DRAWINGS L = Leak Measuring Device i
A = Acoustic Emission Sensor
, = Pressurized Portion of Line i
H '
l 1**
swl3e2 4 w3 swn ?; 8 7 tF5j AUXILIARY FEEDWATER TEST 6 g3g x-n L w5 [sw7 8 '
FWiO5 @ L ( AM9) AF73, AF75) l@g LO pg Sw9 M {AF59 LO "**
-u FP2B 6H9022 D $535 6HBDl31 AF811P 9 05 Jk 2 AF83 AF84 AF38 di t
3[2 8HB0272 -
' l 9
- g BD AF360 AF3870 AF72 3 74p37 AF608 L A 26 ^ AF9 LO 1PAFS O l LO ,, [ .j'*' 3EBDl4 g FW A AF "LT AF64 "8
0 2E80 N ^#3969 " CD p34
= hHB02iO' Ari -14 AF50 W
% g -
^ f/2H900lO S
^"kFIS @ AF73 ) AF52 9 4979 Ap
/
BRG
@HBD42% CLNG
[ g g,7 LO 1
LC M lHBD210 F6$ AF5 -
hhBD429 gov 8 1 P FWi%
2H LC
- - [ m>; W JLpwgoi4 gHBD2iO CLNG AF23 hMBD2f0 AFg y Fw91 LO GHE024 e
(
-NHBD2iO ~ Fl6 CLNG
[
EBD62 AFl2 lH902iO-l4HBD429 BRNG N AF66 34MBD427
( g 3FAF22 q Ab LC pg AF68 $H8D2IO{ LO m _/AF74 IP U FWlOl2 Ag IF2HBD2to 4- s W
7 ^ & L@
AF6[ O AF3871 AF49 T g X^'5' j^"f 3eem j fA ^'M seso a f,,'*D A &
A6HBD22Ga- 7 5334 E ,
SWlO Aw LO
, A :,
AF78 'F 76 4 AF42 w FI6 7 Swr 30 C SW4 gWl3 l gwg @ L -
, i/2HBDl39
-1 LC Wl382 W3 IIsWil ""O
$E A ^25) AUXILIARY FEEDWATER E E if f
@ e TEST 7 I '" "
a 1 LO f
T/ -M t
F' 5 X7 b AFS9 LO L E (MW, MW M"3 /
-u 6HSD22 P gn i FP2B %E D 5535 AF81 OS 2 AF83 AFB 4 %
k-g AF33 w 0[
[ 8HBD272 _
J BDl4 N 43% AF38 t c ,;i- 4Qm, - k
A
/ Ap37 @y_AF608 FWh6 L AFI AF26 l A
O l LO [ AF9 LO - >4 3EBD;4 a NRA AF3 A 2E )
= hHBD2;O, AFl3 to -l4 AF30 g
( %
M AF63 H902iO, AFIS b y [AF73 4 AFS2 I 4lf9 k hMBD429CLNG y
AF65 A AFl7 LO C $ d L @
IHBD210 gh80429 O $) y Fwl0S l GOV 2Hgol3 a m -
- gHBD2iG hHED210 AF23 A 8 F W91 LO "'
>4r 8 >
GH W MHBD2:0 GOV CLNG 7.6 , n ,n m j")
(HBD210],hHBD429 1 EBD62 AFl2 h~~""~
AF BRNG 7 3AF6 Lg , q. )
f 3HBD429f CLNG AF22 g AF68 b" l '
@ AI74 J2HB 21
@- T , 3A LT w
Ar67 l
AFtO AF79 mFWlOl3 g; AF4 #
4p5 Q 7
'h s
i AF32 AF77 685 FW79d AF2 6HSD22 #
Sf.$b ' ' -
6E6034
-34E8Df4 ' g'F20 AF338 l AI33M AF75 N ' AF43q I' 4
7 '"6 [ss3' pc_" t
' 41 A F42 AF599 AS*'O {AF78 AF76 pgg g Swr 38 C W4 lhMBDl39
1[swlse2
[ 1^*
sw3 'P
'swl ^25, xme LO sW5 d
-H e'
AUXILIARY FEEDWATER TEST 9 (($
43%
/SW7 (NF43)
FWlOS
{A 9 !ZZ pi 5W9 6 EPP SI FP2B g AF84 1IA 2 AF AF84 AF33 C$
LO Jk 8p 8HBD272 :
O l -
5y II ) EBD I#
FW7g6 AFI 2 AF7thHBO 62 1 AF2 y 2iA l AF9 0 3E BDl4 g; 1 FW AF3
@ O Jk F34 H 210 '
Z ' @ ;
m ^ taH9D210 AFl5 0 1rg AF73 ,AFS2 BRG ~
gpi7
~o 4979 iBD429 CLNG T AF55 0 JL LC b M IHBD210
)W+l1BD429 GCv F65 to W LC g
y2LOFWlO5 2H90 AFWiOl4 CLNG 7[
gHBD2iO kHBD210 gp W FW98 GHBD24 OV FI6 $
MHBD2io -
IH8D210 MHBD429 BRNG hHBD429-
- AF CLNG A 6 N g 3F AF22 4 { HW2O m 4 LLC to gH802iO m FWiOt2 AF68 /AF74 Ag (){HBD210 4-7 A LO e AF4 AF387; AF49 T AF56 -
AF27 @ AFN' 605 E #
, 12[s ~[ 6
~~FW790 QF "O
A ggg3,5 272 \ i
- E GEBDi4 Nt X Q .Q b, $( u " RS- r
- L O A'F20 AF388 Af3h2 AF75 I 3- ~- rAF5
'9 9 6 {s?4BDI4P s34 g 'g swlO LO l
ap7g AF76 43 FIG 10 se3a C sw4 }wl3 i
i4HsD 39 swa G '
) ( ENCL 4
HSWl382 '
{AF50 3 p:
swa s wn noo n Af5) AUXILIARY FEEDWATER 0 ;l R-LO swS sw7 _g. @ g TEST 2 @EE L
e ' _
FWiO5 1PAF59 L L (6M k!!
6HBD22 P 3 F %E D SS35 AF8 A OS AF83 AF84 AF38 8 pi 0 M i 8HBD272 [ ~~ ~ I ,vN
- 2. 6EBDM
(' (i AF360 I 1 ^ d 'b N-C ' b rII
- h i AF3870 AF72 l FW7 6 AFI L Ap2g k Ab }gs
% 'EBD 62-1, r I AF9 LO g I 13EBDl4I o ns b @ (
)
> dk A
ggAFGO8 6
2iA i
)g r
,. n '
q AFS v p '" gw 3)
= AF3 HBo2'O, AF64 AFI O 2E80
-g4 N) AF3969 i my g F34 AF30 ( @ )$ m, I
@ AF63 /2H90210, *[FIS pg F73 AF52 o -
- I1 4379 , 'faHBD429. CLNG g > / O .M t
meDaio peo429 GOV AFg5 Lg L tc 9 N $ ) 1FWlO!4 "*'"
2HODf3 e
"k gHsD2iOctHo kHSD2io ) (
OAF23 s FW91 ^Ab8 [8 W $
(
CD
)
GHE024 MHBD2:0 0 . Fl6 )
r J;}
A 6 t$E8062 AFI2 q >(
IH8D2lO4HBD429 BRNG O
_._ '/ , L 4 f dHBD210 AFI4 w LC @A V QH802tO )
L AF68 4 !)2HBD210 LO N
@ F74 g FWlOl2
}
7 AF AFIO LO ) g3 e AF4 lf p AF387 Q^ 79 1 F49 T LO FW790 AF2 BHBDeg 6EBDl4 6HBD22# ' ' '
4 ;B014 t ) ,y( g ,
y
, AF20 AF3B3 l Af3832 AF75 _5 (5S34 C9 SWlO LO
, LAC 43 AF599 AF78 AF76 4t hAF42
, igg 33,33 he @[ #
o bdb yCMOk mCO MMWd3 TOLEDO EDISON Docket No. 50-346 JOE WiluAMs. JR.
Senor Vce Presort-Nuoear (419] P49-2300 License No. NPF-3 i4is)24a.s223 Serial No. 1199 October 18, 1985 Director of Nuclear Reactor Regulation
~
Attention: Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Licensing United States Nuclear Regulatory Commission Washington, D. C. 20555
Dear Mr. Stolz:
The purpose of this letter is to request Nuclear Regulatory Commission (NRC) approval to use an alternative inspection technique at the Davis-Besse Nuclear Power Station Unit I to satisfy the Inservice Pressure Testing requirements of the ASME Code,Section XI, as permitted by 10CFR50.55a(a)(3).
The details of this alternative inspection technique, Instrumented Inspection Technique (IIT), are the subject of a H.A.F.A. International, Inc., Topical Report HAFA 135(P)(A). This topical report is currently under NRC review, and based on a meeting with NRC staff personnel on September 24, 1985, it is our understanding that the topical report will be approved in the near future.
The plant systems identified below have been evaluated in accordance with Section I7 of the topical report. Based on these evaluations, it has been determined that the IIT can be implemented on the appropriate portions of I the following systems:
Main Steam Auxiliary Feedwater l Decay Heat / Low Pressure Injection ,
High Pressure Injection l Containment Spray Core Flood Component Cooling Water Service Water Station Drain Steam Generator Sampling and Blowdown l Main Feedwater Reactor Coolant f
THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. CHIO 4365?
/ 7 0
a-
4 Dockst No. 50-346 Licznsa Ns. NPF-3 Serial No. 1199 October 18, 1985 Page 2 For the current Davis-Besse Unit 1 outage, we intend to implement the IIT on portions of the Core Flood, Decay Heat, Auxiliary Feedwater and High Pressure Injection systems. Although we have chosen to conduct the ASME Section XI Code " System Hydrostatic Test" of IWA-5211(d) on the NSSS portion of the Reactor Coolant System, the IIT may also be implemented selectively within that boundary.
Because we would like to implement the IIT on some of the above systems during the current outage, we request your approval by October 30, 1985.
We are available at your convenience, if needed, to discuss this matter further.
It should be noted that Toledo Edison recognizes the capability of the IIT method to determine intersystem leakage, and therefore, may opt to take credit for this method to satisfy the Inservice Testing Program and Technical Specification requirements where appropriate.
Very truly yours,
& d'?=" ,
JW/JDE/SGW/bjs cc: DB-1 NRC Resident Inspector t
a 84ttk 3fot4 % b t vs o O <~ N I MN .
,.[nne% t UNITED STATES l
O N" Nm#N 5 j e
NUCLEAR REGULATORY COMMISSION WASmNGTON, D. C. 20555 Lscensing cc: J. WMms, Je j
% T D. u ay f November 13, 1985 L
.,,,,# S. M. Quennor M .
Docket No. 50-346 [M.fL.MS Stewart L A. Gnme R. G. Schuerger STA. .
Mr. Joe Williams, Jr. SAR44 -
Vice President, Nuclear UOV 13 g 5J8'.
Toledo Edison Company a.ga -
Edison Plaza - Stop 712 300 Madison Avenue MM E.caba Toledo, Ohio 43652
Dear Mr. Williams:
SUBJECT:
REQUEST FOR APPROVAL TO USE AN ALTERNATIVE PRESSURE TESTING METHOD -
DAVIS-BESSE NUCLEAR POWER STATION.
By letter dated October 18, 1985 (Serial No. 1199), Toledo Edison company requested approval to use an alternative inspection method to meet the requirements of Section XI of the ASME Code for inservice pressure tests at Davis-Besse. The alternative testing method, Instrumented Inspection Technique, is described in a topical report submitted to the NRC by HAFA International Incorporated by letter dated April 4,1985 to demonstrate that the proposed alternative would provide an acceptable level of quality and safety as required by 10 CFR 50.55a(a)(3).
We have reviewed and evaluated the proposed alternative testing method as discussed in the topical report. We have determined that the alternative testing method provides added assurance of system and component structural integrity and leak tightness when compared to conventional pressure testing and is therefore an acceptable alternative. We have also determined that the small leak detection and location capabilities of the alternative method make it applicable for intersystem leakage detection, and that the four-hour hold time requirement prior to visual inspection of the systems may be reduced to two hours. We therefore approve its use as an alternative testing method as requested in your letter, incerely, ,
e ill Jo $ F. Stolz, Chief 0 rating Reactors Branch #4 Division of Licensing cc: See next page __ i S% t Log Number '
E4 noct ar rac cngr Lead C staten Lead C Nuctcar Services Lead C QA Lead C Nuc Saf & Lie lead C lodus.Secunty Lead O o:ner I uooc hRC Due D:le
/
y Yk$' JAuJ is/v/ar
a o .. ,~
Mr. J. Williams Davis-Besse Nuclear Power Station Toledo Edison Company Unit No. I cc:
Donald H. Hauser, Esq. Ohio Department of Health The Cleveland Electric
- ATTN: Radiological Health Illuminating Company Program Director P. O. Box 5000 P. O. Box 118 Cleveland, Ohio 44101 Columbus, Ohio 43216 Mr. Robert F. Peters ' Attorney General Manager, Nuclear Licensing Department of Attorney Toledo Edison Company General Edison Plaza 30 East Broad Street 300 Madison Avenue Columbus, Ohio 43215 Toledo, Ohio 43652 Mr. James W. Harris, Director Gerald Charnoff, Esq. Division of Power Generation Shaw, Pittman, Potts Ohio Department of Industrial Relationt and Trowbridge 2323 West 5th Avenue 1800 M Street, l'_W. P. O. Box 825 Washington, D.C. 20036 Columbus, Ohio 43216 Paul M. Smart, Esq. Mr. Harold'Kohn, Staff Scientist
. Fuller & Henry Power Siting Commission 300 Madison Avenue 361 East Broad Street P. O. Box 2088 Columbus, Ohio 43216 Toledo, Ohio 43603 Mr. Robert B. Borsum President, Board of Babcock & Wilcox Ottawa County Nuclear Power Generation Port Clinton, Ohio 43452 Division Suite 200, 7910 Woodmont Avenue Bethesda, Maryland 20814 i Resident Inspector U.S. Nuclear Regulatory Commission 5503 N. State Rou.e 2 Oak Harbor, Ohio 43449 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
--n , , - , - , , ,- , . - - - . - - . . . - , . , , , , _ _ .-
, . ~ - ,.