ML20210N216
| ML20210N216 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse, Perry, 05000000 |
| Issue date: | 09/25/1986 |
| From: | Roberts T NRC COMMISSION (OCM) |
| To: | Metzenbaum H SENATE |
| Shared Package | |
| ML20210N219 | List: |
| References | |
| CON-#486-0910, CON-#486-910 ML, OL, OL-ML, NUDOCS 8610060419 | |
| Download: ML20210N216 (1) | |
Text
OfO 9 0 - yi G-M L.
..vplT NUMBER p gg a /@l)'/_og
- ~
[na a%g UNITED STATES
- n *,U*lt.FAC _.
~
~
o
~,1, NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20$55 DQLKETEn USNHL '
p$
o, September 25, 1986
+....
~
'86 SEP 26 P3:51 c" ^ * * ^ "
GFFICE O The Fonorable Howard M. Metzenbaum 00ChE rw;, g./y * [-
%ANCe United States Senate Washington, Q, C.
20510 SERVED SEP 301986
Dear Senator Metzenbaum:
On September li 1986 you wrote to me to express support for the position urged by Governor Celeste in his letter of August 15, 1986 regarding the Davis-Besse and Perry nuclear power plants.
On September 2, I replied to Governor Celeste's letter stating that significant staff ' resources were being devoted to considering the implications of the Chernobyl accident, the recent seismic event in northeastern Ohio, and the past problems I assured him that the NRC would not authorize at Davis-Besse.
full-power operation of Perry or Davis-Besse unless and until that the public health all necessary findings had been made:
and safety will be adequately protected and that. adequate protective measures can and will be taken in the event of a My letter further assured the Governor radiological emergency.
that the NRC staff was prepared to provide whatever support the State of Ohio might desire in carrying out its review of the Perry and Davis-Besse emergency evacuation plans.
A copy of that letter is enclosed.
On September 4, 1936 the United States Court of Appeals for the Sixth Circuit issued an order barring the Commission from "any possible vote" on the Perry full power license pending further On the following day, the Commission met to order of the court.
receive a briefing from its staff and to hear presentations from At that the parties concerning the Perry full power license.
meeting, two representatives of Governor Celeste presented the views of the State to the Commission.
These views will be taken into account in any Commission decision on the Perry license at such time as the court-imposed stay is lifted.
Si cerely, })
Thomas M. Roberts Acting Chairman
Enclosure:
Letter to Governor Celeste dated September 2, 1986 D5 0 3 0610060419 86092S COMMS NRCC PDR CORRESPONDFNr.r PDR
N UNITED sTATEf* e
/
NUCLEAR REGULATORY COMMISSION g
1 waswamoron.o.c.aoses
- t.
~
September 2, 1986 casamu The Honorable Richard F. Celeste Governor.of Ohio Columbus, 04,43266-0601
Dear Governor Celeste:
I am respondf1ty to your letter of August 15, 1986 in which you urge that the Perry nuclear power plant not be licensed for full power nor Davis-Besse be permitted to achieve full power operation until the State of Ohio has carried out a review.of the adequacy of emergency evacuation plans for those two plants, and in which you withdraw your support and March implementing directive for evacuation plans for the Perry and Davis-8 esse plants pending completion of that review.
The Commission is aware of your concerns regarding the implications of the
,Chernobyl accident, the recent seismic event in northeastern Ohio, and the past problems at Davis-Besse. We are devoting significant staff resources to consideration of these important issues. 8e assured that the NRC will not authorize full power operation of these plants unless and until all necessary findings have been made: that the public health and safety will be adequately protected and that adequate protective measures can and will be taken in the event of a radiological emergency. We do intend, however, to authorize full power operation of these facilities if and when we make these findings..In this regard, the matter of full power licensing for Perry is scheduled for consideration at a Connission meeting on September 5, 1986.
The NRC Staff is prepared to provide whatever support the State of Ohio may desire in carrying out its review of the Perry and Davis-8 esse emergency evacuation plans. I have asked James Keppler, NRC Region III Administrator, to coordinate any NRC involvement you may request, and to connunicate directly with the team you have assembled. Our Staff will be prepared to address the emergency planning concerns contained in your letter when they meet with your review team.
I trust this letter is responsive to your concerns. If you have further questions regarding these matters, wit will be pleased to address them.
Cosmissioner Asselst[ine does not agree with this letter.
Sincerely, M.
x u
t.ando W. Zach Jr.
d
_ _ _. _ - _ _ - - - - -