Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217C7321999-10-0808 October 1999 Forwards Copy of Seabrook Station Videotape Entitled, Completion of Seal Barrier Installation. Videotape Documents Process of Selecting,Designing & Installing Seal Deterrent Barrier to Preclude Entrapment of Seals ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20212B5021999-09-14014 September 1999 Forwards Licensee Responses to EPA Questions Re Plant Seal Deterrent Barrier.Util Completed Installation of Subject Barriers on All Three Station Offshore Intake Structures on 990818.Barriers Will Preclude Entrapment of Seals ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations ML20211J4971999-08-21021 August 1999 Submits Comments Re Violations Cited in Early Mar & 990509 Insps ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20211H8361999-08-19019 August 1999 Submits Concerns Re Violations at Seabrook Station ML20211J1831999-08-15015 August 1999 Submits Concerns Over Serious Deficiencies at Seabrook Station That NRC Has Declined to Take Enforcement Actions Against ML20211J3241999-08-15015 August 1999 Expresses Disappointment in Apparent Failure of NRC to Cite Seabrook Station NPP for Recent Violations of Safety Regulations Uncovered During Recent Insps in Mar & May ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20211J2071999-08-13013 August 1999 Expresses Concerns Re Violations Occurring Recently at Seabrook Nuclear Power Station.Requests Effort to See That Measures Taken to Stop Flagrant,Continuing Violations That Hold Danger to Workers & Community ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210S2001999-08-12012 August 1999 Forwards NRC Forms 398 & 396 in Support of Applications for Renewal of Operator Licenses for Individuals Listed Below. Without Encls ML20210Q7441999-08-11011 August 1999 Forwards Order Approving Indirect Transfer of Control of Canal Interest in Seabrook Station Unit 1 as Requested in Application & SER ML20210R8401999-08-11011 August 1999 Forwards Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20210R9581999-08-11011 August 1999 Forwards ISI Exam Rept of Seabrook Station, for RFO 6, Period 3,for Insps Conducted Prior to & During Sixth Refueling Outage Concluded on 990510 1999-09-08
[Table view] Category:NRC TO U.S. CONGRESS
MONTHYEARML20059N6551990-09-12012 September 1990 Forwards Responses to H Myers Requests of 900719,0806,13 & 16 Re Seabrook Welds ML20059F5091990-08-17017 August 1990 Forwards Responses to H Myers 900716 Requests Re Pipe Welding Problems.Confidentiality of NRC Alleger Requested Through Restricting Access & Use to Members & Staff of Committee ML20059F4101990-08-0808 August 1990 Forwards Responses to H Myers 900713 Request Re Pipe Weld Repair ML20059F1001990-08-0202 August 1990 Forwards Responses to H Myers 900607 & 0706 Requests Re Plant Welds ML20058N4881990-07-16016 July 1990 Forwards Response to H Myers 900625 & 0703 Requests Re Plant Welds ML20058N5091990-07-16016 July 1990 Forwards Responses to H Myers 900614,19 & 26 Requests Re Plant Welds ML20058N7341990-07-0505 July 1990 Forwards Responses to H Myers 900614 & 19 Requests Re Plant Welds ML20055D0361990-06-29029 June 1990 Forwards Responses to H Myers 900607 & 08 Requests Re Plant welds.Pullman-Higgins Initiated Secondary Review of Radiographs in Response to Insp Rept 50-443/82-06 ML20055D0431990-06-26026 June 1990 Forwards Response to H Myers 900601 Request for Info Re Welds.Nrc Review of Pipe Welding & NDE Issues Did Not Specifically Address Deficiency Repts 469 & 497.Rept, Documenting NRC Review,Scheduled for Issuance in Jul 1990 ML20055D0591990-06-21021 June 1990 Forwards Response to H Meyers 900522,29 & 0606 Requests Re Plant Welds.Allegations That Deficiencies Exist Re Radiographic Record of Cooling Tower Piping Welds Unsubstantiated ML20055D0701990-06-18018 June 1990 Forwards Response to Containing a Robinson & L Bruner Comments on Facility,Including Availability of INPO Safety Repts & Unsafe & Unsatisfactory Emergency Plan ML20055D0751990-06-13013 June 1990 Responds to 900601 Request for Meeting W/Nrc During Wk of 900618 Re Plant Weld Program.Suggests Meeting Following Completion of Insp Team Insp/Assessment Rept Targeted for Issuance in Early Jul ML20055C6661990-05-23023 May 1990 Forwards Documents Re Facility QA Procedures During 1982 Through 1985 Concerning plant.W/41 Proprietary Oversize Encls.Encls Withheld ML20055C5921990-05-18018 May 1990 Forwards Responses to Requesting Details on NRC Handling of INPO Repts Re Plant.Evaluations of Plant by INPO & NRC Generally Compatible & Complementary Assessments of Plant ML20248F0321989-09-14014 September 1989 Forwards Rept of AOs at Licensed Facilities for First Calendar Quarter 1989.Plug Failure Resulted in Steam Generator Tube Leak at North Anna Unit 1 & Steam Generator Ruptured at McGuire Unit 1.W/o Encl ML20247L2401989-09-13013 September 1989 Responds to Re K Barnes Concerns Regarding Safety at Plants.Advises That to Date,Releases from Plants Remain Well within Accepted Stds ML20246M4281989-08-31031 August 1989 Responds to Statements Re Settlement Agreement Between State of Ny & Lilco Concerning Decommissioning of Plant.Nrc Directly Involved in Ensuring That Transfer of Ownership & Subsequent Decommissioning Conducted Per NRC Regulations ML20246K8571989-08-25025 August 1989 Discusses NRC Actions in Reponse to Constituent Concerns Re Excessive Overtime Worked by Employees of Plants ML20246B6591989-08-18018 August 1989 Forwards 40th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants from Apr-June 1989. Lilco Shareholders Voted to Accept Terms That Provide for Sale of Plant to State of Ny ML20246M0981989-08-11011 August 1989 Forwards Transcript of 890728 Meeting Between NRC & Lilco & Es Dennis to B Hayes Re SA White,Per H Myers Request ML20246E1941989-07-0707 July 1989 Responds to ,On Behalf of Constituent,Re Concerns W/Plant Startup.No Decision Made on Full Power License as Reviews & Hearing Process Incomplete ML20247C0111989-05-12012 May 1989 Forwards NRC Quarterly Status Rept to Congress Covering First Quarter 1989.On 890303,NRC Dismissed Shoreham Intervenors from Licensing Proceeding for Misconduct During Proceeding.W/O Encl ML20247C2081989-05-12012 May 1989 Responds to 890508 Questions Re Status of TMI Action Plan Requirements at Plant.Nrc Determined That Operation of Control Room,W/O Mods to Control Room Ventilation Sys, Adequate for Operation Up to 5% Rated Power ML20246L4851989-05-0909 May 1989 Advises That NRC Confident of Decision to Authorize Issuance of Full Power License.Issues Extensively Litigated in Licensing Proceeding.No Basis Given to Withdraw License ML20246L3271989-05-0404 May 1989 Forwards Questions & Answers Re Status of TMI Action Plan Requirements at Plant,Per 890323 Request ML20247C3541989-03-17017 March 1989 Forwards Detailed Info Re Status of Implementation of TMI Action Plan Items at Listed Plants.Small Number of Action Items Still Need Resolution ML20236D4761989-03-0909 March 1989 Forwards NRC 38th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants for Oct-Dec 1988 ML20196C3681988-12-0505 December 1988 Ack Re Plant Licensing Proceeding.Commission Discussion of License Application Not Appropriate ML20195G8521988-11-10010 November 1988 Forwards Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants for Jul-Sept 1988.Inability of Commission to Forecast Licensing Schedule for Shoreham & Seabrook Noted ML20154P3891988-09-28028 September 1988 Responds to Re Concern Over Adequacy of Evacuation Plan Prepared by Util for Plant.Public Hearing Will Be Held to Adjudicate Admitted Contentions Raised by Parties to Litigation Re Plant Graded Exercise ML20154P8561988-09-19019 September 1988 Responds to to Chairman Zech Re Concern Over Adequacy of Facility Evacuation Plan.Nrc Determination of Adequacy of Facility Offsite Plans & Preparedness Will Include Review of FEMA Findings & Graded Exercise ML20245D6531988-09-14014 September 1988 Responds to Re Requested Response to Concerns of H Nickerson Long Work Hrs for Personnel at Various Central Illinois Nuclear Generating Plants.Related Info Encl ML20245D6391988-09-12012 September 1988 Forwards Response to Mavroules Questions Re Adequacy of Plant Emergency Plan ML20245D5811988-08-22022 August 1988 Forwards 36th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants Covering Apr-June 1988.Licensing Schedule Cannot Be Realistically Forecast Due to Unresolved Emergency Preparedness Issues ML20207F9571988-08-18018 August 1988 Responds to Urging NRC to Discontinue Licensing Process for Plant.Under Administrative Procedure Act, Section 558,NRC Has Obligation to Continue Licensing Proceedings & Work to Reach Reasonable Decision ML20207G2211988-08-15015 August 1988 Responds to Requesting Response to P Birnie Re Event at LaSalle Involving Recirculation Pump. NRC Response to P Birnie Identical to Ltr Addressed to Recipient ML20207G7211988-08-10010 August 1988 Responds to Re Possible Decommissioning of Plant. Detailed Cost Estimate for Decommissioning of Plant Not Performed by Nrc.Results of Study Performed by Bnwl Encl Estimating Decommissioning Costs for Ref 1,100 Mw(E) BWR ML20245D5281988-07-19019 July 1988 Forwards Commission Responses to Questions Submitted by Congressman Mavroules for Record of 880426 Hearing,Per ML20150D3141988-07-0101 July 1988 Responds to Urging NRC to Delay Seabrook Low Power Operation Until Emergency Planning & Financial Qualification Issues Resolved ML20195E4971988-06-14014 June 1988 Responds to Re Use of Carbon Steel Piping at Plant.Nrc Examining Addl Documentation at Suppliers & Issued NRC Bulletin 88-005 Alerting of Problems W/Matls. Investigation of Falsified Test Reports Being Conducted ML20195G6681988-06-10010 June 1988 Provides Info in Response to Rl Spaulding Re Problems Associated W/Full Power Operation Authorization & Plant Shutdown.Plants Must Demonstrate Satisfactory Solutions to Issues Before Restart or Full Power Operation ML20154M9011988-05-24024 May 1988 Responds to Recipient Re Proposed Rule 10CFR50 Changes Re Emergency Planning Requirements for Fuel Loading & Initial Low Power Operations.Comment Period Extended 15 Days.Served on 880525 ML20154N3871988-05-24024 May 1988 Responds to Recipient Re Proposed Change to Proposed Rule 10CFR50 Re Emergency Planning Requirements for Fuel Loading & Initial Low Power Operations.Served on 880525 ML20154J9341988-05-19019 May 1988 Responds to Forwarding W Steele Expressing Frustration at Inability to Obtain Info Re Specific Date for Public Hearing to Render Decision on Licensing of Plant.Hearings Re State of Nh Issues Underway ML20151W5611988-04-25025 April 1988 Responds to Requesting Investigation of Drug & alcohol-related Matters at Plant.Nrc Expects Licensees to Have Vigorous fitness-for-duty Program & to Strive for Drug Free Work Site ML20148S3341988-04-11011 April 1988 Responds to 880216 Referral Re Inquiry from B Lohmiller Concerning Problems Associated W/Licensing of Plant. Lohmiller Statement That on 880203 NRC Denied Util License to Operate Incorrect.Nrc Licensing Review Continuing ML20151D3921988-04-0606 April 1988 Provides Listed Info Requested in Re Operating Nuclear Power Units Located at Twelve Sites Along Great Lakes ML20196G6371988-03-0202 March 1988 Responds to & Investigative Rept on Drug & Alcohol Abuse at Plant.Commission Believes That Existing fitness-for-duty Programs Are as Effective as Those Which Would Have Been Established by Earlier Proposal.Rept Encl ML20196G9691988-02-29029 February 1988 Forwards 34th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants for Oct-Dec 1987. Commission Unable to Forecast Licensing Schedule for Shoreham & Seabrook Because of Unresolved Issues ML20148E0961988-02-29029 February 1988 Forwards Quarterly Rept Covering Fourth Quarter of 1987,in Response to House Rept 97-850 1990-09-12
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210Q7441999-08-11011 August 1999 Forwards Order Approving Indirect Transfer of Control of Canal Interest in Seabrook Station Unit 1 as Requested in Application & SER ML20210N5721999-08-0303 August 1999 Discusses Investigations Rept 1-98-005 Conducted by OI at Naesco,Seabrook Station & Forwards NOV & Proposed Imposition of Civil Penalty - $55,000.Violation Re Failure to Promptly Correct Incorrectly Terminated Cables of Control Bldg Air ML20210P3361999-08-0303 August 1999 Discusses Investigation Rept 1-98-005 Conducted by Region I OI at Naesco,Seabrook Station & Forwards Nov.Violations Re Electrical Wiring in Control Panel for Control Bldg Air Conditioning Sys ML20210J8421999-08-0303 August 1999 Forwards Order,Conforming Amend & SER in Response to Application Transmitted by Util Under Cover Ltr , & Suppl by Ltrs & 0407 Requesting Approval of Transfer of License NPF-86 ML20210P3161999-08-0303 August 1999 Discusses Investigation Rept 1-98-005,conducted Between 980129 & 0527 at Seabrook Station & Forwards Nov.Violation Re Discrimination of Williams Power Corp,Contractor of Naesco,Against Electrician for Raising Safety Issues ML20210K4911999-07-28028 July 1999 Responds to to Chairman Jackson Requesting Info on Concerns Raised by Constitutent a Menninger,Re Seabrook Nuclear Power Station Y2K Readiness IR 05000443/19990041999-07-26026 July 1999 Forwards Insp Rept 50-443/99-04 on 990510-0620.No Violations Noted.Emergency Preparedness Program Reviewed & Found to Be Acceptable ML20209G4711999-07-14014 July 1999 Informs That Unredacted Version of Supplemental Commercial & Financial Data for Baycorp Holdings,Ltd,Submitted in 990407 Application & Affidavit,Marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20196J7011999-06-30030 June 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20209A6701999-06-25025 June 1999 Informs That NRC Ofc of NRR Reorganized Effective 990528.As Part of Organization,Div of Licensing Project Mgt Was Created.Organization Chart Encl IR 05000443/19990021999-06-21021 June 1999 Forwards Insp Rept 50-443/99-02 on 990321-0509.Violation Re Failure to Ensure That Critical Relay Calibr Characteristics Were Met Prior to Installation Was Identified ML20196G8421999-06-21021 June 1999 Forwards Copy of Notice of Consideration of Approval of Application Re Proposed Corporate Merger & Opportunity for Hearing Re 990315 Application Filed by Nepco ML20196J4451999-06-18018 June 1999 Ack Receipt of ,Following Up on .In Ltr of April 5,EJ Markey Highlighted Issue of EDG Reliability in Light of Recent Discovery of Defective AR Relays at Seabrook NPP in New Hampshire ML20212J2651999-06-17017 June 1999 Informs That Unredacted Version of Updated Financial Data for Baycorp Holdings,Ltd Will Be Withheld from Public Disclosure & Marked as Confidential Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act ML20212H6661999-06-15015 June 1999 Forwards RAI Re 990315 Application Request for Approval of Proposed Indirect Transfer of Seabrook Station,Unit 1 License & Proposed Indirect Transfer of Millstone,Unit 3 License to Extent Held by Nepco ML20207B2221999-05-20020 May 1999 Forwards Insp Rept 50-443/99-03 on 990308-0408.Violations Identified & Being Treated as non-cited Violations ML20206K1811999-05-0707 May 1999 Responds to Re Event Notification from North Atlantic Energy Service Co Indicating That One of Seabrook Two EDG May Have Been Inoperable Since June 1997. NRC Insp of Problem Not Yet Completed ML20206N6811999-04-23023 April 1999 Ack Receipt of ,Re Potential Inoperability of Two Emergency Diesel Generators Since June 1997 at Seabrook Nuclear Power Station.Issue Under Ongoing Insp & Review by NRC ML20205R1171999-04-20020 April 1999 Ack Receipt of Ltr Requesting Action Under 10CFR2.206 Re Enforcement Action Against Individuals Alleged to Have Unlawfully Discriminated Against Contract Electrician. Request to Attend Enforcement Conference Denied.Frn Encl ML20206B3451999-04-20020 April 1999 Forwards Insp Rept 50-443/99-01 on 990207-0321.Violations Identified Involving Failure to Properly Test Primary Auxiliary Building for Test Failures & Inadequate C/A to Prevent Recurrence of Repeated Pab for Test Failures ML20205P1871999-04-0909 April 1999 Discusses 990225 PPR & Forwards Plant Issues Matrix & Insp Plan.Advises of Planned Insp Effort Resulting from Plant PPR Review ML20205N4991999-04-0808 April 1999 Responds to Requesting Copy of OI Rept 1-1998-005,or in Alternative Summary of Investigation Rept. Request for Copy of Investigation Rept,Denied at This Time, Because NRC Did Not Make Final Enforcement Decision ML20205C1891999-03-24024 March 1999 Refers to Naesco 981030 Request for Approval of Alternative Inservice Exam to That Specified by ASME BPV Code,Section XI,1983 edition/1983 Summer Addenda.Forwards SE Supporting Proposed Relief Request IR-8,Rev 1 ML20204E4191999-03-16016 March 1999 Informs of Results of Investigation Conducted at Seabrook Nuclear Generating Station by NRC OI & Requests Participation at Predecisional Enforcement Conference in King of Prussia,Pa Relative to Investigation 1-98-005 ML20210U2281999-03-16016 March 1999 Refers to Apparent Violation of NRC Requirements Prohibiting Deliberate Misconduct by Individuals & Discrimination by Employers Against Employees Who Engage in Protected Activities,Investigation Rept 1-98-005 ML20204F3101999-03-16016 March 1999 Discusses Investigation Conducted at Plant by OI Field Ofc, Region 1.Purpose of Investigation to Determine Whether Certain Activities Conducted Per NRC Requirements.Synopsis of IO Investigation Rept 1-98-005 Encl ML20207C2991999-02-26026 February 1999 Forwards Insp Rept 50-443/98-11 on 981228-990207.No Violations Noted.Inspectors Identified Several C/A Program Deficiencies Involving Timeliness of Reviews & Effectiveness of Previous C/As 1999-09-30
[Table view] |
Text
8 Nk
[ ~' '7, UNITED STATES NUCLEAR REGULATORY COMMISSION h* j WASHINGTON, D. C. 20555 e
- .** February 29, 1988 CHAIRMAN The Honorable John B. Breaux, Chairnan Subcomittee er. Nuclear Regulation Comittee on Environment and Public Works United States Senate Washington, D.C. 20510
Dear Mr. Chaiman:
I am enclosing NRC's 34th quarterly status report on energency preparedness for nuclear pcwer plants covering the period October 1 to December 31, 1987.
The report has been coordinated with the Federal Emergency Management Agency.
The Comission is unable to realistically forecast the licensing schedule for Shoreham and Seabrook because of the energency preparedness issues that remain
~
unresolved.
Table 1 notes minor revisions that have occurred in other operating license review schedule dates since our last report to Congress. None of these revi-sions is projected to result in any delays in the licensing process.
Please notify us if you want additional information.
Sincerely, N- s /1.
Lando W. Zech Jr. ( l
Enclosure:
i NRC Quarterly Status Report !
I cc: The Honorable Alan K. Simpson i
l l
J SLO'8100cy/}ng
i l
l b.7.,
NRC QUARTERLY STATUS REPORT TO CONGRESS ON EMERGENCY PREPAREDNESS October 1, 1987 to December 31, 1987 The 34th NRC status report to Congress on emergency preparedness for nuclear power plants covers the period October 1 to December 31, 1987.
Tables 1 and 2 of this report provide the status of offsite and onsite emergency planning, respectively, for applicants for an operating license.
Cmunission decision dates are consistent with those reported to the House Committee on Appropriations, Subcconittee on Energy and Water Development.
l l
l f
w -- w - - - - - -
December 31, 1987 Table 1 Status of Offsite Emergency Preparedness Operating License Reviews Date of Potential Estimated FEMA Offsi3eEP FEMA Finding Delay Start of 4 Comissign Facility Finding 1 Needed (Months) Hearings Decision South Texas C C 0 C 2/88*
Watts Bar C C 0 None .
Comanche Peak C C 0 C .
6 6 6 Seabrook C* .
C .
Shoreham Total Potential Offsite Emergency Preparedness Delay: -6, 7
- Change from previous report.
. Not scheduled.
Notes:
1 C = complete; i.e., FEMA Findings have been provided. Where a date is given in parentheses, supplemental infonnation to FEMA Findings previously provided is expected on that date. FEMA Findings on offsite emergency preparedness are not required to issue a license authorizing fuel loading and operation up to 5 percent of rated power.
C = complete; i.e., FEMA Findings have been provided. Where a date is given, it is the date by which the FEMA Findings must be provided to meet the proposed Comission Decision date.
3The delay is caused by offsite emergency preparedness issues. This delay is in addition to angr' delays estimated in the report to the House Appropriations Subcomittee on Energy and Water Development.
4 C = complete; i.e., a hearing has started.
SC = com)lete; dates are consistent with those reported to the House Appropria-tions Su)comittee on Energy and Water Development. For plants for which construction is complete, the dates shown are for full-power licensing. For the other plants, the dates are those by which the NRC needs the information to act on authorization for fuel loading and low-power operations.
6New Hampshire formally submitted energency plans to FEMA in December 1985; the latest revision (Revision 2) was submitted in September 1986. On December 12, 1986, FEMA forwarded its report on Revision 2 of the New Hampshire State and
l V Table 1 (Continued) local plans to the State. On June 4, 1987, FEMA provided its position on outstanding contentions in the proceeding which included a determination that reasonable assurance of adequate protective actions did not currently exist for the Seabrook beach population. Hearings on the New Hampshire plans began on October 5, 1987. Activities regarding the emergency response plans for Massachusetts are on the critical path for licensing. On September 20, 1986, the Governor of Massachusetts announced that he will not submit emergency plans for that part of the emergency planning zone (EPZ) in Massachusetts because he does not believe adequate protective measures can be developed for that area.
On October 17, 1986, Seabrook was issued a license to load fuel and conduct precriticality testing. On January 4,1987, the Comission stayed the issuance of a low-power license. On April 9,1987, the Comission stated that, pending further Comission review, a low-power license cannot be issued until an offsite emergency plan is submitted. On September 18, 1987, the licensee submitted a utility offsite plan for Massachusetts and, on September 21, requested that the Comission lif t its stay of tne low-power license. On November 25, 1987, the Comission lifted the stay on the issuance of a low-power license. The Licensing Board, in an order issued on December 2,1987, stated that it would make a determination whether it is appropriate for the Board to reauthorize low-power operations prior to the completion of the remand proceeding on non-emergency preparedness issues. On February 3, 1988, the Appeal Board remanded the issue of the public alert and notification system in Massachusetts to the Licensing Board for further proceedings. (The !
Massachusetts towns in the EPZ are in the process of removin0 the emergency notification sirenstofollowing)a statutory authority do so. Oncourt decision October that 29, 1987, theitComission is withinapproved their ,
a final rule clarifying the requirements and standards for the evaluation of a utility emergency plan in the absence of state and local participation.
The NRC has forwarded the utility offsite emergency plan for Massachusetts to FEMA for review. A schedule is being developea by NRC and FEMA for review of the plan, exercise of the offsite plan for Massachusetts, and litigation of the plan. The time needed for resnlution of offsite emergency planning issues will delay issuance of a full-power license. Until the schedule is firmly developed, the length of the delay cannot be estimated. !
7 0n August 26, 1985, the Licensing Board for emergency planning for Shoreham issued a concluding partial initial decision finding that because of LILC0's inability to implement its offsite emergency response plan and because the l State and county refused to cooperate, a full-power license may not be issued for Shoreham. On October 18, 1985, the Appeal Board upheld the Licensing Board's decision that LILCO does not have the legal authority to implement its offsite emergency plan. On July 24, 1986, the Commission ordered further hearings on the "realism" and "materiality" arguments, presuming that the State and county would actually participate in a real emergency. These hearings have not been scheduled as yet. On June 11, 1987, the Comission decided to reopen the record On on the 6, November agreement with a radic station to broadcast emergency information.
1987, the Conuission upheld the Appeal Board's remand of the evacuation plans for hospitals in the EPZ and reversed the Appeal Board's remand of two contentions regarding the expansion of the EPZ. Hearings on exercise-related contentions and on the adequacy of the relocation centers concluded on
Table 1 (Continued) June 18, 1987 and July 30, 1987, respectively. On December 7, 1987, the Licensing Board issued a Partial Initial Decision which stated that the exercise did not meet the requirements of a full participation exercise because ,
of the failure to test certain functions. On February 1, 1988, the same !
Licensing Board issued an Initial Decision finding that the exercise demonstrated the existence of several fundamental flaws in the LILC0 Plan. On January 22, 1988, the utility submitted a revised emergency plan for Shoreham, and NRC has forwarded the revised plan to FEMA for review. A schedule is being developed by NRC and FEMA for the review, exercise, and litigation of the revised plan. The time needed for resolution of offsite emergency planning issues will delay issuance of a full power license. Until the schedule is firmly developed, the length of the delay cannot be estimated with any assurance of accuracy, but a preliminary estimate of the schedule for a Licensing Board decision is Spring 1989.
t l
e
i t
'c
- December 31, 1987 Table 2 Status of Onsite Emergency Preparedness Operating License Reviews States Within Onsite 1 2 Comissign Facility 10-Mile EPZ Appraisal Exercise Decision South Texas TX C C 2/88*
Watts Bar TN C C .
Comanche Peak TX C C .
4 Seabrook NH, MA C 5
Shoreham NY C C .
- Change from previous report to Congress.
. Not scheduled.
Notes:
I C = complete; starting date for 2-week onsite emergency preparedness appraisal.
C = complete; full-participation exercise of applicant, State, and supporting i local government to demonstrate preparedness.
3 C = complete; dates are consistent with those reported to the House Appropria-tions Subcomittee on Energy and Water Development.
4 Exercise of applicant's onsite and offsite plans for New Hampshire only; a remedial exercise is to be scheduled, and an exercise of the offsite plans for Massachusetts will be necessary.
5 Exercise of applicant's onsite and offsite plans.
.