ML20099L608
| ML20099L608 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 11/15/1984 |
| From: | Foster D GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| GN-442, NUDOCS 8412030010 | |
| Download: ML20099L608 (1) | |
Text
.
Georga Power Company Route 2. Box 299A Waynesboro. Georgia 30830 Telephone 404 554-9961. Ext 3360 I
404 724 8114. Eat 3360
> 4 ?,,
l b
'21 r> f : I 6 Georgia 4)ower
- o. o,ost.,
eP s t and Project yn the sovrnem electoc system g
vogt:e erwect November 15, 1984 United States Nuclear Regulatory Commission
- Office of Inspection and Enforcement File:
X7BG03-M68 Region II - Suite 2900 Log:
GN-442 101 Marietta Street, Northwest Atlanta, Georgia 30323
Reference:
Vogtle Electric Generating Plant-Units 1 and 2, 50-424, 50-425; Radius on Coped Structural Members Attention: Mr. James P. O'Reilly On October 19, 1984, Mr. C. W. Hayes of the Georgia Power Company notified Mr. John Rogge of the USNRC of the item referenced above.
A detailed inspection has been initiated to be followed by an engineering evaluation.
At this time, Georgia Power Company can not forecast an expected completion date for the evaluation.
An interim report will be submitted on or about January 25, 1984, that will forecast a final completion date.
This response contains no proprietary information and may be placed in the NRC Public Document Room.
Your traly D.h.Fostr REF/DOF/tdm xc:
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 R. J. Kelly J. A. Bailey G. Bockhold R. E. Conway O. Batum P. D. Rice G. F. Head H. H. Gregory C. S. McCall (OPC)
J. T. Beckham W. T. Nickerson E. L. Blake, Jr.
R. A. Thomas D. R. Altman (Shaw, et. al.)
D. E. Dutton D. L. Kinnsch (BPC)
J. E. Joiner
- + =
W. F. Sanders (NRC)
J. L. Vota (W)
(Troutman, et. al.)
R. H. Pinson L. T. Gucwa D. C. Teper (GANE)
- 8. M. Guthrie C. E. Belflower L. Fowler (LEAF)
E. D. Groover M. Malcom (BPC)
T. Johnson (ECPG)
OFFICIAL COPY pMi!88Pe!!)h gioz oa S
U