Monthly Operating Rept for Nov 1983
ML20086G806
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/30/1983
From: Mcnamara A, Snow B
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC
References
NUDOCS 8401120411
Download: ML20086G806 (6)


Text

.

O

.I- ,

OPERATING DATA REPORT DOCKET NO. 50-244 DATE December 7, 1983 COMPLETED BY 8, M &m - ~

Andrew E. McNamara TELEPilONE OPERATING STATUS ca. -avi

1. Unit Name: GINNA STATION. UNIT #1 Notes The reactor power level
2. Reporting Period: November. 1983 was maintained at 100% for the 1520 majority of the report month,
3. Licensed Thermal Power (Mit):

490 with two exceptions detailed

4. Nameplate Rating (Gross MTe):

470 On pages 3 and 4.

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 0

~ 7. Maximum Dependable Capacity (Net MTe):

8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Thich Restricted, If Any (Net )ffe):
10. Reasons For Restrictions, If Any:

This Month Yr.-t o-Da te Cumulative

11. Ilours In Reporting Period 720.00 8.016.00 122.832.00
12. Number of flours Reactor Tas Critical 720.00 5,969.83 92,855.98 0 0 1,631.32*
13. Reactor Reserve Shutdown Ilours 720.00 5,787.50 90,767.63
14. Ilours Generator On-Line 0 0 8.5*
15. Unit Reserve Shutdown flours 1,088,808 8,553,487 125.,136,041
16. Gross Thermal Energy Generated (MTil) 362,900 2,824,061 40,790,858
17. Gross Electrical Energy Generated (Mili) 345,498 2,684,702 38,670,764
18. Net Electrical Energy Generated (MTil) 100.00% 72.20} 73.90 %
19. Unit Service Factor 100.00 I* 72.20'* 73.90 %
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net) 102.10% 71.26 5 68.78 %

102.10% 71.26 % 68.78 %

22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0% 0.80% 8.08 %
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

March 3, 1984: Approximately 65 days durntion

25. If Shur Down At End Of Report. Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
  • Cummulative Total commencing January 1, 1975 ,

8401120411 831130 PDR ADOCK 05000244 R PDR

+

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-244 UNIT #1, Ginna Station DATE December 7, 1983 COMPLETED BY __( w h y 8. h1 h Andrew E. McNambra TELEPHONE 1 (315) 524-4446 Ext. 301 at Ginna MONTH November, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

1. 481 17. 481 ,_
2. 481 18. 482
3. 481 19. 481
4. 482 20. 482
5. 481 21. 481
6. 482 22. 482
7. 481 23. 482 G. 480 24. 432
9. 481 25. 482
10. 481 26. 481
11. 481 27. 481
12. 481 28. 483
13. 443* 29. 480
14. 480 30. 480 l
15. 483 31. ---
16. 482
  • Reflects reduction to approximately 67% reactor power level to effect a weld repair on a test plug on the 2B Reheater test line.

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

DOC.KET NO.90-344 . ,

UNIT NAME 81 Gia"* C'i "

1983 -

UNIT SHUTDOWN AND POWER REDUCTIONS COMPLETED DATEdjlf*$*"7T liY '

p" M-N6-- "%

Andrew E. McNamara REPORT MONTII November. 1983 TEl.EPilONE (~815) 524-4446 ext. 301 m

" c

,o ?

N e

  • =5

.c = Licensee e, e

    • Cause & Corrective No. Da te F

{ g}

d5 Jj T. .n e Event Report # 2.g Ad [ .3

                                                                                         !u Action to Prevent Recurrence 2     g                               u O

PR* 11/13/83 F 5.5 A N/A N/A IU PIPEXX Power level reduction to approximatel r 67% to effect a weld repair on a test plug on the 2B Reheater test line. I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data ll-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Antomatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161) E-Operator Training & License Examination F-Administrative

  • 5 G-Operational Error (Explain) w co-e. mev. insi ll-Other (Expicin)
  • Power Reduction Exhibit 1 - Same Source
  • l
           =

NARRATIrg

SUMMARY

OP OPERATING EXPERIENCE DOOKET NO. 59-244 UNIT Ginna Station, Unit #1 DATE _Dr ,qmber 7, 1983 COMPLETED BY M f. h ; andrew E. McNamhra TELEPHONE 1 (315) 524-4446 j EXT. 301 at Ginna l l

                                                                                                 \

MONTH November, 1983 , 1 l l The reactor power level was maintained at the 100% level for the ' majority of the report month with the following two minor exceptions: . On 11/13 the reactor power level was reduced to approximately 67% to effect a weld repair on a test plug on the 2B Reheater test line. l On 11/17 the reactor power level was reduced to approximately 96% to perform periodic test PT-16, Auxiliary Feedwater System. l l

r- - i .

        ,           = *
 <. -og Page.5 GINNA STATION Maintenance Report-Summary November, 1983 During-the month of November, routine inspections and maintenance
                      -were completed. Safety-related maintenance included:
1) IB sSafety Inj ection Pump -- outboard hearing oil cooler flush and oil change.
2) Inspection of CV-4010, " B" Auxiliary Feedwater Pump Discharge Check Valve.
                                                                                                                         ~
3) .' Repacking of.:the'lC Charging' Pump.
4) Replacement of the Transmitter amplifier on the 1A Reactor
                           --Coolant Pump fl Seal Leakoff Flow Indicator.
                      -5)   Replace'a radiator hose on the Diesel Fire Pump Engine.
6) Completion of major preventive maintenance on the "A" Service Water Pump.

4 4 I' i 4 i

   .                                                               $.lY{ffh~ h                    (0         '

mpa Id[f jis7 bxAllra + pY ' "" l.

                                                                                       'l
                                                                                                   .x n=ic 4

ROCHESTER GAS AND ELECTRIC CORPORATION

  • 89 EAST AVENUE, ROCHESTER, N.Y.14649  ?

TE L E PHON E

                                                                     .ata caos vis 546 2700 GINNA STATION December 7, 1983 Director, Office of Management Information and Program Analysis U.S. NUCLEAR REGUIATORY COMMISSION                     '

Washington, DC 20555

Subject:

Monthly Report for November, 1983 Operating Status Information R. E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of November, 1983 Very truly yours, flLU.4 Bruce A. Snow Plant Superintendent BAS /clb Attachments cc: Dr. Thomas E. Murley NRC (1) t