Monthly Operating Repts for Sept 1983
ML20081M518
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 09/30/1983
From: Grant N, Pace P, Williams J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PNS-LI-83-668, NUDOCS 8311170289
Download: ML20081M518 (18)


Text

--

c: .

., 'Ie 3 AVEllAGE DAILY UNIT POWER LEVEL i- ,

DOCKET NO. 50-250

  1. - UNIT _ Turkey Point Unit 3 DATE 10-15-83 COMPLETED t!Y N. W. Grant TELEP110NE 305/552-3675 .

l MONm September 1983 .

DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL IMh e-Net) -(MWe-Net t .

I 666 659 37 2 674 18 .

664 .

670

3 19 668 4 665 20 AA7 5 663 663 21 6 661 22 663 7

000' 659 23 r g 669 .

667; 9 666 25 674

~

to 665 26 681

-11 241 27 681 303 ~

12 28 682 13 656 679 29

, 14 662 676 3o is 664 3, 16 660 ,

INSTRUCTIONS On this formai list the average daily unit power lesel in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/771 h" 0 0 h b

.. 1 l

OPERATING DATA REPORT DOCKET NO. 5.0-250 DATE 10-15-83_

COMPLETED BY TELEPHONE . 0LI Grant 5/552-3675 OPERATING STATUS

1. Unit Name:

Turkey Point Unit #3 Notes

2. Reporting Period: SeDtember 1983 Unit #3 operated at essential -
3. Licensed Thermal Power (MWt):

2200 ly full power except. as noted in the Unit Shutdowns and

4. Nameplate Rating (Gross MWe): 760 693 Power Reductions Report.

5.' Design Electrical Rating (Net MWe):

6. Maximum Dependable Capacity (Gross MWe): 700
7. Maximum Dependable Capacity (Net MWe): 666
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted,lf Any (Net MWe):
10. Reasons For Restrictions.If Any:

This Month Yr to-Date Cimm!ative i1; Hours In Reporting Period 720 6.551 94,856.6

12. Number Of Hours Reactor Was Critical 699.3 6.483.0 66,283.3-
13. Reactor Reserve Shutdown Hours 0 ~0

'844'4 .

14. Hours Generator On.Line 695.1 6,394.1 65,899.2 0 0 121.8
15. Unit Reserve Shutdown Qours
16. Gross Thermal Energy Generated (MWH) 1,531,474 14,029,987 135,447,899 -
17. Gross Electrical Energy Generated (MWH) 485,425 _, _

4,536,090 43.198.080

18. Net Electrical Energy Generated (MWH)- 461.605 4,321,616 40.909.168 .
19. Unit Service Factor 96.5 97.6 69.5
20. Unit Availability Factor 96.5 97.6 69.6
21. Unit Capacity Factor (Using MDC Net) 96.3 100.6 66.7
22. Unit Capacity Factor (Using DER Net) 92.5 95.2 62.2
23. Unit Forced Outage Rate 3.5 2.0 _

5.4

24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

Da fnol i nn , netnhor 1_ 14R3. 2 months

25. If Shut Down At End Of Report Period. Estimated Date of Startup-
26. Units in Test Status (Pric r ta Commercial Operation): Forecast Achined INITIAL CRITICALITY ,_ _

INITIAL ELECTRICITY _

COMMERCIAL OPERATION _

07/77)

~ . _ _ _ _ _ _ - _ _ _ _ . , - _ - - - . - - - -

~

50-250 UNIT S!!UTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME "urkey Point Unit 3 DATE 20-15-83 -

COMPLETED BY N. kl. Grant REPORT MONTH SeDtember 1983 TELEPHONE 305/552-3675 .

w.

. = -

C

.I _e re

=

3 to g .s x" Licensee 5 *.

6" c Cause & Corrective No. Daie g 3g g ,3 5 Event u '2 13 Action to

$3 $ tN G '

j di j Report a Prevent Recurrence 6

9 830911 F 24.9 A 1 250-83-15 EG HEATER Unit removed from service for repairs -

to heat tracing circuits.

er i

a

I 2 3 4 F Forced Reason
Method: Exhibit G Instructions S. Scheduled A Lyuipment Failure (Explain) l Manual for Preparation of Data 11 Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C. Refueling 3. Automatic Scram. Event Reporn (LER) File (NUREG-I D Regulatory Restriction 9-Other (Explain) 0161) li-Operator Training & License Examination F-Administrative 9, ,

, 5 G Operational Error (Fxplain) ,y _ /.o ao sov<.,. .c/ Exhibit ! - Same Source (9/77) Il-Other (E xplain) l

_ _ _ _ _ _ _ _ _ = _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - - - _

SUMMARY

OF OPERATING EXPERIENCE t2 DOCKET NO. 50-250 Ub!IT Turkey Point 3 DATE October 17, 1983 COMPLETED BY P. L. Pace TELEPHONE 305/552-3654 REPORT MONTH September 1983 Unit 3 operated at essentially full power except for a brief outage as discussed in the Unit Shutdowns and Power Reductions Report.

Major safety related maintenance activities included:

Two boric acid heat tracing circuits were repaired.

Two charging pumps were overhauled.

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are

' continuing. Refer to correspondence between FPL and NRC for additional information.

i

~

t I

l 9

AVER AGE DAILY UNIT POWER LEVEL g.

,D'OCKET NO. 50-251

}

  • - UNIT Turkey Point Unit 4 DATE 10-15-83 COMPLETED BY N~. W. Gradt TELEPflONE 305/552-367.5 i

September 1983 .

MONTH .

DAY AVERACE D ! P WER LEVEL ,

DAY AVER AGE DAILY POWER LEVEL

-(MWe-Net) ,

I 684 632 ,-

37 2 678 gg _ ,

670 3 675 ,,

e 675 '

669 672 '

4 20 0 671 5 2j 6 665 22 671 7

669 667 23 671

-c g ~

674 24 .

669 684 9 25 669 688 to 26

-.11 671 685 27 667 686 12 28 13 669 29 685 667 684

, 14 3o

is 668-31 4 16 669 ~ .

i INSTRUCTIONS On this formai. list the average daily unit liower lesel in MWe-Net for each day in the reporting m.mth. Compute to the nearest whole megawatt.

(9/77)

I l

l e

1- ,

v OPERATING DATA REPORT

. DOCKET NO. 50-251 DATE 10-15-83 COMPLETED BY N.W. Grant TELEPif0NE 305/552-3675 OPERATING STATUS

1. Unit Name:

ey Mnt Unh M Notes

2. Reporting Period:

September 1WJ Unit #4 operated at essential

3. Licensed Thermal Power (MWt):

2 00 DM PNen

4. Nameplate Rating (Gross MWe): 760
5. Design Electrical Rating (Nes MWe): 693
6. Maximum Dependable Capacity (Gross MWe): 700
7. Maximum Dependable Capacity (Net MWe):

666

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons:
9. Power Level To Which Restricted If Any (Net MWe):
10. Reasons For Restrictions. If Any: _

This Month Yr to-Date Cmnulative 1It Hours In Reporting Period 720 6,551 88,584-

12. Number Of Hours Reector Was Critical 720.0 2,957.0 62.812.3 0 0 *166:6
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 720.0 2,763.8 60,659.8 0 0 31.2
15. Unit Reserve Shutdown Qours 1,586,389 5,867,645 127,785,889
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 508,121 ,_, 1,861,270 40,636,782 484,140 1,759,106 38,484,279 i 18. Net Electrical Energy Generated (MWH).

l 19. Unit Service Factor 100- 42.2 68.5

20. Unit Availability Factor 100 42.2 68.5
21. Unit Capacity Factor (Using MDC Net) 101.0 41.0 6/.2
22. Unit Capacity Factor (Using DER Net) 97.0 38.7 62.7
23. Unit Forced Outage Rate n 5.5 4.0
24. Shutdowns 5;cheduled Over Next 6 Months (Type. Date.and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup-
26. Units in Test Status (Prior to Commercial Operation): Forecast Achined l

l lNITIA L CRITICALITY l INITIA L ELECTRICITY _ _ , , , . _

COsisieRCiAt OeERATiON _

l ('J/77 )

~

UNIT S!!UTDOWNS AND POWER REDUCTIONS DOCKETNO.60-251 UNIT NAME "urkey Point 4

  • DATE 20-15-83 REPORT MONni September 1983 COMPLETED BY N.W. Grant TELEPHONE (305/552-3675 .

No "h Licensee n

, .5 ? .Y ,E g o Cause & Corrective L. Date i 3g j .3 s 5 Event g? Action to g'3 H

$2 $ e~o ig =!

Report a mU U

e Prevent Recurrence C

There were no shutdowns or significan'

< power reductions below 80 percent of the average daily power level.

t 4

i 1

1 2 3 4 F Forced Reason: Method: Exhibit G -Instructions S. Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data Il-Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C-Refueling 1-Automatic Scram. Event Repos:(LER) File (NUREG-D. Regulatory Restriction 9-Other (Explain) 01611 E-Operator Training & License Examination

, F AJministrative 9, ,

5 G-Operational lir rur ( E splain ) 4_ to o M ou<.i..d Exhibit I Same Source 19/77) Il Other (Explain)

SUF61ARY OF OPERATING Z<PERIENCE O

DOCKET NO. .50-251 -_

UliIT. _ Turkey Point 4 '

DATE October 17, 1983 COMPLETED BY P. L. Pace TELEPHONE 305/552-3654

. REPORT 'liONTH _

Seotember 1983 p Unit 4 operated at power with no outages or significant power reductions.

fiajor safety related mai.1.tenance activities included:

Two charging pumps were overhaulcf..

A steam generator level instrument power supply was replaced.

Inspections and requirements of IE. Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company comnitments to NUREG-0737 implementation are continuing. Refer to correspor.dence between FPL and NRC for additional information.

i l

b'

~

AVEltAGE DAILY UNIT POWER LEVEL t

DOCKET NO. 50-335 unir St. Lucie Unit 1 DATE 10-15-83 COMPLETED BY N. W. Grant TELEPilONE 305/552-3675 September 1983 MONE .

DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) .(MWe Net) 1 37 ...

2 gg ___

3 19 4 20 ---

~~~

5 21

~~

7 23

~~

~~

8 24 9

10 26

.gg p 12 28

~~ #"

13 -

29

~~~

14 30 ,

-~~

15 33

.. ~

INSTRUCTIONS On this iu; nat.!ist the aver. ige daily unit power lesel in MWe-Nei for each day ist the reporting inonth. Compute to the nearest whole inegawait.

(9/77)

-n.. -_

_-----,.,e - -, ,. _ - ,

v.

OPERATING DATA REPORT DOCKET NO. 50-335 .

DATE 10-15-83 COMPLETED BY N.W. Grant TELEPliONE 1n6/R57-1675 OPERATING STATUS

1. Unit Name:

St. Lucie Unit #1 ,

Notes

2. Reporting Period: Se9tember 1983 Unit #1 Remained out of 2700 service for refueling and
3. Licened Thennal Power (MWt): scheduled maintenance.

uvu

4. Namepiste Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

830 867

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

822

8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted,If Any (Net MWe): ,
10. Reasons For Restrictions,If Any:

This Month Yr to.Date Cumulative 720 6,551 59,399 iIt Hours In Reporting Period

- 12. Number Of Hours Reactor Was Critical 0 1,366.9 44.466.I 0 0

  • 205.3
13. Resetor Reserve Shutdown Hours
14. Hours Generator On-Line 0 1.350.9 43.576.2 0 0 39.3
15. Unit Reserve Shutdown l{ours 108,667,938
16. Gross Thermal Energy Generated (MWif) 0 3,352,422 .
17. Gross Electrical Energy Generated (MWH) 0 ,_, 1,160,280 35,373,875

- 3,254 1,079,451 33,'343,642

18. Net Electrical Energy Generated (MWH)'
19. Unit Service Factor 0 20.6 73.4
20. Unit Availability Factor 0 20.6 73.4
21. Unit Capacity Factor (Using MDC Net) 0 20.1 71.3 0 19.9 69.4
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0 1.1 4.6
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup: Jan-Feb 1984
26. Units in Test Statum (Prior to Commercial Operation): Forecast Achined INITIA L CRITICALITY _ , _

INITIAL ELECTRICITY , _ _ __ _ _

COMMERCIAL OPER ATION _

(9/771

- 4 UNITSIIUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-335 UNIT NAME 5t. Lucie al -

DATE 10-15-83 .

REPORT MONTH September 1983 C6;'FLETED BY N W. Grant TELEPHONE 305/552-3675 >

e.

- E c

%. Date c-5, p EE 3 yYi Licensee gg h Cause & Conce nre S

4 255 Event uT o? Action to j@ $ 3

< ijij g Report

  • NC !0 Prevent Recurrence
u .

o 3 830226 S 720 C 4 RC FUELXX Unit I remained out of service for refueling and scheduled maintenance.

l 2 3 4 F Forced Reason: Method:

S ScheduleJ Exhibit G . Instructions A Lquipment Failure (Explain) I Manual for Preparation of Data B-Maintenance or Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D Regula ory Restriction 9-Other (Explain) 0161) 1.-Operator Training & License Examination

. F Administrative Y ~~ O ' *"' ""' 5 G-Operati. mat lirror (F uplain) g 4 ,a o a sewe ,..,# Exhibit I . Same Source 19/77) 11-Oiher iExplain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-335 UNIT St. Lucie Unit'l DATE October 17, 1983 COMPLETED BY P. L. Pace TELEPIIONE 305/552-3654 REPORT tiONTH September 1983 St. Lucie Unit i remained out of service for a refueling and maintenance outage.

Major safety related maintenance included:

Several heat tracing circuits were repaired or replaced.

A low pressure safety injection control valve was repaired.

. Inspections and requirements of IE Bulletin and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges to PORV or safety valves during the report month.

See correspondence between FPL and NRC for information concerning the thermal shield.

e, l

b- .

AVER AGE DAILY UNIT POWER LEVEL DOCKETNO. 50-389 UNIT St. Lucie Unit 2 DATE 10-15-83 COMPLETED BY - N. W. Grant

- 5 TELEPilONE MONTH September 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAlt.Y POWER LEVEL (MWe Net) -(MWe-Net )

, 576 ,7 68 2 ---

ig 159 3 19 168 4

20 239 5

364 2

6 22 562 7

23 369 8

-~~

722 24 9

25 745 to 26 749 748

I 27 12 28 707 13

~~~

29 702 751 14 ---

30 I5 4 3, _

16 89 _

INSTRUCTIONS On this format. list the aseuge daily unit power lesel in MWe-Nei for each day in the reporting month. Compute o the nearest whole megawatt.

(9/77) e- -- - - , - - ~ - , . - ,.n-- ,-- e- -r,, - - - - -- , - , -

OPERATING DATA REPORT DOCKETNO. 50-389 DATE 1.0-15-83 COMPLETED llY N.W. Grant TELEPHONE 3Q5/s52-3675 OPERATING STATUS

1. Unit Name: St. Lucie Unit #3 Notes September 1983 Unit 2 operated at power
2. Reporting Period:

2560 except as indicated in the

3. Licensed Thermal Power (MW:): Unit Shutdowns and Power 850
4. Nameplate Rating (Gross MWe): Reducdon RepoM.
5. Design Electrial Rating (Net MWe): 804 832
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe): 786
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions.lf Any:

This Month Yr to Date

  • Cumulative
  • 11; Hours in Reporting Period 720 1,296 1,296
12. Number Of Hours Reactor Was Critical 448.7 1,024.7 1.024.7
13. Reactor Reserve Shutdown Hours 0 0 '

O

14. Hours Generator On.Line 354.9 930.9 930.9 0 0 0
15. Unit Reserve Shutdown f(ours
16. Gross Thermal Energy Generated (MWif) 646,373 2,119,533 2,119,533 .
17. Gross Electrical Energy Generated (MWH) 202,790 ,_, 694,780 694,780
18. Net Electrical Energy Generated (MWH),

181,733 648,013 ~648,013

19. Unit Service Factor 49.3 71.8 71.8
20. Unit Availability Factor 49.3 71.8 71.8
21. Unit Capacity Factor (Using MDC Net) 32.1 63.6 63.6
22. Unit Capacity Factor (Using DER Net) 31.4 60.2 60.2
23. Unit Forced Outage Rate 50.7 28.2 28.2
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forecast Achined INITIA L CRITICALITY ._.

IN.~ IIA L El.ECTRICil Y ._

COMMERCIAL OPERATION

  • These columns contain data from the date of commercial operation only.

(9/77 )

-~ -- a m- - -. ~ - - - - -

DOCKET NO. 50-389 -

UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT NAME St. Lucie 2 10-15-83 ' -

DATE QEPORT MONTH September 1983 COMPLETED BY N. W. Grant TELEPHONE 305/552-3675 .

, 3

, .$? Yk Licensee 5% h. Cause & Corrective L. Date g 3g  ; ,3 g & Event

(? ') O3 Action to

$5 E jgg Report a mO , Prevent Recurrence 6

1* 830901 F 321.4 H 3 CH PUMPXX Loss of a main feed pump while per-forming a ground isolation resulted in a reactor trip. Outage extended due to secondary chemistry problems.

2 830915 F 15.7 H 1 CH XXXXXX Unit removed from service due to high secondary system conductivity.

3 830916 F 7.6 H 1 CH XXXXXX Unit removed from service due to high secondary system conductivity. Unit returned to service at approximately 30% power.

4 830916 F 11.1 G 3 HA TURBIN Reactor tripped following turbine trip due to left open bleed off valve .

Unit returned to service at 30% due to chemistry problems in secondary.

7 I 2 3 4 f Forced Reason: Method: Exhibit G . Instructions S Scheduled A-Lyuipment Failure (Explain) 1. Manual for Preparation of Data B. Maintenance or Test 2 Manual Scrarn. Entry Sheet 2 for Licer ee C Refueling 3 Automatic Scram. Event Report (LE R) Fde (NUREG.

D Regulatory Restriction 9-Other (Explain) 0161) 1.-Operator Training & License Examination

, F Administrative 5 G-Operational Error (F splain) 4- _ to a 44evea..et Exhibit I Same Source P8/77) Il-Ot her (Explain)

  • Sequential numbers restarted with commercial operation.

I UNIT S!!UTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-389 UNIT NAME St. Lucie Z ,

DATE 10-15-83 September 1983 COMPLEED BY N _ W. Grant REPORT MONDI TELEPHONE 106/R 0-3675 .

I e.

- E c

, .33 3 yY~ Licensee ,E% . Cause & Corrective

%. Date g 3g i jj5 Event g? $"3 g Action to H

$E E jg Repori = mV g' Prevent Recurrence c

5 830917 F 0.0 H 5 CH XXXXXX Unit operated at 70% power due i.o secondary system chemistry problems.

6 830919 F 0.0 H 5 CH XXXXXX Unit operated at reduced power due to condensate pump' suction strainer .

clogging and secondary system chemistry problems until 9-23-83.

7 830923 F 9.3 G 3 HA TURBIN Reactor tripped due to a turbine trip while performing a turbine trip test.

8 830924 F 0.0 A 5 CH HTEXCH Unit operated at approximately 96%

due to a feedwater heater being out of service.

I 2 3 4 f: Forced Reason: Method:

S. Scheduled Exhibit G-Instructions A Lyuipment Failure (Explain) I-Manual for Preparation of Data n Maintenance of Test 2 Manual Scram. Entry Sheets for Liecasee C Refueling 3-Automatic Scram. Event Report tLER) File (NUREG-D Regulatory Restriction 9-Other (Explain) 01611 E-Operator Training & License Examination

, F Administrative p ,

5 G Operational Error (F splain) 4- _ to o atove ..et Exhibit I Same Source 19/77) Il Other (Explain)

,, +.

SUMMARY

OF OPERATING EXPERIENCE l

DOCKET NO. 50-389 F

UNIT St. Lucie Unit 2 DATE 0ctober 17, 1983 COMPLETED BY P. L. Pace TELEPIIONE 305/552-3654 REPORT MONTH September 1983 See the Unit Shutdowns and Power Reductions report for details on unit outages.

Major safety related maintenance included:

A reactor coolant pump seal assembly was repaired.

Electrical circuits in diesel generator turbo charger, a. diesel generator governor motor, static inverter, and a motor control center were repaired.

A 4160 BUS tie breaker circuit was repaired.

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC Cor additional information.

In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to PORV or safety valves during the report month.

=

4 l-

7 *u FLORIDA POWER & LIGHT COMPANY October 17, 1983 PNS-LI-83-668 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

Attached are the September 1983 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. 1 and 2.

Very trul yours,

'hlbs J. W. Williams, Jr.

Vice President Nuclear Energy Department JWW/NWG/js -