ML20078A541

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Control Rod Drive Sys Clamps. Final Rept Will Be Submitted on 831028 as Discussed During 830829 Telcon
ML20078A541
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/01/1983
From: Manno S
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, 10CFR50.55E, 7304, NUDOCS 8309230316
Download: ML20078A541 (1)


Text

M Y NIAGARA R UMOHAWK NIAGARA MoH4WK POWER CORPORATION /300 ERIE BOULEVARD WEST, SYRACUSE, N.Y.13202/ TELEPHONE (315) 474-1511 SAMUEL F. MANNO NCt. EAR ONSTRUCTION e er 1, MM Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Comission Region I Division of Project and Resident Programs 631 Park Avenue King of Prussia, PA 19406 I

Re: Nine Mile Point Unit 2 Docket No. 50-410

Dear Mr. Starostecki:

As discussed in the August 29, 1983 telecon between Mr. T. Loomis (Niagara Mohawk Licensing) and Mr. R. Gallo (NRC Region I), the final report in accordance with 10CFR50.55(e) concerning Control Rod Drive System Clamps will be submitted on October 28, 1983, rather than August 29, 1983.

incerel ,

.f.

Q/

f anilo SFM/TRL:djm xc: R. Gri an (NRC Resident Inspector) l l

/

8309230316 830901 DR ADOCK 05000 /f'

{

'