ML20214T392
| ML20214T392 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 09/12/1986 |
| From: | Mangan C, Mangan E NIAGARA MOHAWK POWER CORP. |
| To: | Kane W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| (55(E)86--19), (55(E)86-00-19), NMP2L-0876, NMP2L-876, NMP2L.876, NUDOCS 8609300281 | |
| Download: ML20214T392 (2) | |
Text
'
.o}-
CQ(
% -00 19 Y NIAGARA NUMOHAWK NONE MILE POINT-UNIT 2/P.O. BOX 63, LYCOMING, NY 13093/ TELEPHONE (315) 343-2110 September 12, 1986 NMP2L 0876 Mr. W. Kane, Director U. S. Nuclear Regulatory Commission Region I Division of Reactor Projects 631 Park Avenue King of Prussia, PA 19406 RE: Nine Mile Point - Unit 2 Docket No. 50-410
Dear Mr. Kane:
Enclosed is an interim report, in accordance with 10CFR50.55(e), for the problem concerning MSIV 2 MSS *HYV78.
This problem was reported via tel-con to J. Linville of your staff on August 15, 1986.
Very truly yours,
[AA f
C. V. Manga Senior Vice President CVM/cla xc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 W. A. Cook, NRC Senior Resident Inspector NMPC Project File 8609300281 860912 PDR ADOCK 05000410 S
PDR f
36: 27
'/I
...y-.
i NIAGARA M0 HAWK-POWER CORPORATION NINE MILE POINT - UNIT 2 DOCKET.NO. 50-410 Interim Report for a Problem Concerning MSIV 2 MSS *HYV78 Failure to Unlatch and Close Within Required Time (55(e)86-00-19)
Description of the Problem After setting all critical latching dimensions on the Main Steam Isolation Valve (MSIV) 2 MSS *HYV78, the valve failed to unlatch and 4
close within the 3 to 5 seconds required by design.
The matter is still under investigation, and'a final report will be submitted by October 20, 1986.
1 3.
W 6
2 4