Interim Deficiency Rept (55(e)86-00-19) Re Failure of MSIV 2MSS*HYV7B to Unlatch & Close within 3-5 as Required by Design.Initially Reported on 860815.Matter Under Investigation.Final Rept Will Be Submitted by 861020
ML20214T392
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/12/1986
From: Mangan C, Mangan E
NIAGARA MOHAWK POWER CORP.
To: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
(55(E)86--19), (55(E)86-00-19), NMP2L-0876, NMP2L-876, NMP2L.876, NUDOCS 8609300281
Download: ML20214T392 (2)


Text

'

.o}-

CQ(

% -00 19 Y NIAGARA NUMOHAWK NONE MILE POINT-UNIT 2/P.O. BOX 63, LYCOMING, NY 13093/ TELEPHONE (315) 343-2110 September 12, 1986 NMP2L 0876 Mr. W. Kane, Director U. S. Nuclear Regulatory Commission Region I Division of Reactor Projects 631 Park Avenue King of Prussia, PA 19406 RE: Nine Mile Point - Unit 2 Docket No. 50-410

Dear Mr. Kane:

Enclosed is an interim report, in accordance with 10CFR50.55(e), for the problem concerning MSIV 2 MSS *HYV78.

This problem was reported via tel-con to J. Linville of your staff on August 15, 1986.

Very truly yours,

[AA f

C. V. Manga Senior Vice President CVM/cla xc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 W. A. Cook, NRC Senior Resident Inspector NMPC Project File 8609300281 860912 PDR ADOCK 05000410 S

PDR f

36: 27

'/I

...y-.

i NIAGARA M0 HAWK-POWER CORPORATION NINE MILE POINT - UNIT 2 DOCKET.NO. 50-410 Interim Report for a Problem Concerning MSIV 2 MSS *HYV78 Failure to Unlatch and Close Within Required Time (55(e)86-00-19)

Description of the Problem After setting all critical latching dimensions on the Main Steam Isolation Valve (MSIV) 2 MSS *HYV78, the valve failed to unlatch and 4

close within the 3 to 5 seconds required by design.

The matter is still under investigation, and'a final report will be submitted by October 20, 1986.

1 3.

W 6

2 4

y I...

- -.-- -