.. AVERAGE DAILY UNITPOWER LEVEL
, DOCKET NO. 50-250
'- UNIT Turkey Point 3 _
June 15,1983 DATF.
COMPLETED itY ' P. L. Pace TELEPilONE (305)S52-3654 .
MONTH 11ay 1983 .
DAY AVERAGE DAILY POWER LEVEL ~
DAY AVERACE DAILY POWER LEVEL (MWe Net) -(MWe-Neti ,.-
t 693 676 37 689 671 2 ,3 ,
~
643 674 -
3 39 ,
4 670 680 .,
20 604 681 S
6 625 22 676 686 g 681 7
c 689 674 -
8 24 ,
9 688 672 25 686 668 10 11 An? 27 669 12 638 670 28 682 667 13 9 684 670 .
14 - 30 15 682 674 33 16 679 I
INSTRUCTIONS i
On this format.hst the aserage daily unit t ower lesel in MWe Nei for ea:-h d.sy in the reporting in.inth. Compute to the nearest whole megawart.
, (9/77) 8307220329 830615 '
PDR ADOCK 05000250 R PDR . 67_) d
/
lfl-. .
. .o OPERATING DATA REPORT DOCKET NO. 50-250 DATE June 15.1983 COMPLETED BY P. L. Pace TELEPHONE (3ns y s"-3654 OPERATING STATUS Turkov Point 3 N"8*5
- 1. Unit Name:
May 1983 Unit 3 operated at essentially
- 2. Reporting Period:
2200 full power except for two 760 brief outages, see the Unit 3.Nameplate
- 4. Licensed RatingThermal (Gross MWe) Power (MWr)l.
Shutdowns and Power Reduction.i
- 5. Design Electrical Rating (Net MWe): 693 1,eport.
700
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
666
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:
Items 6 and 7 increased 5/25/83 to reflect increased capability associated with secondary side improvements.
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
,1 This Month Yr..to-Date Cumulative 744 3,623 91,928.'6 i1. Ilours In Reporting Period
- 12. Number Of flours Reactor Was Critical 729.9 3,575.7 64,376.0 0 0 844.4
- 13. Reactor Reserve Shutdown flours
~
- 14. Ilours Generator On Line 725.1 3,491.0 62,996.1 0 0 121.8
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1,588,610 7,662,335 129,080,2471
- 17. Gross Electrical Energy Generated (MWH) 512,440 _ 2,514,880 41,176,870 487,912 2,397,594 38,985,146
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 97.5 96.4 68.5
- 20. Unit Availability Factor 97.5 96.4 68.7
- 21. Unit Capacity Factor (Using MDC Net) 100.8 102.3 65.6 94.6 95.5 61.2
- 22. Unit Capacity Factor (Using DER Net)
.3 3.0 5.6
- 23. Unit Forced Outage Itate
- 24. Shutdowns Scheduled Over Nest 6 Months (Type. Date.and Duration of Eacht: ;
Refuelinn. October 1983, 2 months
- 25. If Shut Down At Eml Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICA LITY INITIA L ILECTRICITY CO\lMEltCI \L OPER ATION ' '
(9/77)
N. _. _
d) i .
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO, 50-250 UNIT NAME Turkov Point 3 DATE June 15. 1983 COMPLETED BY P- T. Pnce REPORT MONTH May 1983 TELEPHONE (305)552-3654 w.
C r3 g
"~~ ~5 E s j Licensee ,E n, )*o Cause & Corrective N"- Dd ' '-
I 2E 9 .E 3 a: Event ,
u? E. ? Action to 5 NC C 5E j di j Report Prevent Recurrence 6
6 830505 S 17.1 B 1 ZZ ZZZZZZ Unit taken off line to conduct safeguards test for Turkey Point Unit 4.
7 830511 F 1.9 A 3 PA XXXXXX Reactor trip caused by loss of instrument air dryer during maintenance. Unit returned to service ,
3 i
1 2 3 4 F. Forced Reason: Method: Exhibit G Instructions S. Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG.
D Regulatory Restriction 9-Other (Explain) 0161)
E-Operator Training & License Examination F Administrative p ,
5 G Operational Error (Explain) m c _ /.o as 44s,ve.n.ri Exhibit 1 Same Source (9/77) !!Oiher (Explain)
SUrH4ARY OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turkey Point 3 DATg June 15,1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT !!OMTH May 1983 Unit 3 operated at essentially full power for the entire month except for the brief outages discussed in the unit shutdowns report.
t!ajor safety related maintenance activities included:
An excore instrumentation source range drawer power supply was replaced.
A primary water make-up pump impeller was replaced.
A primary water make-up control valve solenoid was replaced.
A primary water make-u'p check valve was replaced. 3 A feedwater c'ontrol valve was replaced. .
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and flRC for additional information.
O e
t
AVERAGE DAILY UNIT POWER LF. VEL s-
, DOCKET No. 50-251 UNIT Turkev Point _ _4 DA1E June 15,1983 L. Pace COMPLETED llY -P.
. TELEPilONE (305) 552-3654 .
i MONTH .
DAY ,
AVERACE IL P ER LEVEL ,
DAY AVERAGE DAILY POWER LEVEL
-(MWe-Net) '
--- 83 .-
1 Ie 3
- 154 18 -
3 g9 312 4 20
-- 557 S 21 6 667 22
- 679 7 23 665 ?-
s g 9
--- 630 25
~~~
10 26 11
~
27 534 12
-- 665 28 676 13 29 14 079 30 IS M
3j 16 . .
INSTRUCTIONS On this fonnat. list the aver. ige daily unit power lesel in MWe-Net for each day in the reporting m.inth. Compute to the nearest whole imgawatt.
(9/77) t
OPERATING DATA REPORT DOCKET NO. 50-251 DATE June 15,1983 COMPLETED BY P. L. Pace TELEPHONE (ansiss?-3654 OPERATING STATUS Turkey Point 4 Notes
- 1. Unit N.ime:
- 2. Reporting Period: May 1983 Unit 4 completed the Steam
- 3. Licenw.! Ibermal Power (MWt): 2200
- Generator Repair Project
- 4. Namepide Rating (Grow MWe): 760
- 5. Design Electrical Hating (Net MWe): 693
- 6. Maximum Dependable Capacity (Gross MWe): 700
- 7. Nasimma liependable Capacity (Net MWe): 666-
- 8. If Ch.mg* Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
Trems 6 and 7 increased 5/25/83 to reflect increased capability associated.
- 9. Power Level To Which Restricted.If Any (Net MWe):
- 10. Reasons For Restrictions,If Any:
This Month Yr.-to-Dat e Cumdative 744 3,623 85,656-
- 11. Ilours In Iteportin4Period
- 12. Number Of flours Reactor Was Critical 393.8 393.8 60,249.1
- 13. Reactor Reserve Shutdown flours 0 0 166.6
- 14. Hours Generator On.Line 350.7 350.7 58,246.7 0 0 31.2
- 15. Unit Reserve Shutdown 1(ours
- 16. Gross Thermal Energy Generated (MWH) 652.752 652.752 122,570,996 204,025 _, 204,025 38,979,537
- 17. Gross Electrical Energy Generated (MWH) 189.250 189,250 y .9'14.423
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 47.1 9.7 68.0
- 20. Unit Availability Factor 47.1- 9.7 68.0
- 21. Unit Capacity Factor (Using MDC Net) 39.1 8.1 *66.7
- 22. Unit Capacity Factor (Using DER Net) 36.7 7.5 .62.2 ._
- 23. Unit Forced Outage Rate. 4.9^ 4.9 3.8 1 ._
- 24. Shutdowns Schedided Over Next 6 Months (Type.Date,and Duration of Each):
I 5..-
l
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved ,
INITIAL CRITICA LITY
( INITIAL ELECTillCITY CO%1M ERCI A L OPER AIlON ,
i (9/77) l N.,
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50 251 ~
UNIT NAME Turkey Point 4 -
DATE June 15,1983 May 1983 COMPLETED By P- L Pace REPORT MONTH TELEPHONE (1051552-1654
-, .{ g 3 )Yh Licensee ,E-r, h, Cause & Corrective
%.. Date r-5g i .s s 5 Event .
p E? Action to
- 3, s jgg Report : mo j0 Prevent Recurrence 6
18 '
821009 S 374.6 H 4 HB HTEXCH Steam Generator Repair Program completed. Unit returned to service.
1 830516 F 6.0 A 3 CH VALVEX Reactor trip caused by high level in steam generator. Returned to service 2 830517 F 6.2 H 1 IA TURBIN Unit removed from service following turbine runback. Returned to service 3 830517 S 0.0 B 5 HA TURBIN Turbine soak following outage prior to full power operation.
4 830517 S .5 B NA NA TURBIN Unit removed from service for turbine
' overspeed test.
5 830517 F 0.0 H 5 HB HTEXCH Power reduced in accordance with secondary chemistry control guide-lines.
6 830519 F 0.0 H 5 HB HTEXCH Power reduced in accordance with secondary chemistry guidelines 7 830526 F 6.1 A 1 HA TURBIN Unit removed from service due to high temperatures in main turbine.
- Returned to service at reduced power 1 until condition cleared.
I 2 3 4 F: Forced Reason: Method: Exhibit G Instructions S. Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatie Scram. Event Report tLER) File (NUREG.
D-Regulatory Restriction $0ther(Explain) 0161)
E Operator Training & License Examination F-Administrative p ,
5 G Operational Error (Explain) 9 c Aoao 424cw.v..d Exhibit I Same Source to/77) li-Other ( E xplain) 1
z_
SUI"41ARY OF OPERATING EXPERIENCE .
't /
DOCKET HO. 50-251 ._
UNIT Turkey'?oint 4
, .c DATE June.15, 1983 -r COMPLETED BY P. L. Pace .s y
TELEPHONE (305) 552-3654 REPORT !!ONTH May 1983 .
Unit 4 returned to. operation following the Steam Generator Repair Program.
See the Unit Shutdowns Report .for details on outages during the month. -
Other major safety related maintenance activities.inIluded: .
Boric acid heat tracing was adjusted or repaired., -
~ . .
A containment spray pump was overhauled. 'z y -
A high pressure safety injection pressure transmitter' was repiaced.
A spent fuel pool emergency pump was repaired. 4 s Two excore instrumentation source detectors were replaced. ,
A reactor coolant pump switch was replaced.
s '
A CRDM annunciator was replaced.
Inspections and requirements of IE Bulletins and t!UREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional in-formation. _ , ,
.(-
- 3
%' %=.
w g d
a t
- , . , - ~ ..,.,, .-- , . . - - . . , _ _ -, ._. _ _ . . _ _ . . , _ _ . -
/ t
-) .
AVEllAGE DAILY UNIT POWER LEVEL .
50-335 9
'. . DOCKET NO.
UNIT St. Lucie 1 DATE June 15. 1983 COMPLETED itY '
TELEPilONE -(305)S52-3654' .
I MONTil liay 1983 .
DAY AVERAGE D IL WER LEVEL DAY AVER AGE DAILY POWER LEVEL
-(MWe-Net ) ,.
1 37 2 --
g3 ,
-~
l-- 3 19 4 - 20 5 21 6 32 7 23 '
's -- ---
3 24 ,
9
~~-
10 --
26
.Il 37 l' 28 13 29 14- 30
. IS 3g 1 16 I .
v, . .
. INSTRUCTIONS On this format list the average daily unit power lesel in MWe Net for each day in the reporting month. Compute to
- , the nearest v, bole rmgawatt.
p e
'i , (9/77)
I f
1 I ,
\
) p
) \ , ;
\ >
- ~
OPERATISG DATA REPORT
, (' DOCKET NO. 50-335 1 '
DATE _.inna 1L_1983 COMPLETED BY P T- Pace TELEPilONE (305)552-3654 4
OPERATING STATUS
^
St. Lucie 1 Notes
- 1. Unit Name:
. thy 1983
- 2. Reporting Perioil: Unit remained out of service 2700 <' for refueling and scheduled
- 3. Licenad Thermal Power (MWt).
- 4. Nameplate Rating (Gross MWe): 0* '
maintenance". ,
S. Design Electrical Rating (Net MWeb 830 867
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
822 ,,,,,
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report Give Reasons:
Ittms 6 and 7 increased on 5/25/83 based on a review of unit performanen and statistical revicu of circulating water temperatures.
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
3 .,
This Month Yr to Date Cumulatise 11; Hours In Reporting Period
'744 3,623 56,471 0 1.366.9 44.466.1
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown llours _
0 0' '
205.3~
- 14. Ilours Generator On Line 0 1,350.9 43,576.2
' 15. Unit Reserve Shutdown Hours 0 0 39.3 O 3,532,422 108,667.938 .
/'~ 16. Gross Thermal Energy Generated (MWH) 1,160,280 35,373,875
- 17. Gross Electrical Energy Generated (MWH) R..
-2232 1,092,117 33,356,306
- 18. Net Electrical Energy Generated (MWH)*
- 19. Unit Service Factor O 37.3 77.2
- 20. Unit Availability Factor 0 37.3 77.2
- 21. Unit Capacity Factor (Using MDC Net)
~
0 36.9* 75.2*
- 22. Unit Capacity Factor (Using UER Net) 0 36.3 73.l*
0 1.1 - 4.6
- 23. Unit Forced Ov;tatte Rate
- 24. Shutdowns Sclieduled Over Next 6 Months (Type. Date.and Duration of Eacht:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: September 1983
- 26. Units in Test St.itm (Prior to Commerci.d Operation): Forecast Act ieud ,
INITIA L CRITICALITY INillAL ELECTRICITY COMMEltCI AL OPER ATION _
- weighted average capacity factors (9/77i
~
DOCKET NO. 50-335 UNIT SilUTDOWNS AND POWER REDUCilONS St- Lucie 1 ,.'
UNIT NAME DATE June 15, 1953 COMPLETED gy P. L. Pace May 1983 REPORT MONTil TELEPHONE (305)552-3654
~. ~
- E
.] g 3 j Ey Licensee [g h Cause & Correcti've Action to
%. Date 5= 5 .5 s E Event n ? c3
$ Repint = mO Present Recurrente H
f: 5
< 5 :t u!'
6 3 ~ 830226 S 744 C 4 RC FUELXX Unit I remained out af service for refueling and scheduled maintenance.
l 1
. 1 1
1 I 2 3 4 F: Forced Reason: Method: Exhibit G Instructions S. Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee l C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG- l D-Regulatory Restriction 90ther(Explain) 0161)
E-Operator Training & License Examination F Administrative Y ~ 0 * ** *'"" 5 G-Operational Erner IExplain) c . /.o a a ass,w.w.c/ Exhibit I- Same Source PJ/77) Il-Ot her ( E xplain)
SUMMARY
OF OPERATING E7.PERIENCE DOCKET NO. 50-335 UN.IT St. Lucie Unit 1 DATE June 15, 1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT ttONTII flay 1983 St. Lucie Unit 1 remained out of service for a refueling and maint' nance e
outage.
Major safety related maintenance included:
Boric acid heat tracing was replaced.
A containment spray control valve actuator solenoid was replaced.
The hydrogen analyzer was installed.
. See correspondence between FPL and flRC for information concerning the thermal shield ,9 Inspections arid requirements of IE Bulletins and flVREG-0737 are continuing.
Florida Power & Light Company commitments for flVREG-0737 implementation are continuing. Refer to correspondence between FPL and tiRC for additional information.
In accordance with requirements of flVREG-0737 Item II.K.3.3, there were no challenges to PORV or safety valves during the report month. .
O O
I
_ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ . _ . _ _ _ _ . _ _ . _ .. J
AVER AGE DAILY UNIT POWER LEVEL .
50-389
, DOCKET NO.
'~
UNIT St. Lucie 2 DA1E . June _15. 1983 COMPLETED ltY P. L. Pace TELEPilONE
-(305)S52-3654* .
MONDI Pfny 1983
- i DAY DAY AVER AGE DAILY POWER LEVEL
, AVER AGE DAILY POWER LEVEL.
IM WN'll -
-(MWe-Net ) , .
I l.e 2 gg .
3 19
-- ~~
4 20 5 33 6 22 y '
. g- _: ---
8 --
24 .
9
~~
10 26
.g g i 23 13 29
--- ~~
14 30
,3 16 .
INSTRUC110NS On this format. Int the aserge daily unit power leyl in MWe-Nei for each day in the reporting inonth. Compute io the !)e3re$t whtde f*Wg.tWall.
. (47h I
_ . - ._n,.. -.--n.,. .e--,-n--- n , ,7- ~ -y- ..., , u,, - ~ , - - - , . - - , . .- -n-- --- , , n,
OPERATING DATA REPORT DOCKET NO. 50-389 DATE June 15, 1983 COMPLETED BY P. L. Pace TELEPHONE (305)S52-3654 OPEllATING STATUS St. Lucie Unit 2 Note $
- 1. Unit Name:
- 2. Reporting Period: II^Y 1903 Conducted preoperational
- 57. of 2560 testing.
- 3. Licenwd t hermal Power (MWI):
850
- 4. Nameplate Rating (Gros: MWe):
- 5. Desip Ilectrical Rating (Net MWe): approxiraately 805
- 6. Maximion Dependable Capacity (Gross MWe): to be deter:ninet t be determinet
- 7. Maximn.a liependable Capacity (Net MWe);
- 8. If Ch:mps Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power I.eiel To Which Restricted. If Any (Net MWe): approximately 33
- 10. Reasons l or Restrictions,1f Any: _ License condition - plant in startup phase.
This Month Yr..to-Da te Cumulative 744 i1. Ilours In Iteporting Period 0
- 12. Nnmber Of floun Reactor Was Critical
- 13. Reactor iteserve Shutdown llours 0
- 14. Ilours Generator On.Line 0
- 15. Unit Rewrve Shutdown l{ours
- 16. Gross Thermal Energy Generated (MWH) 0
- 17. Gross Electrical Energy Generated (MWH) 0 , _ ,
- 18. Net Electrical Energy Generated (MWH) _
0 NA
- 19. Unit Service Factor
- 20. Unit Availability Factor NA ._
- 21. Unit Capacity Factor (Using MDC Net) NA
- 22. Unit Capacity F.rctor (Using DER Net) NA .
0
- 23. Unit Forced Onta-e Rate _
- 24. ShutdownsSc! minted Over Next 6 MonthsIType.Date.and Duration of Each):
~
- 25. If Shur Down As End Ofiteport Period. Estimated Date of Startup:
- 26. Units in rest Statu+(Prior to Commercial Operation): Forecast Achiesed ,
5/27/83 6/2/83 INITIA L CIllTIC31.lTY INITIAL IiLECTRICITY June 1983 6/13/83 COMMERCIAL OPER ATION bate July N (9/77I N
UNIT SIIUTDOWNS AND POWER REDUCTIGNS DOCKET NO. 0-389 ,
i UNIT NAME St- Tnete ? -
DATE June 15. 1983 COMPLETED BY P. L. Pace REPORTMONTil May 1983 TELEPHONE (335) 552-3654 w.
5 *D 0
's C
5E
'9 .
b!'C"5CC 5'u 5*
go y"- 9 C 5 22:d Cause & Corrective 2s 9 .a s cc Event . 27 93 Action to 53 E j5j Repori e NG jL Prevent Recurrence 6
NA ' 830406 NA NA B NA NA NA NA Unit 2 conducted preoperational testing.
i i 2 3 4 f: Forced Reason: Method: Exhibit G -Instructions j S. Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data i B-Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-i D-Regulatory Restriction g-Other (Explain) 0161)
E. Operator Training & License Examination
' F-Administrative ,
5 i G-Operational Error (Explain) i c _ /.o ao e?.4cw.,..cd Exhibit I- Same Source 4 ('l/77) 11-01he r (E xplain)
.. l
- ' SUIGIARY OF OPERTsTIMG EXPERIEMCE DOCYET HO. 50-389 UNIT St. Lucie Unit 2 DATE June 15,1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT tt0 NTH tiay 1983 Unit 2 continued preoperational testing.
Inspections and requirements of IE Bulletins and t1UREG-0737 are continuing.
Florida Power & Light Company comitments for flVREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
In accordance with requirements of NUREG-0737 Item II.K.3.3., there were no challenges to PORV or safety valves during the report month.
h 1
7.. e* .
FLORIDA POWER & LIGHT COMPANY l
June 15,1983 PNS-LI-83-417/1 Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Sir:
Attached are the May 1983 Operating Status Reports and Operating Suninary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit Nos. I and 2.
Very truly yours, MM iji).. W Williams, Jr.
/ Vice ) resident i Nuclear Energy JWW/PLP/js Attachment l