ML20077A457

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for May 1983
ML20077A457
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 06/15/1983
From: Pace P, Williams J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PNS-II-83-417-1, PNS-LI-83-417-1, NUDOCS 8307220329
Download: ML20077A457 (17)


Text

.

.. AVERAGE DAILY UNITPOWER LEVEL

, DOCKET NO. 50-250

'- UNIT Turkey Point 3 _

June 15,1983 DATF.

COMPLETED itY ' P. L. Pace TELEPilONE (305)S52-3654 .

MONTH 11ay 1983 .

DAY AVERAGE DAILY POWER LEVEL ~

DAY AVERACE DAILY POWER LEVEL (MWe Net) -(MWe-Neti ,.-

t 693 676 37 689 671 2 ,3 ,

~

643 674 -

3 39 ,

4 670 680 .,

20 604 681 S

6 625 22 676 686 g 681 7

c 689 674 -

8 24 ,

9 688 672 25 686 668 10 11 An? 27 669 12 638 670 28 682 667 13 9 684 670 .

14 - 30 15 682 674 33 16 679 I

INSTRUCTIONS i

On this format.hst the aserage daily unit t ower lesel in MWe Nei for ea:-h d.sy in the reporting in.inth. Compute to the nearest whole megawart.

, (9/77) 8307220329 830615 '

PDR ADOCK 05000250 R PDR . 67_) d

/

lfl-. .

. .o OPERATING DATA REPORT DOCKET NO. 50-250 DATE June 15.1983 COMPLETED BY P. L. Pace TELEPHONE (3ns y s"-3654 OPERATING STATUS Turkov Point 3 N"8*5

1. Unit Name:

May 1983 Unit 3 operated at essentially

2. Reporting Period:

2200 full power except for two 760 brief outages, see the Unit 3.Nameplate

4. Licensed RatingThermal (Gross MWe) Power (MWr)l.

Shutdowns and Power Reduction.i

5. Design Electrical Rating (Net MWe): 693 1,eport.

700

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

666

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:

Items 6 and 7 increased 5/25/83 to reflect increased capability associated with secondary side improvements.

9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions,if Any:

,1 This Month Yr..to-Date Cumulative 744 3,623 91,928.'6 i1. Ilours In Reporting Period

12. Number Of flours Reactor Was Critical 729.9 3,575.7 64,376.0 0 0 844.4
13. Reactor Reserve Shutdown flours

~

14. Ilours Generator On Line 725.1 3,491.0 62,996.1 0 0 121.8
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1,588,610 7,662,335 129,080,2471
17. Gross Electrical Energy Generated (MWH) 512,440 _ 2,514,880 41,176,870 487,912 2,397,594 38,985,146
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 97.5 96.4 68.5
20. Unit Availability Factor 97.5 96.4 68.7
21. Unit Capacity Factor (Using MDC Net) 100.8 102.3 65.6 94.6 95.5 61.2
22. Unit Capacity Factor (Using DER Net)

.3 3.0 5.6

23. Unit Forced Outage Itate
24. Shutdowns Scheduled Over Nest 6 Months (Type. Date.and Duration of Eacht:  ;

Refuelinn. October 1983, 2 months

25. If Shut Down At Eml Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICA LITY INITIA L ILECTRICITY CO\lMEltCI \L OPER ATION ' '

(9/77)

N. _. _

d) i .

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO, 50-250 UNIT NAME Turkov Point 3 DATE June 15. 1983 COMPLETED BY P- T. Pnce REPORT MONTH May 1983 TELEPHONE (305)552-3654 w.

C r3 g

"~~ ~5 E s j Licensee ,E n, )*o Cause & Corrective N"- Dd ' '-

I 2E 9 .E 3 a: Event ,

u? E. ? Action to 5 NC C 5E j di j Report Prevent Recurrence 6

6 830505 S 17.1 B 1 ZZ ZZZZZZ Unit taken off line to conduct safeguards test for Turkey Point Unit 4.

7 830511 F 1.9 A 3 PA XXXXXX Reactor trip caused by loss of instrument air dryer during maintenance. Unit returned to service ,

3 i

1 2 3 4 F. Forced Reason: Method: Exhibit G Instructions S. Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG.

D Regulatory Restriction 9-Other (Explain) 0161)

E-Operator Training & License Examination F Administrative p ,

5 G Operational Error (Explain) m c _ /.o as 44s,ve.n.ri Exhibit 1 Same Source (9/77)  !!Oiher (Explain)

SUrH4ARY OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turkey Point 3 DATg June 15,1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT !!OMTH May 1983 Unit 3 operated at essentially full power for the entire month except for the brief outages discussed in the unit shutdowns report.

t!ajor safety related maintenance activities included:

An excore instrumentation source range drawer power supply was replaced.

A primary water make-up pump impeller was replaced.

A primary water make-up control valve solenoid was replaced.

A primary water make-u'p check valve was replaced. 3 A feedwater c'ontrol valve was replaced. .

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and flRC for additional information.

O e

t

AVERAGE DAILY UNIT POWER LF. VEL s-

, DOCKET No. 50-251 UNIT Turkev Point _ _4 DA1E June 15,1983 L. Pace COMPLETED llY -P.

. TELEPilONE (305) 552-3654 .

i MONTH .

DAY ,

AVERACE IL P ER LEVEL ,

DAY AVERAGE DAILY POWER LEVEL

-(MWe-Net) '

--- 83 .-

1 Ie 3

- 154 18 -

3 g9 312 4 20

-- 557 S 21 6 667 22

- 679 7 23 665  ?-

s g 9

--- 630 25

~~~

10 26 11

~

27 534 12

-- 665 28 676 13 29 14 079 30 IS M

3j 16 . .

INSTRUCTIONS On this fonnat. list the aver. ige daily unit power lesel in MWe-Net for each day in the reporting m.inth. Compute to the nearest whole imgawatt.

(9/77) t

OPERATING DATA REPORT DOCKET NO. 50-251 DATE June 15,1983 COMPLETED BY P. L. Pace TELEPHONE (ansiss?-3654 OPERATING STATUS Turkey Point 4 Notes

1. Unit N.ime:
2. Reporting Period: May 1983 Unit 4 completed the Steam
3. Licenw.! Ibermal Power (MWt): 2200
  • Generator Repair Project
4. Namepide Rating (Grow MWe): 760
5. Design Electrical Hating (Net MWe): 693
6. Maximum Dependable Capacity (Gross MWe): 700
7. Nasimma liependable Capacity (Net MWe): 666-
8. If Ch.mg* Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

Trems 6 and 7 increased 5/25/83 to reflect increased capability associated.

9. Power Level To Which Restricted.If Any (Net MWe):
10. Reasons For Restrictions,If Any:

This Month Yr.-to-Dat e Cumdative 744 3,623 85,656-

11. Ilours In Iteportin4Period
12. Number Of flours Reactor Was Critical 393.8 393.8 60,249.1
13. Reactor Reserve Shutdown flours 0 0 166.6
14. Hours Generator On.Line 350.7 350.7 58,246.7 0 0 31.2
15. Unit Reserve Shutdown 1(ours
16. Gross Thermal Energy Generated (MWH) 652.752 652.752 122,570,996 204,025 _, 204,025 38,979,537
17. Gross Electrical Energy Generated (MWH) 189.250 189,250 y .9'14.423
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 47.1 9.7 68.0
20. Unit Availability Factor 47.1- 9.7 68.0
21. Unit Capacity Factor (Using MDC Net) 39.1 8.1 *66.7
22. Unit Capacity Factor (Using DER Net) 36.7 7.5 .62.2 ._
23. Unit Forced Outage Rate. 4.9^ 4.9 3.8 1 ._
24. Shutdowns Schedided Over Next 6 Months (Type.Date,and Duration of Each):

I 5..-

l

25. If Shur Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved ,

INITIAL CRITICA LITY

( INITIAL ELECTillCITY CO%1M ERCI A L OPER AIlON ,

i (9/77) l N.,

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50 251 ~

UNIT NAME Turkey Point 4 -

DATE June 15,1983 May 1983 COMPLETED By P- L Pace REPORT MONTH TELEPHONE (1051552-1654

-, .{ g 3 )Yh Licensee ,E-r, h, Cause & Corrective

%.. Date r-5g i .s s 5 Event .

p E? Action to

- 3, s jgg Report : mo j0 Prevent Recurrence 6

18 '

821009 S 374.6 H 4 HB HTEXCH Steam Generator Repair Program completed. Unit returned to service.

1 830516 F 6.0 A 3 CH VALVEX Reactor trip caused by high level in steam generator. Returned to service 2 830517 F 6.2 H 1 IA TURBIN Unit removed from service following turbine runback. Returned to service 3 830517 S 0.0 B 5 HA TURBIN Turbine soak following outage prior to full power operation.

4 830517 S .5 B NA NA TURBIN Unit removed from service for turbine

' overspeed test.

5 830517 F 0.0 H 5 HB HTEXCH Power reduced in accordance with secondary chemistry control guide-lines.

6 830519 F 0.0 H 5 HB HTEXCH Power reduced in accordance with secondary chemistry guidelines 7 830526 F 6.1 A 1 HA TURBIN Unit removed from service due to high temperatures in main turbine.

- Returned to service at reduced power 1 until condition cleared.

I 2 3 4 F: Forced Reason: Method: Exhibit G Instructions S. Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatie Scram. Event Report tLER) File (NUREG.

D-Regulatory Restriction $0ther(Explain) 0161)

E Operator Training & License Examination F-Administrative p ,

5 G Operational Error (Explain) 9 c Aoao 424cw.v..d Exhibit I Same Source to/77) li-Other ( E xplain) 1

z_

SUI"41ARY OF OPERATING EXPERIENCE .

't /

DOCKET HO. 50-251 ._

UNIT Turkey'?oint 4

, .c DATE June.15, 1983 -r COMPLETED BY P. L. Pace .s y

TELEPHONE (305) 552-3654 REPORT !!ONTH May 1983 .

Unit 4 returned to. operation following the Steam Generator Repair Program.

See the Unit Shutdowns Report .for details on outages during the month. -

Other major safety related maintenance activities.inIluded: .

Boric acid heat tracing was adjusted or repaired., -

~ . .

A containment spray pump was overhauled. 'z y -

A high pressure safety injection pressure transmitter' was repiaced.

A spent fuel pool emergency pump was repaired. 4 s Two excore instrumentation source detectors were replaced. ,

A reactor coolant pump switch was replaced.

s '

A CRDM annunciator was replaced.

Inspections and requirements of IE Bulletins and t!UREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional in-formation. _ , ,

.(-

  • 3

%'  %=.

w g d

a t

- , . , - ~ ..,.,, .-- , . . - - . . , _ _ -, ._. _ _ . . _ _ . . , _ _ . -

/ t

-) .

AVEllAGE DAILY UNIT POWER LEVEL .

50-335 9

'. . DOCKET NO.

UNIT St. Lucie 1 DATE June 15. 1983 COMPLETED itY '

TELEPilONE -(305)S52-3654' .

I MONTil liay 1983 .

DAY AVERAGE D IL WER LEVEL DAY AVER AGE DAILY POWER LEVEL

-(MWe-Net ) ,.

1 37 2 --

g3 ,

-~

l-- 3 19 4 - 20 5 21 6 32 7 23 '

's -- ---

3 24 ,

9

~~-

10 --

26

.Il 37 l' 28 13 29 14- 30

. IS 3g 1 16 I .

v, . .

. INSTRUCTIONS On this format list the average daily unit power lesel in MWe Net for each day in the reporting month. Compute to

, the nearest v, bole rmgawatt.

p e

'i , (9/77)

I f

1 I ,

\

) p

) \ ,  ;

\ >

  • ~

OPERATISG DATA REPORT

, (' DOCKET NO. 50-335 1 '

DATE _.inna 1L_1983 COMPLETED BY P T- Pace TELEPilONE (305)552-3654 4

OPERATING STATUS

^

St. Lucie 1 Notes

1. Unit Name:

. thy 1983

2. Reporting Perioil: Unit remained out of service 2700 <' for refueling and scheduled
3. Licenad Thermal Power (MWt).
4. Nameplate Rating (Gross MWe): 0* '

maintenance". ,

S. Design Electrical Rating (Net MWeb 830 867

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

822 ,,,,,

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report Give Reasons:

Ittms 6 and 7 increased on 5/25/83 based on a review of unit performanen and statistical revicu of circulating water temperatures.

9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions.lf Any:

3 .,

This Month Yr to Date Cumulatise 11; Hours In Reporting Period

'744 3,623 56,471 0 1.366.9 44.466.1

12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown llours _

0 0' '

205.3~

14. Ilours Generator On Line 0 1,350.9 43,576.2

' 15. Unit Reserve Shutdown Hours 0 0 39.3 O 3,532,422 108,667.938 .

/'~ 16. Gross Thermal Energy Generated (MWH) 1,160,280 35,373,875

17. Gross Electrical Energy Generated (MWH) R..

-2232 1,092,117 33,356,306

18. Net Electrical Energy Generated (MWH)*
19. Unit Service Factor O 37.3 77.2
20. Unit Availability Factor 0 37.3 77.2
21. Unit Capacity Factor (Using MDC Net)

~

0 36.9* 75.2*

22. Unit Capacity Factor (Using UER Net) 0 36.3 73.l*

0 1.1 - 4.6

23. Unit Forced Ov;tatte Rate
24. Shutdowns Sclieduled Over Next 6 Months (Type. Date.and Duration of Eacht:
25. If Shut Down At End Of Report Period. Estimated Date of Startup: September 1983
26. Units in Test St.itm (Prior to Commerci.d Operation): Forecast Act ieud ,

INITIA L CRITICALITY INillAL ELECTRICITY COMMEltCI AL OPER ATION _

  • weighted average capacity factors (9/77i

~

DOCKET NO. 50-335 UNIT SilUTDOWNS AND POWER REDUCilONS St- Lucie 1 ,.'

UNIT NAME DATE June 15, 1953 COMPLETED gy P. L. Pace May 1983 REPORT MONTil TELEPHONE (305)552-3654

~. ~

- E

.] g 3 j Ey Licensee [g h Cause & Correcti've Action to

%. Date 5= 5 .5 s E Event n  ? c3

$ Repint = mO Present Recurrente H

f: 5

< 5 :t u!'

6 3 ~ 830226 S 744 C 4 RC FUELXX Unit I remained out af service for refueling and scheduled maintenance.

l 1

. 1 1

1 I 2 3 4 F: Forced Reason: Method: Exhibit G Instructions S. Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee l C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG- l D-Regulatory Restriction 90ther(Explain) 0161)

E-Operator Training & License Examination F Administrative Y ~ 0 * ** *'"" 5 G-Operational Erner IExplain) c . /.o a a ass,w.w.c/ Exhibit I- Same Source PJ/77) Il-Ot her ( E xplain)

SUMMARY

OF OPERATING E7.PERIENCE DOCKET NO. 50-335 UN.IT St. Lucie Unit 1 DATE June 15, 1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT ttONTII flay 1983 St. Lucie Unit 1 remained out of service for a refueling and maint' nance e

outage.

Major safety related maintenance included:

Boric acid heat tracing was replaced.

A containment spray control valve actuator solenoid was replaced.

The hydrogen analyzer was installed.

. See correspondence between FPL and flRC for information concerning the thermal shield ,9 Inspections arid requirements of IE Bulletins and flVREG-0737 are continuing.

Florida Power & Light Company commitments for flVREG-0737 implementation are continuing. Refer to correspondence between FPL and tiRC for additional information.

In accordance with requirements of flVREG-0737 Item II.K.3.3, there were no challenges to PORV or safety valves during the report month. .

O O

I

_ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ . _ . _ _ _ _ . _ _ . _ .. J

AVER AGE DAILY UNIT POWER LEVEL .

50-389

, DOCKET NO.

'~

UNIT St. Lucie 2 DA1E . June _15. 1983 COMPLETED ltY P. L. Pace TELEPilONE

-(305)S52-3654* .

MONDI Pfny 1983

  • i DAY DAY AVER AGE DAILY POWER LEVEL

, AVER AGE DAILY POWER LEVEL.

IM WN'll -

-(MWe-Net ) , .

I l.e 2 gg .

3 19

-- ~~

4 20 5 33 6 22 y '

. g- _: ---

8 --

24 .

9

~~

10 26

.g g i 23 13 29

--- ~~

14 30

,3 16 .

INSTRUC110NS On this format. Int the aserge daily unit power leyl in MWe-Nei for each day in the reporting inonth. Compute io the !)e3re$t whtde f*Wg.tWall.

. (47h I

_ . - ._n,.. -.--n.,. .e--,-n--- n , ,7- ~ -y- ..., , u,, - ~ , - - - , . - - , . .- -n-- --- , , n,

OPERATING DATA REPORT DOCKET NO. 50-389 DATE June 15, 1983 COMPLETED BY P. L. Pace TELEPHONE (305)S52-3654 OPEllATING STATUS St. Lucie Unit 2 Note $

1. Unit Name:
2. Reporting Period: II^Y 1903 Conducted preoperational
57. of 2560 testing.
3. Licenwd t hermal Power (MWI):

850

4. Nameplate Rating (Gros: MWe):
5. Desip Ilectrical Rating (Net MWe): approxiraately 805
6. Maximion Dependable Capacity (Gross MWe): to be deter:ninet t be determinet
7. Maximn.a liependable Capacity (Net MWe);
8. If Ch:mps Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power I.eiel To Which Restricted. If Any (Net MWe): approximately 33
10. Reasons l or Restrictions,1f Any: _ License condition - plant in startup phase.

This Month Yr..to-Da te Cumulative 744 i1. Ilours In Iteporting Period 0

12. Nnmber Of floun Reactor Was Critical
13. Reactor iteserve Shutdown llours 0
14. Ilours Generator On.Line 0
15. Unit Rewrve Shutdown l{ours
16. Gross Thermal Energy Generated (MWH) 0
17. Gross Electrical Energy Generated (MWH) 0 , _ ,
18. Net Electrical Energy Generated (MWH) _

0 NA

19. Unit Service Factor
20. Unit Availability Factor NA ._
21. Unit Capacity Factor (Using MDC Net) NA
22. Unit Capacity F.rctor (Using DER Net) NA .

0

23. Unit Forced Onta-e Rate _
24. ShutdownsSc! minted Over Next 6 MonthsIType.Date.and Duration of Each):

~

25. If Shur Down As End Ofiteport Period. Estimated Date of Startup:
26. Units in rest Statu+(Prior to Commercial Operation): Forecast Achiesed ,

5/27/83 6/2/83 INITIA L CIllTIC31.lTY INITIAL IiLECTRICITY June 1983 6/13/83 COMMERCIAL OPER ATION bate July N (9/77I N

UNIT SIIUTDOWNS AND POWER REDUCTIGNS DOCKET NO. 0-389 ,

i UNIT NAME St- Tnete ? -

DATE June 15. 1983 COMPLETED BY P. L. Pace REPORTMONTil May 1983 TELEPHONE (335) 552-3654 w.

5 *D 0

's C

5E

'9 .

b!'C"5CC 5'u 5*

go y"- 9 C 5 22:d Cause & Corrective 2s 9 .a s cc Event . 27 93 Action to 53 E j5j Repori e NG jL Prevent Recurrence 6

NA ' 830406 NA NA B NA NA NA NA Unit 2 conducted preoperational testing.

i i 2 3 4 f: Forced Reason: Method: Exhibit G -Instructions j S. Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data i B-Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-i D-Regulatory Restriction g-Other (Explain) 0161)

E. Operator Training & License Examination

' F-Administrative ,

5 i G-Operational Error (Explain) i c _ /.o ao e?.4cw.,..cd Exhibit I- Same Source 4 ('l/77) 11-01he r (E xplain)

.. l

  • ' SUIGIARY OF OPERTsTIMG EXPERIEMCE DOCYET HO. 50-389 UNIT St. Lucie Unit 2 DATE June 15,1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT tt0 NTH tiay 1983 Unit 2 continued preoperational testing.

Inspections and requirements of IE Bulletins and t1UREG-0737 are continuing.

Florida Power & Light Company comitments for flVREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

In accordance with requirements of NUREG-0737 Item II.K.3.3., there were no challenges to PORV or safety valves during the report month.

h 1

7.. e* .

FLORIDA POWER & LIGHT COMPANY l

June 15,1983 PNS-LI-83-417/1 Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

Attached are the May 1983 Operating Status Reports and Operating Suninary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit Nos. I and 2.

Very truly yours, MM iji).. W Williams, Jr.

/ Vice ) resident i Nuclear Energy JWW/PLP/js Attachment l

cc: J. P. O'Reilly, Region II i

I l

l

$G I '

PEOPLE. . SERVING PEOPLE