Monthly Operating Rept for Mar 1983
ML20073B296
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 04/01/1983
From: Norris H
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20073B294 List:
References
NUDOCS 8304120207
Download: ML20073B296 (4)


Text

, Enclorurn to.Sarial: RSEP/83-438-i

'*- Pcgs 1 of 4 k' i

OPERATING DATA REPORT DOCKET NO. 050-0261 DATE 830401 COMPLETED BY H. Ray Norris-TELEPHONE (803) 383-4524 OPERATING STATUS Robinson Unit 2 Notes

1. Unit Name:
2. Reporting Period: March 830301.0000/830331.2400 There are presently 157 spent
3. Licensed Thermal Power (MWt): vann fuel assemblies in the spent-
4. Nameplate Rating (Gross MWe): 739.0 fuel pool.
5. Design Electrical Rating (Net MWe):700. 0
6. Maximum Dependable Capacity (Gross MWe): 700.0
7. Maximum Dependable Capacity (Net MWe): 665.0 .
8. If Changes Occur in Capacity Ratings (Items Number 3 Througir 7) Since Last Report, Give Reasons:

No change

9. Power Level To Which Restricted,If Any (Net MWe): 1955 MWT reactor power
10. Reasons For Restrictions,If Any: Althousth the unit is not restricted by any outside agency, the power level is presently reduced due to steam generator considerations.

This Month Yr to-Date Cumulative i1. Hours In Reporting Period 744.00 2160.00 105846.00

12. Number Of Hours Reactor Was Critical 726.33 2110.96 78950.73
13. Reactor Reserve Shutdown Hours 9.63 35.43 1343.20
14. Hours Generator On.Line 725.23 2093.26 75929.30
15. Unit Reserve Shutdown Hours .00 .00 23.26
16. Gross Thermal Energy Generated (MWH) 1309095.60 3678759.84 154443351.36
17. Gross Electrical Energy Generated (MWH) 422706.QR.__. 1184644.00 49693407.00
18. Net Electrical Energy Generated (MWH) 398224.00 1114599.00 46986701.00
19. Unit Senice Factor 97.48 '96.91 72.68
20. Unit Availability Factor 97.48 96.91 72.70
21. Unit Capacity Factor (Using MDC Net) 80.49 _ 77.60 66.75
22. Unit Capacity Factor (Using DER Net) 76.46 73.72 63.42
23. Unit Forced Outage Rate 2.52 3.09 13.94
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):

Type two 4-23-83, three week steam generator inspection outage.

25. If Shut Down At End Of Report Period Estimated Date of Startup: On line
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY -- --

INITIAL ELECTRICITY COMMERCIAL OPERATION -- ---

~

g304120207 830408 p/771-FOR ADOCK 05000261 PM g .

tn- _ , , , ,

,. Pcg's 2'of 4 '

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-0261 UNIT Unit.2 DATE COMPLETED BY II. Ray Norris TELEPHONE _383-4524-MONTH March DAY AVERAGE DAILY POWER LEVEL DAY. AVERAGE DAILY POWER LEVEL-(MWe-Net) (Mwe. Net) 1 559 g7 559 2 560 gg 561 3 559 -560 39 4 560 561 20 5 561 561 21 6 560 561 3

7 560 247 23 8 559 24 256 9 558 556 25 10 560 26 558 gg 560 559 gy 538 559 13 514 558 29 14 560 30 559-

, 15 558 3g M3 16 559 INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each dayin the reporting month. Compute to the nearest whole megawatt.

(9/77) 4

.w Pcge 3 of 4 -

UNITSHUTDOWNS AND POWER REDUCTIONS E O -

, } Robinson DATE R 40!.ni COMPLETED BY " D- Weris REPORT MONTH March TELEPHONE 803-383-4524

- 5 E

, ,5 g 3 $h Licensee 5 t, $*, Cause & Corrective No. Date g 3g ,3 s s . Event ~g Action to 6- yE d,i; j ;;j Report a mo g{ Prevent Recurrence 6

m 83-01 830301 S 0 A 4 ---

HB HTEXCH Power reduction to =80% due to steam generator consideration.

83-02 830323 F 18.77 A/B 3 ---

IA INSTRU Unit trip due to turbine runback initiated while performing periodic test. Testing was in progress on NIS power range logic circuits when two test switches malfunctioned. The

' switches were replaced. The shutdown was extended an additional = 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> due to faulty AC circuit cards in the rod control system.

Cards were repaired. m

.t i 2 3 4 F: Forced Reason: Method: -

Exhibit G Instructicos S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Admimstrative 5 G-Operational Error (Explain) Exhibit I- Same Source (9/77) Il-Oiher (Explain) 4 th -

. Itgs:4Jof:4  !

, 1 e-

  • _- )

.i

- AVERAGE DAILY UNITPOWER LEVEL j DOCKET NO. 050-0261 __  ;

UNIT Unit 2 .

DATE 830401 COMPLETED BY - H. Ray Norris TELEPHONE (803) 383-4524 -

MONTH February DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL -

(MWe-Net) (MWe-Net) g 563 562' 17' ,

2 562 3g- 217 3 562 *19 390 4 484 559 20 .

5 365 559 21 6 413 560 22 7 418 559 23 8 478 24 559-9 560 426 25 10 561 - 26 558 11 561 '

  • 27 558
  • 12 562 558 28 13 562 29 14 562 30 15 563- 3g __

16 561 INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to -

the nearest whole megawatt.

(9/77)

  • Corrected copy see March 1983 Report for details '