|
---|
Category:REPORTABLE OCCURRENCE REPORT (SEE ALSO AO LER)
MONTHYEARML20205N2951999-04-13013 April 1999 Special Rept:On 990314,fire Detection Sys Was Removed from Svc to Support Mod to Replace SRW Heat Exchangers in Unit 2 SRW Room During Unit 2 Refueling Outage.Contingency Measure 15.3.5.A.1 Will Continue Until Fire Detection Sys Restored ML20206Q3221999-01-11011 January 1999 Special Rept:On 981226,wide Range Noble Gas Effluent RM Was Removed from Operable Status.Caused by Failure of mid-range Checksource to Properly Reseat.Completed Maint & post-maint Testing & RM Was Returned to Operable Status on 990104 ML20154Q7191998-10-21021 October 1998 Special Rept:On 980923,unit 1 Wrngm Was Removed from Operable Status.Caused by Failure of Process Flow Transducer.Completed Maint to Remove Process Flow Transducer Input to Wrngm Microprocessor & Completed Formal Evaluation ML20153C2571998-09-18018 September 1998 Special Rept:On 980830,wide Range Noble Gas Monitor (Wrngm) Channel Was Removed from Operable Status.Caused by Need to Support Performance of Required 18-month Channel Calibr.Will Return Wrngm to Operable Status by 980925 ML20151T5281998-09-0101 September 1998 Special Rept:On 980819,declared Rv Water Level Monitor Channel a Inoperable.Caused by Failure of Three Heated Junction Thermocouples (Sensors) in Lower Five Sensors. Channel a & B Rv Water Level Probes Will Be Replaced ML20249A9571998-06-15015 June 1998 Special Rept:On 980430,fire Detection Sys Was Removed from Svc to Support Mod to Purge Air Sys 27-foot Elevation & 5-foot Elevation East Piping Penetration Rooms.Installed Temporary Alteration & Returned Fire Detection Sys to Svc ML20247K2641998-05-15015 May 1998 Special Rept:On 980405,Unit 1 Svc Water Room Fire Detection Instrumentation Was Inoperable for Greater than 14 Days. Caused by Support of Mod Sys.Will Restore Instrumentation to Operable Status After Mod Welding Work Is Completed ML20247K2461998-05-15015 May 1998 Special Rept:On 980409,Unit 1 TB SW Room,Fire Barrier Penetrations (Doors 213 & 214) Had Been Inoperable for More than 7 Days.Doors Were Opened to Permit Movement of Matl in & Out of Room.Doors Will Be Open Until Mods Are Completed ML20247K3281998-05-15015 May 1998 Special Rept:On 980405,fire Detection Instrumentation in Unit 1 East & West RCPs Motor Bays Were Inoperable for More than 14 Days.Bays Were Removed to Support Overhaul of RCP Motors.Will Restore Implementation Upon Repair Completion ML20216G3951998-04-15015 April 1998 Special Rept:On 980320,declared Unit 2 Reactor Vessel Water Level Monitor Channel Inoperable.Caused by Failure of Three Heated Junction Thermocouples in Lower Five Sensors.Will Replace Channel B Reactor Vessel Water Level Probe ML20216D2641998-04-0202 April 1998 Ro:On 980226,discovered Potential Condition That May Render NUHOMS-24P Dry Shielded Canister/Fuel Package Defective. Caused Misapplication of Llnl Rept UCID-21246, Dynamic Impact Effects of Sfas. Performed Operability Evaluation ML20202C1761998-02-0505 February 1998 Special Rept:On 980101,CR Vestibule to Turbine Bldg Door 401 Failed to Automatically Close as Designed.Caused by Increased Vestibule Pressure.Util Made Adjustments to Doors Automatic Closure Mechanism ML20212F4911997-10-30030 October 1997 Ro:On 970930,fire Detection Instrumentation Declared Inoperable Greater than 14 Days to Support Mod to Svc Water Hxs.Fire Detection Will Be Restored to Operable Status When Mod Completed ML20217R3401997-08-28028 August 1997 Ro:On 970729,abnormal Degradation of Surveillance Was Detected.Scope of lift-off Testing & Visual Insps to 100% of Tendons to Determine Extent & Cause of Corrosion Has Been Expanded ML20151J8951997-07-24024 July 1997 Special Rept:On 970628,Unit 2 WR Noble Gas Monitor Was Inoperable for Period in Excess of Seven Days.Caused by Failure of Low Range Channel High Voltage Power Supply. Replacement Power Supply Was Installed ML20141H3341997-07-0101 July 1997 Special Rept:On 970606,Main Steam Header Radiation Monitors Were Declared Inoperable.Caused by Failure of Detectors to Respond to Checksource.Will Continue Addl Vendor Testing of Proposed Mod & Will Perform Testing of Modified Detectors ML20141H5331997-05-15015 May 1997 Special Rept:On 970415,Unit 1 Wide Range Noble Gas Monitor Was Removed from Operable Status.Caused by Removal of Monitor from Svc to Complete Approved Mod ML20141H0171997-05-15015 May 1997 Special Rept:On 970425,Unit 1 Containment High Range Radiation Monitors Removed from Operable Status.Caused by Removal of Monitors from Svc to Complete Approved Mod ML20141D4051997-05-0808 May 1997 Special Rept:On 970327,fire Detection Sys Removed from Svc to Support Mod to Purge Air Sys in Unit 2 27-foot Elevation & 5-foot Elevation East Piping Penetration Rooms During Refueling Outage.Temporary Alteration Installed ML20141D3731997-05-0808 May 1997 Special Rept:On 970331,fire Detection Instruments Main Exhaust Equipment Room Were Disabled Due to Welding Activities.Established Hourly Fire Watch Patrols in Affected Areas,Completed Welding & Returned Instruments to Service ML20148A8091997-05-0101 May 1997 Special Rept:On 970421,portion of Fire Suppression Water Sys Was Isolated.Caused by Repairs Being Made to Section of Fire Main Piping.Fire Main Restored to Normal line-up ML20141D3821997-04-28028 April 1997 Special Rept:On 970319,Fire Detection Sys for Units 1 & 2 Rendered Inoperable.Caused by Unit Shutdown for Refueling Outage.Restored Fire Detection Sys to Operable Status at Conclusion of Unit 2 Refueling Outage ML20141G1851997-04-28028 April 1997 Special Rept:On 970317,fire Detection Instruments in Unit 2 Containment 22A RCP Motor Bay Disabled Via Temporary Alteration.Heat Detection Circuits Were Not Restored within 14 Days Required by Ts.Fire Detection Will Be Tested ML20138E8211997-04-23023 April 1997 Special Rept:On 970316,fire Barrier Penetrations Were Inoperable for More than 7 Days Due to Placement of Pal in Open Position.Pal Will Be Closed & Interlocks re-enabled Prior to Unit 2 Startup ML20135F3381997-03-0505 March 1997 Special Rept:On 970208,removed Main Steam Header Radiation Monitors from Operable Status to Allow Installation of New Main Steam Header Radiation Monitors Per Approved Mod.Will Return Monitors to Operable Status 970307 ML20135F3441997-03-0505 March 1997 Special Rept:On 970122,declared Halon Fire Suppression Sys Inoperable.Caused by Failure of Damper to Stroke Fully Closed.Removed,Overhauled & Reinstalled Damper 0-DAMP-5443 W/Replacement Bushings ML20134F8411997-02-0303 February 1997 Special Rept:On 970110,declared Main Steam Header Radiation Monitor Inoperable.Caused by Intermittent Electrical Contact in Cable & Degrade Performance of Ratemeter.Installed Ratemeter During Week of 970210 ML20133M2221997-01-17017 January 1997 Special Rept:On 961220,declared Main Steam Header Radiation Monitor Inoperable.Caused by Intermittent Electrical Contact of Ratemeter Connector for Signal Cable from Detector. Replaced Cable Connector ML20117J9901996-09-0404 September 1996 Special Rept:On 960807,Diesel Fire Pump Disabled.Caused by Routine Maint on Pump.Completed Work on Pump,Tested & Restored Pump to Operable Status ML20117F6391996-05-14014 May 1996 Special Rept:On 960404,fire Hose Stations Inside Unit 1 Containment Disabled to Permit Work Activities.Temporary Fire Hose in Place Until Fire Main Restored to Operable Status on 960507 ML20108D7941996-05-0303 May 1996 Special Rept:On 960326,fire Detection Instrumentation in Unit 1 SW Water Pump Room Was Disabled Via Temporary Alteration to Permit Work Activities.Hourly Fire Watch Patrol Was Initiated to Inspect Affected Fire Zone ML20108D7861996-05-0303 May 1996 Special Rept:On 960330,RCP Motor Bay Was Disabled Due to Temporary Alteration to Support Removal of 12B RCP Motor During Unit 1 Refueling Outage.Containment Air Being Monitored Once Per H at Location Listed in SR 4.6.1.5 ML20095A3741995-12-0101 December 1995 Special Rept:On 951104,Unit 2 Main Steam Header Radiation Monitor Removed from Svc.Caused by Degraded Performance of Circuit Cards in Control Room Ratemeter.Main Steam Header Radiation Monitor Returned to Operable Status ML20092B7211995-09-0707 September 1995 Special Rept:On 950801,diesel Fire Pump (DFP) 12 for Fire Suppression Water Sys Disabled & on 950808,exceeded Seven Day Requirement to Restore Inoperable Equipment to Operable Status.Dfp Engine Rebuilt & DFP Declared Operable on 950901 ML20084R4441995-06-0202 June 1995 Special Rept:On 950403,hydrogen Analyzer Inoperable Due to Maint on EDG 21.Following Maint Hydrogen Analyzer Returned to Svc ML20082G6891995-04-11011 April 1995 Special Rept:On 950320,fire Detection Instruments in Containment 21B RCP Motor Bay Inoperable for Greater than 14 Days to Support Unit 2 Refueling outage-related Work. Appropriate Compensatory Actions Taken ML20082F4301995-04-0707 April 1995 Special Rept:On 950310,WR Noble Gas Effluent RM Failed Automatic Check Source.Monitor Has Repeatedly Failed mid- Range Check Sources,Causing Failed Automatic Check Source. Temporary Alteration Made to mid-range Channel ML20064N9891994-03-25025 March 1994 Special Rept:On 940224,fire Detection Instrumentation Was Inoperable for More than 14 Days.Established Hourly Fire Watch to Inspect Fire Zone ML20063K4591994-02-11011 February 1994 Special Rept:On 940110,fire Suppression Halon Sys Disabled Due to Work Activity in Area Involving Removal of Marinite Cable Tray Covers.Halon Sys Inoperable for More than 14 Days.Subj Sys Scheduled to Be Inoperable Until 940412 ML20063K4571994-02-11011 February 1994 Ro:On 940131,plant Intake Embayment Instrumentation Sample Pump Found to Be Not Working.Pump Out of Svc for Unknown Amount of Time But Less than 72 H.Sample Pump Immediately Replaced & Sample Flow Restored ML20059D6341993-12-15015 December 1993 Special Rept:On 931215,discovered Wide Range Noble Gas Monitor Out of Svc for More than 7 Days.Caused by Malfunctioning mid-range Check Source Assembly.Monitor Returned to Svc on 931214 ML20116N4171992-11-13013 November 1992 Special Rept:On 921005,fire & Smoke & Flame Detection for Spent Fuel Area Disabled to Permit Welding,Cutting & Grinding Operations to Install New Spent Fuel Crane.Hourly & Continuous Fire Watch Established Until Equipment Restored ML20115J0051992-10-22022 October 1992 Special Rept:On 920921,Channel a Rvlms Removed from Svc & Channel a Failed Open Thermocouple Test.On 921001,improper Ground Isolation Discovered,Resulting in Incorrect Voltages to Circuit Board.Channel a Returned to Svc on 921002 ML20115C5841992-10-0909 October 1992 Special Rept:On 920829,Tech Spec App B Re Fish Killed.Caused by Low Dissolved Oxygen Levels in Embayment Area.Licensees Anticipate That Mod Will Reduce Mortality Rates of Fish, Especially Large Ones ML20099K2841992-08-21021 August 1992 Special Rept:On 920720,fire Dampers for Unit 1 Auxiliary Bldg Exhaust,Unit 1 Containment Purge Exhaust,Unit 2 Auxiliary Bldg Exhaust & Unit 2 Containment Purge Exhaust Found Inoperable.Hourly Fire Watch Established ML20101U4631992-07-20020 July 1992 Special Rept:On 920624,fire Dampers for Switchgear Room HVAC Found Inoperable.Hourly Fire Watch Established.Root Cause & Corrective Actions for Event Will Be Discussed in Upcoming LER ML20101F4211992-06-22022 June 1992 Special Rept:On 920518,fire Dampers for Switchgear Room HVAC Sys Found Inoperable During Engineering Test Procedure 91-77 Re Fire Damper Testing.Cause Unknown.Maint Work in Progress to Correct Fire Dampers ML20101F5181992-06-22022 June 1992 Special Rept:On 920609,detectors Were Declared Inoperable for More than 14 Days.Hourly Fire Watch Patrol Was Established & Detection Sys Was Restored to Operable Status ML20101G7961992-06-22022 June 1992 Special Rept:On 920521,fire Detection for Unit 1 & 2 Intake Structure Disabled.Caused by Continous Alarm at Fire Alarm Panel in Control Room & Single Point Annunciator on Control Boards.Response to Plant Fire Alarms Delayed ML20101B7551992-05-28028 May 1992 Special Rept:On 920501,Unit 1 Svc Water Room Was Maintained Open to Support Work Activities During Unit 1 Refueling Outage.Fire Door Will Be Closed Prior to Startup Scheduled for mid-Jul 1992 1999-04-13
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20216J8731999-09-10010 September 1999 Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML17326A2011999-08-23023 August 1999 LER 99-004-00:on 990724,reactor Tripped Due to Main Transformer Bushing Flashover.Plant Was Brought to SS & Components Were Tested & Performed Satisfactorily.With 990823 Ltr ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20210N6001999-07-27027 July 1999 ISI Summary Rept for Calvert Cliffs Unit 2. Page 2 of 3 in Encl 1 of Incoming Submittal Not Included ML20210B7941999-07-15015 July 1999 SER Denying Licensee Request for Changes to Current Ts,Re Deletion of Tendon Surveillance Requirements for Calvert Cliffs LD-99-039, Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified1999-06-30030 June 1999 Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With LD-99-035, Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed1999-06-25025 June 1999 Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed ML20196C6981999-06-21021 June 1999 Safety Evaluation Concluding That Use of ASME Section XI Code Including Summer 1983 Addenda as Interim Code for Third 10-year Insp Interval at Calvert Cliffs Units 1 & 2 Until Review of 1998 Code Completed,Would Be Acceptable ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20195B3891999-04-30030 April 1999 0 to CENPD-279, Annual Rept on Abb CE ECCS Performance Evaluation Models ML20205N2951999-04-13013 April 1999 Special Rept:On 990314,fire Detection Sys Was Removed from Svc to Support Mod to Replace SRW Heat Exchangers in Unit 2 SRW Room During Unit 2 Refueling Outage.Contingency Measure 15.3.5.A.1 Will Continue Until Fire Detection Sys Restored ML20210T5211999-04-0101 April 1999 Rev 0 to Ccnpp COLR for Unit 2,Cycle 13 ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20204H6471999-03-21021 March 1999 SER Re License Renewal of Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20203D4311999-02-0505 February 1999 Safety Evaluation Accepting Procedure Established for long-term Corrective Action Plan Related to Containment Vertical Tendons ML20199G4671999-01-20020 January 1999 SER Accepting USI A-46 Implementation for Plant ML20206Q3221999-01-11011 January 1999 Special Rept:On 981226,wide Range Noble Gas Effluent RM Was Removed from Operable Status.Caused by Failure of mid-range Checksource to Properly Reseat.Completed Maint & post-maint Testing & RM Was Returned to Operable Status on 990104 ML20207L0451999-01-0808 January 1999 Cost-Benefit Risk Analyses:Radwaste Sys for Light Water Reactors ML20199F4781999-01-0808 January 1999 Safety Evaluation Concluding That Bg&E Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking.Concludes GL 95-07 Actions Were Addressed ML20198S7591999-01-0707 January 1999 SER Accepting Quality Assurance Program Description Change for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M2281998-12-31031 December 1998 1998 Annual Rept for Bg&E. with ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20206R9911998-12-0808 December 1998 Rept of Changes,Tests & Experiments (10CFR50.59(b)(2)). with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195H1001998-11-16016 November 1998 Safety Evaluation of First Containment Insp Interval Iwe/Iwl Program Alternative ML20196E2211998-10-31031 October 1998 Non-proprietary Rev 03-NP to CEN-633-NP, SG Tube Repair for Combustion Engineering Designed Plant with 3/4 - .048 Wall Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154Q7191998-10-21021 October 1998 Special Rept:On 980923,unit 1 Wrngm Was Removed from Operable Status.Caused by Failure of Process Flow Transducer.Completed Maint to Remove Process Flow Transducer Input to Wrngm Microprocessor & Completed Formal Evaluation ML20154G3931998-10-0505 October 1998 Safety Evaluation Concluding That Flaw Tolerance Evaluation for Assumed Flaw in Inboard Instrument Weld of Pressurizer Meets Rules of ASME Code ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With ML20153C2571998-09-18018 September 1998 Special Rept:On 980830,wide Range Noble Gas Monitor (Wrngm) Channel Was Removed from Operable Status.Caused by Need to Support Performance of Required 18-month Channel Calibr.Will Return Wrngm to Operable Status by 980925 ML20153C1091998-09-18018 September 1998 Part 21 Rept Re Defective Capacity Control Valves.Trentec Personnel Have Been in Contact with Bg&E Personnel Re Condition & Have Requested Potentially Defective Valves ML20151U5441998-09-0404 September 1998 Bg&E ISI Summary Rept for Calvert Cliffs ML20151T5281998-09-0101 September 1998 Special Rept:On 980819,declared Rv Water Level Monitor Channel a Inoperable.Caused by Failure of Three Heated Junction Thermocouples (Sensors) in Lower Five Sensors. Channel a & B Rv Water Level Probes Will Be Replaced ML20151Y1191998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With ML20237D4981998-08-19019 August 1998 Safety Evaluation Accepting Licensee Request for Extension of Second ten-year Inservice Insp Interval ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20237B9371998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant ML20237D5941998-07-22022 July 1998 Rev 2 to Ccnpp COLR for Unit 2,Cycle 12 ML20236L7521998-07-0606 July 1998 Safety Evaluation Granting Bg&E 980527 Request for Relief from Requirement of Section IWA-5250 of ASME Code for Calvert Cliffs Unit 2.Alternatives Provide Reasonable Assurance of Operational Readiness ML20236F7791998-06-30030 June 1998 Safety Evaluation Authorizing Request for Temporary Relief from Requirement of Subsection IWA-5250 of ASME Code,Section XI for Plant,Unit 1 ML20236R0881998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20236X3101998-06-19019 June 1998 Rev 1 to Calvert Cliffs Nuclear Power Plant COLR for Unit 2,Cycle 12 ML20249A9571998-06-15015 June 1998 Special Rept:On 980430,fire Detection Sys Was Removed from Svc to Support Mod to Purge Air Sys 27-foot Elevation & 5-foot Elevation East Piping Penetration Rooms.Installed Temporary Alteration & Returned Fire Detection Sys to Svc ML20249A7711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 1999-09-30
[Table view] |
Text
. --
,, b B A LTIMORE GAS AND i ELECTRIC CALVERT CLIFFS NUCLEAR POWER PLANT 1650 CALVERT CLIFFS PARKWAY
- LUSBY, MARYLAND 20657-4702 CHARLES H CRUSE February 11,1994 PtANT GLfJE RAL MANAGE R CALVERT CLIFFS U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit No.1; Docket No. 50-317 Fire Suppression Halon System Special Report Technical Specification 3.7.11.3. Action Statement a Per the requirements of Technical Specification 3.7.11.3, Action Statement a, we hereby submit the attached Special Report concerning inoperable Halon Syuem. Specifically the Halon System in the Unit 1 Cable Spreading Room was it. operable for greater than 14 days. ;
Should you have any further questions regarding this matter, we will i>e pleased to discuss them with you.
Very truly yours,
,4%
b;lf ,
l s scf Grav ,
,i i CHC/WDM/bjd -
j Attachment I cc: D. A. Brune, Esquire )
J. E. Silberg, Esquire 'l R. A. Capra, NRC l D. G. Mcdonald, Jr., NRC !
T. T. Martin, NRC l P. R. Wilson, NRC !
R. I. McLean, DNR J. H. Walter, PSC OQne.
//Q ;
9403010168 940211 PDR ADOCK 05000317 I \\
R PDR L
I
~l
'- A'ITACIIMENT (1)
FIRE SUPPRESSION (HALON) SYSTEM SPECIAL REPORT 4
HACKGROUND On January 10,1994, the Halon 1301 total flooding fire suppression system in the Unit 1 Cable Spreading Room (CSR) was disabled. The Halon system was disabled due to a work activity in the area involving the removal of the marinite cable tray covers. This work activity has resulted in the room being subdivided with plastic shecting material (only fire retardant plastic is used). This subdivision could affect the effectiveness of the Halon system. In addition, the work activity requires personnel to be working in the overhead near the Halon nozzles. A Halon discharge could result in personal injury to the workers. Therefore, a decision was made to declare the Halon system inoperable and disable it. The Unit 1 CSR Halon system will remain inoperable until the work is r complete. .
The Unit 1 CSR total Hooding Halon system is addressed by Technical Specification 3.7.11.3.a. The Action Statement for this Technical SpeciUcation was entered when the Halon system was disabled.
Backup fire suppression capability in the form of manual hose stations are available near the ,
entrance to the room.
As specified by Technical Specification 3.7.11.3, Action Statement a, a Special Report must be issued to the Commission pursuant to Technical Specification 6.9.2 if the Halon system is not restored to operability within 14 days. The Halon system was inoperable for 14 days as of January 24,1994. As required, this Special Report will address actions taken, the cause of the inoperability, and the plans and schedule for restoring the system to operability.
EFFECT ON UNIT OPERATION i On January 10,1994, the Halon system in the Unit 1 CSR was disabled via a Temporary Modification Evaluation. Unit 1 was at 100% power at the time. The Halon system was disabled due to the work activitics associated with the marinite board removal project and the related asbestos abatement requirements. Technical Specification 3.7.113, Action Statement a, was entered when the system was disabled. Backup suppression capability is provided by the manual hose stations located near the entrance to the room. Continuous fire watch is being performed.
In addition to the Action Statement mandated activities, there are several other features which mitigate the potential for a fire in the CSR while the Halon system is disabled. The smoke detection system in the Unit 1 CSR is still operable. This system will provide an early warning of a fire ,
condition in the room which will permit the fire brigade to attack the Ere while it is still in an incipient stage. The Halon system was disabled in such a way that, if necessary, it can be manually discharged (if the system trip logic is satisfied). In addition, welding activities have been prohibited in the CSR without prior review by the Plant Operations Safety Review Committee. These measures minimize the potential for a fire and would also minimize the effects of a fire.
PIANS AND SCllEDULES The Halon system in the Unit 1 CSR is scheduled to remain inoperable until approximately April 12, l 1994 during the planned Unit 1 Refueling Outage. This is the anticipated completion date of the l Unit 1 CSR marinite board removal activity.
1 l
l
. - _ __ _ _ . . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _