f *."

I t

l CALVERT CLIFFS NUCLEAR POWER PLANT CORE OPERATING LIMITS REPORT for UNIT 2, CYCLE 12 REVISION 2 D i-ed r d. h 7/z2/9s RESPONSIBLE ENGINEER / DATE Ad 7 / t 1/9 8 INDEPENDENT REVIEWER / DATE R

22.J u l u f)36 PRINCIPAL ENGINEER'- NEU / DATE' 1

AD 0

318 l

P PM Calvert Cliffs 2, Cycle 12 COLR Page1of22 Rev.2

~

CORE OPERATING LIMITS REPORT CALVERT CLIFFS UNIT 2, CYCLE 12 The following limits are included in this Core Operating Limits Report:

Specification Titla Eage Introduction.........................................................................................................4 2.2.1 Reactor Trip Setpoints..............................

...................................................5 3.1.1.1 Shutdown Margin - Tavg > 200 'F.................................................................. 5 3.1.1.2

. Shutdown Margin - Tavg 5 2 00 *F.....................................................................'.... 5 -

3.1.1.4 Moderator Tem perature Coefficient........................................................................ 5 3.13.1 CEAPosition......................................................................................................5 3.1.3.6

Regulating CEA Insertion Limits............................................................................ 5 3.2.1 Linear Heat Rate.................................................................................................... 5 3.2.2.1 Total Planar Radial Peaking Factor.........................

..............................6 3.2.3

. Total Integrated Radial Peaking Factor................................................................... 6

- 3.2.5 DNB Param eters....................................................................................................... 6 3.9.1 Boron Concentration.............................................................................................. 6

' List of Approved Methodologies........................................................................... 19 The following figures are included in this Core Operating Limits Report:

Number Titig East Figure 2.2.1 Peripheral Axial Shape Index vs. Fraction of Rated Thermal Power........................ 7 Figure 2.2-2 Thermal Margin / Low Pressure Trip Setpoint - Part 1.............................................. 8 Figure 2.2-3 Thermal Margin / Low Pressure Trip Setpoint - Part 2.............................................. 9 Figure 3.1.1-1 Shutdown Margin vs. Time in Cycle................................................................... 10 Figure 3.1.3-1, Allowable Time To Realign CEA Versus Initial Total Integrated Radial Peaking Factor........................................................ I 1 Figure 3.1.3-2 CEA Group Insertion Limitsvs. Fraction of Rated Thermal Power......................12 Figure 3.2.1-1 Allowable Peak Linear Heat Rate vs. Time in Cycle..........

....................13

- Figure 3.2.1-2 ' Linear Heat Rate Axial Flux Offset Co9 trol Limits..................................14

' ' Figure 3.2.1-3 Total Planar Radial Peaking Factor /Fxy vs.

Maximum Allowable Fraction of Rated Thermal Power....................................I 5

' Figure 3.2.2-1 Total Planar Radial Peaking Factor vs. Allowable Fraction of Rated l'

Therm al Po we r................................................................................................

Figure 3.2.3-1 TotalIntegrated Radial Peaking Factor vs.

  • Allowable Fraction of Rated Thermal Power..............................

.............. I 7 Figure 3.2.3-2 DNB Axial Flux Offset Control Limits...............................................................18 l

Calvert Cliffs 2, Cycle 12 COLR Page 2 of 22 Rev.I y

pL

a CORE OPERATING LIMITS REPORT LIST OF EFFECTIVE PAGES Page No.

Rev. No.

I 2

2 1

3 2

4 2

5 0

6 1-7 0

8 0

9 0

10 0

11 1

12 0

13 0

14 0

15 1

16 1

17 1

18 0

19 0

20 1

21 0

22 0

4 f

Calvert Cliffs 2, Cycle 12 COLR Page 3 of 22 Rev.2 i

O

1 INTRODLICTION This report provides the cycle-specific limits for operation of Calvert Cliffs Unit 2, Cycle 12. It contains the limits for:

Reactor Trip Setpoints Shutdown Margm.

Moderator Temperature Coefficient CEA Position -

Regulating CEA Insertion Limits

{

Linear Heat Rate Total Planar Radial Peaking Factor Total Integrated Radial Peaking Factor DNB Parameters Refueling Boron Concentration In addition, this report contains a number of figures which give limits on the parameters listed above. If any of the limits contained in this report are exceeded, corrective action will be taken as defined in the Technical Specifications.

I

. This report has been prepared in accordance with the requirements of Technical Specifications'.

The cycle specific limits have been developed using the NRC-a? proved methodologies given in the " List of Approved Methodologies" section of this report anc m the Technical Specifications.

Revision 1:

Revision 1 to the Unit 2 Cycle 12 COLR implements a 3% penalty on power peaking. The 3% is a compensatory action required by 50.59 safety evaluation SE00266 to justify operation of the ICI system with up to 60% failed ICI detectors and up to 60% failed ICI strings for the remainder of Unit 2 Cycle 12.

l Revision 2:

Revision 2 to the Unit 2 Cycle 12 COLR resolves Issue Report IR3-016-452 which documented a typographical error on page 3 of 22.

p i

7 -

Calvert Qliffs 2, Cycle 12 COLR

Page 4 of 22 Rev.2

1 l

CYCLE SPECIFIC LIMITS FOR UNIT 2, CYCLE 12 l

2.2.1 Reactor Trip Setpoints The Axial Flux Offset trip setpoint and allowable values are given in COLR Figure 2.2-1.

The Thermal Margin / Low Pressure trip setpoint is given in COLR Figures 2.2-2 and 2.2-3.

The allowable values are to be not less than the larger of(1) 1875 psia or (2) the value calculated from COLR Figures 2.2-2 and 2.2-3.

3.1.1.1 Shutdown Margin - Tavg > 200 'F i

The shutdown margin shall be equal to or greater than the limit line of COLR Figure 3.1.1-1.

3.1.1.2 Shutdown Margin - Tavg5 200 'F The shutdown margin shall be 2: 3.0% Ap.

'3.1.1.4 Moderator Temperature Coefficient The moderator temperature coefficient (MTC) shall be less negative thar: -3.0 x 10-4 Ap/0F l

at rated thermalpower.

3.1.3.1 CEA Positloh The allowable time to realign a CEA versus the initial total integrated radial peaking factor is given in COLR Figure 3.1.3-1.

3.1.3.6 Regulating CEA Insertion Limits The regulating CEA groups insertion limits are shown on COLR Figure 3.1.3-2.

3.2.1 Linear Heat Rate -

The linear heat rate shall not exceed the limits shown on COLR Figure 3.2.1-1.

The axial shape index power dependent control limits are given in COLR Figure J.2.1-2.

When using the excore detector monitorine system (SR 4.2.1.3h l

The axial shape index alarm setpoints are shown on COLR Figure 3.2.1-2.

The maximum allowable fraction of rated thermal power vs. Fxy is shown in COLR Figure T

3.2.1-3.

When using the incore detector monitorine system (SR 4.2.1.4h The alarm sdtpoints are set to protect the Linear Heat Rate limits shown on COLR Ficure 3.2.1 1.

Calvert Cl$s 2, Cycle 12 COLR Page 5 of 22 Rev.O

l CYCLE SPECIFIC LIMITS FOR UNIT 2, CYCLE 12 The uncertainty factors for the incore detector monitoring system are:

1.

A measurement-calculational uncenainty factor of 1.092,

  • 2.

An engineering uncertainty factor of 1.03, 3.

A linear heat rate uncertainty factor of 1.002 due to axial fuel densification and thermal expansion, and 4.a For measured thermal power less than or equal to 50 percent but greater than 2'O percent of rated full core power a thermal power measurement uncertainty factor of 1.035.

4.b For measured thermal power greater than 50 percent of rated full core power a thermal power measurement uncertainty factor of 1.020.

3.2.2.1 Total Planar Radial Peaking Factor T

The calculated value ofF shall be limited to $ 1.649.

  • y T

The allowable combination of thermal power and F are shown on COLR Figure 3.2.2-1.

y 9

3.2.3 TotalIntegrated Radial Peaking Factor The calculated value of F,7 shall be limited to $ 1.649.

  • The allowable combinations of thermal power and F,T are shown on COLR Figure 3.2.3-1.

The DNB axial flux control limits are shown on COLR Figure 3.2.3-2.

3.2.5

'DNB Parameters The axial shape index, thermal power shall be maintained within the limits established by the Better Axial Shape Selection System (BASSS) for CEA insertions of the lead bank of < 55%

when BASSS is operable, or within the limits of COLR Figure 3.2.3-2 for CEA insertions specified by COLR Figure 3.1.3 2.

3.9.1 Boron Concentration The refueling boron concentration shall be maintained uniform and sufficient to ensure that the boron concentration is 2 2473 ppm.

  • A 3% penalty has been incorporated per SE00266.

f Calvert Cliffs 2, Cycle 12 COLR Page 6 of 22 Rev.1

1.300 1.250 1.200 UNACCEPTABLE

-UNACCEPTABLE (0.0,1.17) 1.150 OPERATION OPERATION 1.100 REGION REGION l

1.050 1.000

(.0.2,1.00)

(0.2,1.00) w

' l ' O.950 2

0.900 1

s g

0.850 d

0.800 O.750 S

H 0.700 k

0.650 0

0.600 -

ACCEPTABLE 2

h 0.550 -

OPERATION o

REGION g

0.500 -

O.450 -

0.400 -

( (-0.6, 0.40)

(0.6, 0.40) 0.350 0.300 -

0.250 0.200 -

0.150 c

u

-0.80

-0.60

-0.40 -0.20 0.00 0.20 0.40 0.60 0.80 PERIPHERAL AXIAL SHAPE INDEX, Ye Figure 2.2-1 Peripheral Axial Shape Index vs. Fraction of Rated Thermal Power Calvert biffs 2, Cycle 12 COLR Page 7 of 22 Rev.O

1 4.so TRIP Pym = 2892 x (A ) x (OR ) + 17.16 x Tm - 10393 i

1.50 Oma = A, x QR i

~

1.40 M.0,1.3) 1.30 e\\

1.20 At:: +0.1 567 x ASI+ 1.0

(+0.0,1.1) 1.10 I

\\

h A1

.O.5x ASl+ 1.0 g/p 1.00

~

(0.0, 1.0) 0.90

-0.60 -0.50 -0.40 -0.30 -r 20 -0.10 0.00' O.10_ 0.20 0.30 0.40 0.50 0.60 ASI Figure 2.2-2 Thermal Margin / Low Pressure Trip Setpoint - Part 1 l

(ASI vs. A )

1 i;

l-Calverrclirrs 2, Cycle 12 COLR Page 8 of 22 Rev.O

- - - - - - - ~ - - - - - ~ - - - - - - - ~

~

1.2 7 (1.-2,1.2) 1.1 l

/(10 ; 0).

1.0 j

G.9

/

/ [(0.6 0.85) 0.0

[/

0.7 h

0.6 0.5 O.4 0.3 < 3)

Qone = A, x QR j

i 0.2 l

TRIP Pyra = 2892 x (Qous) + 17.16 x Tm 10393 0.1 i

0.0 2

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 FRACTION OF RATED THERMAL POWER i

l Figure 2.2-3 i.

~

Thermal Margin / Low, Pressure Trip Setpoint - Part 2 (Fraction of Reted Thermal Power vs. QR )

1

' Calven Cliffs 2, Cycle 12 COLR Page 9 of 22 Rev, o

6 ACCEPTABLE 5

OPERATION REGION (EOC,4.5)

O xe 4- -

da 6

(BOC,3.5) z

-[3 3--

e.

MINUMUM SHUTDOWN MARGIN k

2 3:og_2 "

UNACCEPTABLE OPERATION M

REGION 1

O BOC EOC TIME IN CYCLE 1

i i

l.

(-

Figure 3.1.1-1 i

Shutdown Margin vs. Time in Cycle l

Calvert'ElifTs 2, Cycle 12 COLR' Page 10 of 22 Rev.O L____-_=___-_-__.

l t

70-r 60 e (1.523,60) 2 20 --

40 --

1002.1 - 618.6 F/

2 30 --

a 20 --

L s

uJ El 10 --

ALLOWED REGION p

~;

l 3

0--

(1.620, 0) 1.50 1.55

~ 1.60 1.65 1.70 MEASURED PRE-MISALIGtlED TOTAL INTEGRATED RADIAL PEAKING i

FACTOR l

l Figure 3.1.3-1 Allowable Time to Realign CEA Versus l-Initial Total Integrated Radial Peaking Factor L.

A 3% penalty has been incorporated per SE00266.

Calvert Cliffs 2, Cycle 12 COLR Page 1I of 22 Rev.I

1.000 e (1.00. Group 5 @ 35%)

/

i 3

0.900

'- (0.90 Grmose 35%i e

.)

E o

0.800'

]

(').75, i3roup 5@ 50%)

0.700

- (0 73 G"*5@ 80)

3%

(O SS, G'oup! 08 ;%)

0.600

'k I

- 3roup 4@ 50%)

(').56, i tu t}

s

.,.s

.Q00 l LongTermsteady State Insertion Umit, O

e

-j 0.400 Group s @ 25%

a g

o 0.300 2

e i

f O

$ ' O.200

-(0.2) Gnup 3@ 60".)

N

' shortTerm steady 8

state Insertion urnit.

l 0.100 s

Group 4 @ 20%

i O.000 I

I I

I

(0 0). Grde 3 @ soy.)

Allowable BASSS ~ M - (Group 5 @ 55%)

Operating Region 5

3 1

I I

I I

I I

I I

I I

I I

I

.I I

I I

I

.0 20 40 60 80 100 0 20 40 60 80 100 0 20 40 60 80 100 136.0 108.8 81.6 54.4 27.2 0.0 136.0 108.881.6 54.4 27.2 0.0 136.0 108.8 81.6 54.4 27.2 0.0 j

4 2

I I

I I

I I

I I

I I

I I

O 20 40 60 -60 100 0 20 40 60 80 100 136.0 108.8 81.6 54.4 27.2 0.0136.0 108.8 81.6 54.4 27.2 0.0

%CEA INSERTION INCHES CEA WITHDRAWN Figure 3.1.3-2 1

CEA Group Insertion Limits vs. Fraction of Rated Thermal Power

\\

' Calven Cliffs 2, Cycle 12 COLR Page 12 of 22 Rev.O

17.0 16.5 16.0 E

NO g15.5 z8

  • 8 b + 15.0 bO x5 gO UNACCEPTABLE OPERATION
n. 314.5 c j

j 3*

ACCEPTABLE OPERATION E

14.0 d

<c 13.5 13.0 BOC EOC TIME IN CYCLE l

Figure 3.2.1-1 l

Allowable Peak Linear Heat Rate vs. Time in Cycle f

Calvert Cliffs 2, Cycle 12 COLR Page 13 of 2'2 gey, o

a 4

1.100-i 1.050 --

1.000 --

(-0.06,1.00)

(0.12,1.00) 0.950 UNACCEPTABLE UNACCEPTABLE 0.900 --

OPERATION OPERATION REGION REGION 0.850 --

0.800 --

g n.

J 0.750 --

N a:

0.700 -- (-0.3, 0.70)

(0.3, 0.70) w

% 0.650 --

ACCEPTABLE m

g;j 0.600 --

OPERATION h

0.550 --

o d 0 500 --

(-0.3, 0.50)

\\

0.450 --

0.400 --

Po 0.3 50l--

k u-0.300 --

0.250 --

0.200 --

0.150 -

(-0.45, 0.15) 0.100 --

O.050 u'

u

-0.60

-0.40

-0.20 0.00 0.20 0.40 0.60 PERIPHERAL AXtAL SHAPE INDEX, Yi Figure 3.2.1-2 Linear He,at Rate Axial Flux Of'fset Control Limits Calvert Cl.iffs 2, Cycle 12 COLR Page 14 of 22 Rev.O i

l-

et ho 1.00 <

(1.426,1.00) c.a 5

a:

W (1.523,0.90) 0.90 --

0 u.0 0.80 --

(1.731,0.80)

Po h

ACCEPTABLE VALUE g

0.70 --

m N

O d<- 0.60 --

llli

~

l 0.50 e :

1.40 1.45 1.50 1.55 1.60 1.65 1.70 1.75 1.80 Fxy' l

Figure 3.2.1-3 Total Planar Radial Peaking Factor /FxyT vs.

Maximum Allowable Fraction of Rated Thermal Power l

(Surveillance 4.2.1.3)

A 3% penalty has been incorporated per SE00266.

Calvert Cliffs 2, Cycle 12 COLR Page 15 of 22 Rev.1 L

~

s l

i l

I e

l i

UNACCEPTAB'.E (1.649,1,00)

N 00 e 1

OPERATION REGION 2

9 0.90 --

[ F*T LIMIT CURVE w

E S

ACCEPTABLE (1.731, 0.80) '

o OPERATION 2-REGION b 0.70 --

g u.

Um j 0.60 --

9 4

i 0.50 l

1.60 1.65 1.70 1.75 1.80 T

Fxy

.q Figure 3.2.2-1 l

Total Planar Radial Peaking Factor vs.

Allowable Fraction of Rated Thermal Power i

(ACTION 3.2.2.1.a.1) l A 3% penalty has been incorporated per SE00266.

/

]

l Calvert Cliffs 2, Cycle 12 COLR Page 16 of 22 Rev.1

6 UNACCEPTABLE (1.649, 1.00) 1.00 e OPERATION REGION 2a j

0.90 --

F,7 LIMIT CURVE 5

E e

h 0.80 --

u.

(1.731,0.80) o ACCEPTABLE 5

OPERATION g

0.70 "

REGION u.

$m

$o 0.60 --

d<

0.50 1.60 1.65 1.70 1.75 1.80 T

Fr Figure 3.2.3-1 Total integrated Radial Peaking Factor vs.

Allowable Fraction of Rated Thermal Power A 3% penalty has been incorporated per SE00266.

Calvert Cliffs 2, Cycle 12 COLR Page 17 of 22 Rev.1

9 1.100 -

1.050 1.000

(-0.10,1,00)

(0.15,1.00) 0.950 UNACCEPTABLE UNACCEPTABLE 0.000 OPERATION OPERATION a

Lu REGION REGION fu 0.850 - -

t E

0.800 -

(-0.3, 0.80) h (0.3, 0.80) 5 o

0.750 --

c.

0.700 - -

to ACCEPTABLE h

0.650 --

OPERATION 3

0.600 REGION a

j 0.550 --

ag 0.500 --

(-0.3, 0.50) 0.450 --

o 0.400 --

2o 0.350 --

1:

0.300 --

0.250 --

O.200 -

0.150 --

( 0.45, 0.15) 0.100 --

0.050 a:

-0.60

' 0.40

-0.20 0.00 0.20 0.40 0.60 PERIPHERAL AXIAL SHAPE INDEX, Yi

~

Figure 3.2.3-2 DNB Axial Flux Offset' Control Limits Calvert Cliffs 2 Cycle 12 COLR Page 18 of 22 Rey, o n

w-____-______

LIST OF APPROVED METHODOLOGIES (1)

CENPD-199-P, Rev l-P-A, "C-E Setpoint Methodology: C-E Local Power Densitt and DNB LSSS and LCO Setpoint Methodology for Analog Protection Systems," January 1986 (Methodology for Specifications 2.2.1,3.1J.6,3.2.1,3.2.2.1,3.23,3.2.5)

(2)

CEN-124(B)-P, " Statistical Combination of Uncertainties Methodology Part 1: C-E Calculated Local Power Density and Thermal Margin /Iow Pressure LSSS for Calvert Cliffs Units I and II December 1979 (Methodology for Specifications 2.2.1,3.1J.6, 3.2.2.1, 3.2J)

(3)

CEN-124(B)-P, " Statistical Combination of Uncertainties Methodology Part 2: Combination of System Parameter Uncertainties in 'Ihermal Margin Analyses for Calvert Cliffs Units 1 and 2,"

January 1980 (Methodology for Specifications 2.2.1, 3.1 J.6, 3.23, 3.2.5)

-(4)

CEN-124(B) P, " Statistical Combination of Uncertainties Methodology Part 3: C-E Calculated Departure from Nucleate Dolling and Linear Heat Rate Limiting Conditions for Operation for Calvert Cliffs Units 1 and 2," March 1980 (Methodology for Specifications 3.13.6,3.2.1, 3.2.2.1,3.23,3.2.5)

(5)

CEN-191(B)-P, "CETOP-D Code Structure and Modeling Methods f6 Calvert Cliffs Units 1 and 2," December 1981 (Methodology for Specifications 2.2.1,3.1J.6,3.2J,3.2.5)

(6)

Letter from.Mr. D. H. Jaffe (NRC) to Mr. A. E. Lundvall, Jr. (BG&E), dated June 24,1982, Unit 1 Cycle 6 License Approval (Amendment No. 71 to DPR 53 and SER) [ Approval to CEN-124(B)-P (three parts) and CEN-191(B)-P)]

-(7)

CEN-348(B) P, " Extended Statistical Combination of Uncertainties," January 1987 (Methodology for Specifications 2.2.1,3.13.6,3.23,3.2.5)

(8)

Letter from Mr. S. A. McNeil, Jr. (NRC) to Mr. J. A. Tieman (BG&E), dated October 21,1987, Docket Nos. 50-317 and 50-318, " Safety Evaluation of Topical Report CEN-348(B)-P, Extended Statistical Combination of Uncertainties" (9).

CENPD-161-P A, " TORC Code, A Coinputer Code for Determining the Thermal Margin of a Reactor Core," April 1986 (Methodology for Specifications 2.2.1,3.1J.6, 3.23,3.2.5)

-(10)

CENPD-162 P-A, " Critical Heat Flux Correlation of C-E Fuel A'ssemblies with Standa'rd Spacer Grids Part 1, Uniform A'xial Power Distribution," April 1975 (Methodology for Specifications

2.2.1,3.13.6,3.23,3.2.5)

(11)l CENPD-207 P-A, " Critical Heat Flux Correlation for C-E Fuel Assemblies with Standard Spacer Grids Part 2, Non-uniform Axial Power Distribution," December 1984 (Methodology for Specifications 2.2.1,3.1J.6,3.2.3,3.2.5)

(12)

CENPD-206 P-A, " TORC Code, Verification and Simplified Modeling Methods," June 1981 (Methodology for Specifications 2.2.1,3.1J.6,3.23,3.2.5)

(13) _ CENPD-225-P-A," Fuel'and Poison Rod Bowing," June 1983 (Methodology fer SWfk9ns

'2.2.1,3.13.6,3.23,3.2.5)

Calvert Cliffs 2. Cycle 12 COLR Page 19 of 22

~

Rev.O l

l (14)

CENPD-266-P-A, "The ROCS and DIT Computer Code for Nuclear Design," April 1983 (Methodology for Specification s 2.2.1,3.1.3.6,3.2.1,3.2.2.1,3.2.3,3.2.5)

(15)

CENPD-275-P-A, "C-E Methodology for Core Designs Containing Gadolinia - Urania Burnable Absorbers," May 1988 (Methodology for Specifications 2.2.1,3.1.3.6,3.2.1,3.2.2.1,3.2.3,3.2.5)

(16)

CENPD-382-P-A, "Methodolo gy for Core Designs Containing Erbium Burnable Absorbers," August 1993 (Met sodology for Specifications 2.2.1,3.1.3.6,3.2.1,3.2.2.1, 3.2.3, 3.2.5)

(17)- CENPD-139-P-A, "C-E Fuel Evaluation Model Topical Report," July 1974 (Methodology for Specifications 2.2.1,3.1.3.6,3.2.1,3.2.2.1)

(18)

CEN-161-(B)-P-A," Improvements to Fuel Evaluation Model," August 1989 (Methodology for Specifications 2.2.1,3.1.3.6,3.2.1,3.2.2.1)

(19)

CEN-161-(B)-P, Sup lement 1-P," Improvements to Fuel Evaluation Model," April 1986 (Methodology for S cifications 2.2.1,3.1.3.6,3.2.1,3.2.2.1)

(20)

Letter from Mr. S. A. McNeil, Jr. (NRC) to Mr. J. A. Tieman (BG&E), dated February 4, 1987, Docket Nos. 50-317 and 50-318, " Safety Evaluation of Topical Report CEN-161-(B)-P, Supplement 1-P, Improvements to Fuel Evaluation Model" (Approval of CEN-161(B), Supplement 1-P)

(21)

CEN-372-P-A, " Fuel Rod Maximum Allowable Gas Pressure," May 1990 (Methodology for Specifications 2.2.1,3.1.3.6,3.2.1,3.2.2.1)

(22)

Letter from Mr. A. E. Scherer (CE) to Mr. J. R. Miller (NRC) dated December 15,1981, LD-81-095, Enclosure 1-P, "C-E ECCS Evaluation Model Flow Blockage Analysis" (Methodology for Specifications 3.2.1,3.2.2.1)

(23)

CENPD-132, Supplement 3-P-A, " Calculative Methods for the C-E Large Break LOCA Evaluation Model for the Analysis of C-E and E Designed NSSS," June 1985

- (Methodology for Specifications 3.2.1,3.2.2.1 and approval of Letter LD-81-095, dated 1

December 15,1981)

(24)

CENPD-133, Sup )lement 5, "CEFLASH-4A, a FORTRAN 77 Digital Computer Program for Reactor Blowc own Analysis," June 1985 (Methodology for Specifications 3.2.1, 3.2.2.1) i (25)

CENPD-134, Supplement 2, "COMPERC-II, A Program for Emergency Refill-Reflood of the Core," June 1985 (Methodology for Specifications 3.2.1,3.2.2.1)

(26)

Letter from Mr. D. M. Crutchfield (NRC) to Mr. A. E. Scherer (CE), dated July 31,1986,

" Safety Evaluation of Combustion Engineering ECCS Large Break Evaluation Model and Acce Stance for Referencing of Related Licensmg Topical Reports" (Approval of CEN 'D-133, Supplement 5 and CENPD-134, Supplement 2)

CENPD-135, Supplement 5-P, "STRIKIN-Ik A Cylindrical Geometry Fuel Rod Heat (27) -

Transfer Program," April 1977 (Methodology for Specifications 3.2.1,3.2.2.1) l

' Calvert Qliffs 2, Cycle 12 COLR

_ Page 20 of 22 Rev.I j

(28)

Letter from Mr. R. L. Baer (NRC) to Mr. A. E. Scherer (CE) dated September 6,1978, "Fvaluation of Topical Report CENPD-135, Supplement 5" (29)

CENPD-137, Supplement 1-P, " Calculative Methods for the C-E Small Break LOCA Evaluation Model," January 1977 (Methodology for Specifications 3.2.1,3r2.2.1)

(30) CENPD-133, Supplement 3-P, "CEFLASH-4AS, "A Computer Program for the Reactor Blowdown Analysis of the Small Break Loss of Coolant Accident," January 1977 (Methodology for Specifications 3.2.1,3.2.2.1)

(31)

Letter from Mr. K. Kniel (NRC) to Mr. A. E. Scherer (CE), dated September 27,1977,

" Evaluation ofTopical Reports CENPD-133, Supplement 3-P and CENPD-137, Supplement 1-P" (32)

CENPD-138, Supplement 2-P," PARCH, A FORTRAN-IV Digital Program to Evaluate Pool Boiling, Axial Rod and Coolant Heatup," January 1977 (Methodology for Specifications 3.2.1,3.2.2.1)

(33)

Letter front Mr. C. Aniel(NRC) to Mr. A. E. Scherer (CE), April 10,1978. " Evaluation of Topical Report CENPD-138, Supplement 2-P" (34)

Letter from Mr. A. E. Lundvall, Jr. (BG&E) to'Mr. J. R. Miller (NRC), dated February 22,1985, "Calvert Cliffs Nuclear Power Plant Unit 1, Docket No. 50-317, Amendment to Operating License DPR-53, Eighth Cycle License Application" (Section 7.3.2 contains Methodology for Specifications 3.1.1.1 and 3.1.1.4 and 3.1.3.6)

(35)

Letter from Mr. D. H. Jaffe (NRC) to Mr. A. E. Lundvall, Jr. (BG&E), dated May 20, 1985, Safety Evaluation Report Approving Unit 1 Cycle 8 License Application (36)

Letter from Mr. A. E. Lundvall, Jr. (BG&E) to Mr. R. A. Clark (NRC), dated September 22,1980, " Amendment to Operating License No. 50-317, Fifth Cycle License Application (Section 7.1.2 contains Methodology for Specifications 3.1.1.2,3.9.1)

(37)

Letter from Mr. R. A. Clark (NRC) to Mr. A. E. Lunivall, Jr. (BG&E), dated December I

12,1980, " Safety Evaluation Report Approving Unit 1, Cycle 5 License Application" (38)

Letter from Mr. J. A. Tiernan (BG&E) to Mr. A. C. Thadani (NRC), dated October 1, j

1986, "Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2, Docket Nos. 50-317 and 50-318, Request for Amendment"(Methodology for Specifications 3.1.3.1)

(39)

Letter from S. A. McNeil, Jr. (NRC) to Mr. J. A. Tieman (BG&E), dated July 7,1987, Docket Nos. 50-317 and 50-318, Approval of Amendm.ents 127 (Unit 1) and 109 (Unit 2)

(Support for Specification 3.1.3.1)

(40), CENPD-188-A, "HERMITE: A Multi-Dimensional Space - Time Kinetics Code for PWR Transients," July 1976 (Methodology for Specifications 2.2.1, 3.1.3.6, 3.2.1, 3.2.2.1, 3.2.3, 3.2.5)

/

s Calvert dbffs 2, Cycle 12 COLR Page 21 of 22 Rev.O L_________-.___

r; i

i (41) 3.1.3.1,3.2.2.1,3.2.3, and the BASES is descr (a)

CENPD-153-P Revision 1.P-A, " Evaluation of Uncertainty in the Peaking Measu, red by the Self Powered, Fixed Incore Dete 1980 (Methodology for Specifications 2.2.1, 3.1.3.6, 3.2.1, 3.2 j

{

(b)

CEN-119(B)-P, "BASSS, Use of the incore Detector System to Monitor Appendix B of Unit 2 Cycle 9 License Application)D (c)

Letter from Mr. G. C. Creel (BG&E) to NRC Document Control Desk, d 318. Reque,st for Amendment, Unit 2 Ninth Cycle (Appendix B contains Methodologies for Specifications 3.1.3.1,3.2.

3.2.5)

(d)

Letter from Mr. S. A. McNeil, Jr. (NRC) to Mr. G. C. Creel (BO&E), dated January 10,1990, " Safety Evaluation Report Approving Unit 2 Cycle 9 L Application" (42)

Lett'er from Mr. D. G. Mcdonald, Jr. (NRC) to Mr. R. 8. Denton g3GE 1995, " Approval to Use Convolution Technique in Main Steam Lme Bre Calvert Chffs Nuclear Power Plant, Unit Nos. I and 2 (TAC Nos. M9 e

, me P