ML20151Y119

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With
ML20151Y119
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/31/1998
From: Katz P, Olsen H
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9809180113
Download: ML20151Y119 (7)


Text

.

7* .

PETc E. KATZ Baltimore Gas and Electric Company Plant General Manager Calvert Cliffs Nuclear Power Plant Calven Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4101 September 15,1998 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 August 1998 Ooerating Data Reoorts The subject reports are being sent to you as required by Technical Specification 5.6.4.

Should you have any questions, please contact Mr. Bruce B. Mrowca at (410) 495-3989.

Very truly yours, j

lll

/

/

/

PEK/HOO/bjd b Attachments cc: R. S. Fleishman, Esgoire Resident Inspector, NRC J. E. Silberg, Esquire R.1. McLean, DNR A. W. Dromerick, NRC J. H. Walter, PSC S. S. Bajwa, NRC P. Lewis, INPO H. J. Miller, NRC K. N. Larson, ANI 9809180113 980831 'e PDR ADOCK 05000317 <-

R PDR ,

dOOCO3 L -

_ s _

OPERATING DATA REPORT Docket No. 50-317 Calvert' Cliffs Un it 1 September 15, 1998 Prepared by Herman O. Olsen .

Telephone : (410) 495-6734 '

REPORTING PERIOD AUGUST 1998 DESIGN ELECTRICAL RATING (NET MWe) 845 MAXIMUM DEPENDABLE CAP'Y (NET MWe) 835 Year- Cumulative This month to-Date to Date l NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 4,306.5 150,062.6 4 2. HOURS GENERATOR ON LINE 744.0 4,255.1 147,145.0

3. UNIT RESERVE SHUTDOWN MOURS 0.0 0.0 0.0 '
4. NET ELECTRICAL ENERGY GENERATED (MWH) 624,067 3,612,419 119,119,008 i

6 d

4 t

. . , , t I

UNIT SHUTDOWNS AND POWER REDUCTIONS -

~

DOCKET NO. . 50-317 UNIT NAME Calvert Cliffs - U1 DATE SeDtember 15.1998 COMPLETED BY Herman O. Olsen TELEPHONE (410)495-6734 REPORTING MONTH Aunust 1998 NO.

DATE TYPE DURATION REASON' METHOD OF CAUSE/ CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN* COMMENTS There were no significant power reductions this month.

' 2 Method:

Reason:

A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Other F- Administrative G - Operational Error H - Other

" ~

o; .

DOCKET NO. 50-317-

['- 2 i 'CALVERT CLIFFS - UNIT l' i September 15,1998 i-5

SUMMARY

OF OPERATING EXPERIENCE Aunust 1998

.The unit operated at 100% power for the entire month.-

v p

i i-L i .-

A

1. .

4 I-

/

\

o

  • 1 i

OPERATING DATA REPORT Docket No. 50-318 Calvert Cliffs Unit 2 September 15, 1998 Prepared by Herman O. Olsen Telephone : (410) 495-6734 REPORTING PERIOD AUGUST 1998 DESIGN ELECTRICAL RATING (NET MWe) 845 MAXIMUM DEPENDABLE CAP'Y. (NET MWe) 840 Year- Cumulative This month to-Date to Date

1. NUMBER OF HOURS REACTOR WAS CRITICAL 584.2 5,473.6 142,464.1
2. HOURS GENERATOR ON LINE - 575.8 5,465.2 140,701.3
3. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
4. NET ELECTRICAL ENERGY GENERATED (MWH) 464,303 4,710,118 114,665,228 I

1 l

l 1

)

.)

I 1

a

- UNIT SHUTDOWNS AND POWER REDUCTIONS ,

~

'J ~

DOCKETNO; 50-318- ~.

UNIT NAME - Calvert Cliffs-U2 '- s

-DATE =f__ -- 15.1998 ,

- COM'PLETED BYa Herman O. Olsen

. TELEPHONE' ~ '(410)495-6734-

- REPORT MONTH Amnest 1998

. NO.~ DATE TYPE DURATION -REASON'-  ! METHOD OF. CAUSE/ CORRECTIVE ACTIONS '

F: FORCED (HOURS) SHUTTING '

S: SCHEDULED DOWN* COMMENTS98-001 07/23/98 F 168.2 ~- A 4 The unit began the month in mode 5 (cold shutdown) '

following the manual trip from 100% due to a steam leak from a 2" vent line on 22 Moisture Separator'-

Reheater. Repairs were made to the affected piping and inspections were made of similar piping . Changes to .

the flow accelerated corrosion detection program are being made to include inspection of this type of piping' application. LER 98-004 dated 08/24/98 provides additional details of the actions taken. The unit was retumed to service at 0013 on 08/08/98.

' 2 Method:

Reason:

A - Equipment Failure Manual B - Maintenance or Test 2 - Manual Scram

. C - Refueling Automatic Scram.

D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Other.

F- Administrative G - Operational Error H - Other i

-. - . . . . . . - . ..n- , .m.--- . - . - - . . . . . . . . . . , , , + . ~ ~ , - n- - , .

.. _ . _ . .. __ _ _ _ . . _ _ _ . _.m.

=

DOCKET NO. 50-318 -

CALVERT CLIFFS - UNIT 2

- September 15,1998 -

2

s

SUMMARY

OF OPERATING EXPERIENCE August 1998 The unit began the month in mode 5 (cold shutdown) with repairs being made to a leak between the pressurizer and a level transmitter instrument leg. Repairs were completed and plant heatup was

- commenced on 08/04/98.

i The reactor was taken critical on 08/07/98 at 1547 and was paralleled to the grid on 08/08/98 at 0013.

The unit reached 100% power at 1700.

Power reductions were performed to conduct waterbox cleaning on 08/14/98,08/19/98 and 08/30/98.

The unit was operating at 100% at the end of the month.

i I

a 4

, . .--