Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With
ML20198B263
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 11/30/1998
From: Katz P, Olsen H
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9812180125
Download: ML20198B263 (7)


Text

{{#Wiki_filter:{ i l ~* PETER E. KATZ Baltimore Gas and Electric Company Plant General Manager Calven Cliffs Nuclear Power Plant -- Calvert Cliffs Nuclear Power Plant 1650 Calven Cliffs Parkway Lusby, Mary and 20657 410 495-4101 s December 15,1998 l U. S. Nuclear Regulatory Comrnission Washington, DC 20555 A'ITENTION: Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 November 1998 Onerating Data Rengrts The subject reports are being sent to you as required by Technical Specification 5.6.4. r j Should you have any questions, please contact Mr. Bruce B. Mrowca at (4 (0) 495-3989. l Very truly yours, Q L PEK/HOO/bjd Attachments t cc: R.'S. Fleishman, Esquire Resident inspector, NRC J. E. Silberg, Esquire R.1. McLean, DNR A. W. Dromerick, NRC J. H. Walter, PSC S. S. Bajwa, NRC P. Lewis, INPO 'W H. J. Miller, NRC K. N. Larson, ANI , U, t 9812190125 981130 DR ADOCK 05000317 PDR L

1

                          • ++******4.**************
                                                            • c********

OPEPATIU(3 DATA REPORT Docket No. 50-317 Calvert Cliffs Unit 1 December 15, 1998 Prepared by IIerman O. Olsen Telephone : (410) 4 95-6 734 5 REPORTING PERIOD NOVEMBER 1998 DESIGN ELECTRICAL RATING (NET MWe) 845 MAXIMUM DEPENDABLE CAP'Y (NET MWe) 835 Year-Cumulative This month to-Date to Date

1. NUMBER OF HOURL REACTOR S

exITICAL 720.0 6,431.5 152,247.6

2. HOURS GENERATOR ON LINE 720.0 6,440.1 149,330.0
3. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
4. NET ELECTRICAL ENERGY GENERATED (MWH) 623,085 5,479,244 120,985,833

z. N 3 ~iUNIT SHUTDOWNS AND POWER REDUCTIONS - 2 2.- DOCKET NO.i 50-317' . UNIT NAME Calvert ClitTs - UI - DATE- ' Decembbr 15.1998 COMPLETED BY Herman O. Olsen1 TELEPHONE (410)495-6734 ~ REPORTING MONTH November 1998 9 NO. 'i l 'i DATE ~ TYPE . DURATION REASON' METHOD OF CAUSE/ CORRECTIVE ACTIONS F: FORCED (110URS) . SHUTTING 2 S: SCIIEDULED -DOWN . COMMENTS = t There were no shutdowns this month. [ 'v i I. [ i 8 l l l-Reason: Method: A - Equipment Failure 1 - Manual - B - Maintenance er Test 2 - Manual Scram. C-Refueling 3 - Automatic Scram. 4 D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Other F-Administrative G - Operational Error H - Other =

l ^ ' OKET NO. 50-317 CALVERT CLIFFS - UNIT 1 Deceinber 15; 19?S

SUMMARY

OF OPERATING EXPERIENCE November 1998 The unit operated at 100% power for the entire month.

_.._._.-._._.,...-._..m 'i t b A; /. ( h l -{ : t ,l li l- ? -l l. s.****.************************************* l. OPERATING DATA REPORT l.: l l-Docket No. 50-318 e f-Calvert Cliffs Unit 2 l December 15, 1998 i. (' Prepared by Herman O. Olsen Telephone : (410) 495-6734 i 1 REPORTING PERIOD NOVEMBER 1998 c DESIGN ELECTRICAL RATING '(NET MWe) 845 l. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 840 i Year-Cumulative This month to-Date to Date- ~ j- . 1. NUMBER OF HOURS-REACTOR WAS CRITICAL 720.0 7,658.6 144,649.1 j. . 2 2 HOURS GENERATOR ON LINE 720.0' 7,650.2 142,886.3 l 3; UNIT RESERVE SRUTDOWN HOURS 0.0 0.0 0.0 l l'

4. NET ELECTRICAL ENEMY GENERATED (MWH) 625,212 6,576,042 116,531,152

(<- I l i-l l~ r i s 6 p g. r q.r--.a6.-~= n ~ 7 t--- 5 ? 1wg., irv 'e--

.v .a. g3, ~ UNIT SHUTDOWNS AND POWER REDUCTIONS ' +

a y.

-- DOCKET NO.~ 50-318 - ~C - UNITNAME. Calvert Cliffs-U2 - - DATE December 15.1998 "y COMPLETED BY - Herman O.' Olsen ' TELEP!!ONE. .(410)495-6734' REPORT MONTH November 1998 NO. DATE ' TYPE DURATION ' REASON ' METHOD OF CAUSE/ CORRECTIVE ACTIONS ' F:. FORCED (HOURS) ' SifUTTING S: SCHEDULED DOWN* 1 COMMENTS '+ There were no shutdowns this month. t L 4 h v s i 2 Reason: Method: A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram. C - Refueling 3 - Automatic Scram. D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Other F-Administrative G - Operational Error H - Other 3 ..-1-_., .---. a

.~ ... ~. _. _..... _. _. _..... _. _ _. .~ _._.... _.. _ _. l- -h, ' DOCKET NO,50-318

CALVERT CLIFFS - UNIT 2 l

L-Decerinber 15',1998 l '^

SUMMARY

OF OPERATING EXPERIENCE November 1998 1 t l The unit began the month at 100% power, o Power was reduced to 82% on i1/27/98 at 2106 for Main Turbine Valve Testing. Power was restored to 100% on i1/28/98 at 0245. The unit operated at 100% power for the remainder of the month. l j a l' i l i I L (:'e l l! =13 l, 7 s W 4 l I' t ( l l' o' .. -,}}