Special Rept:On 920501,Unit 1 Svc Water Room Was Maintained Open to Support Work Activities During Unit 1 Refueling Outage.Fire Door Will Be Closed Prior to Startup Scheduled for mid-Jul 1992
ML20101B755
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 05/28/1992
From: Denton R
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9206050102
Download: ML20101B755 (2)


Text

. _ _ _

.v 1

/N D ALTIMORE GAS AND ELECTRIC CHARLES CENTER e P.O. BOX 1475 e BALTIMORE. MARYLAND 21203 1475 9 r osvtc9 cr4tnAt uAhaotn CAIvint Clif f S May 29,1992 U. S. Nuclear Regulatory Commission Washington,DC 20555 ATTENTION:

Document Control Desk SUIDECT:

Calvert Cliffs Nuclear Power Plant Unit No.1; Docket No. 50 317 Fke Detection Instrumentation Special Repcrt Technical Speci0 cation 3.7.12. ACrlON Statement a Gentlemen:

Per the requirements of Technical SpeciGeation 3.7.12 ACrlON Statement a, we herchy sub'. nit the attached Special Report concerning inoperable Orc barrier penetrations, specifically Fire Door No. 214 in the Unit 1 Savice Water Room (Room 226) in the Auxiliary Building was inoperable for greater than 7 days.

Should you have any further questions regarding this matter, we will be pleased to discuss them with you.

Very truly yours, n

?

JW RED / DEB /CDS/bjd Attachment cc:

D. A. Brune, Esquire J. E. Silberg, Esquire R. A. Capra, NRC D. O. Mcdonald, Jr., NRC T. T. Martin, NRC l

P. R. Wilson, NRC p'/ y.f3 R.1. M: Lean, DNR f

h J,11. Walter, PSC g

1

- g[Opggg. '.,

7

9 A'ITACilh1ENT Q PENI:TRATION Fille IIARRIERS SPECI Al, REPORT 1

IIACKGly) UNI)

On May 1,1992, Fire Door No. 214 to the Unit 1 Senice Water Room was maintained open to support work activities during the Unit I refueling outage. This door must remain open to move equipment and material into the Senice Water Room to support Unit 1 outage related piping modifications within the room. As a result of this activity, the fire door will remain open until piping modifications are completed.

As specified by Technical Specification 3.7.12, ACTION Statement u, a Special Report must be issued to the Commission pursuant to Technical Specification 6.9.2 ff a fire door in a fire zone boundary protecting safe shutdown areas is not restored within 7 days. Currently, the fire door is to be rettored prior to Unit 1 startup. As required, this Special Report addresses actions to be taken, the cause of inoperability, and clans and schedule for restoration of the Unit 1 Senice Water Room fire zone boundary to an operable status.

EITECT ON UNIT OPERATIOE On Mcy 1,1992 with Unit 1 defueled, Fire Door No. 214 was opened in the Unit 1 Senice Water Room. The fire door in this room is addressed by Technical Specification 3.7.12. In accordance with this Technical Specification, ACTION Statement a was entered and a continuous fire watch was establisl.ed on one side of the open fire door.

In addition to the continuous fire watch, the room's automatic sprinkler system remains in senice which mitigates the temporary inoperability of the fire barrier. Also, a lire watch is required by Calvert Cliffs procedures during welding / cutting / grinding operations in the room.

PIANS AND SCllEDUldiS Upon completion of the work inside the Senice Water Room ine fire door will be closed rme.ing it to operable status. This will occur prior 60 Uni' 1 startup scheduled for midduly 1992.