ML20042F448
| ML20042F448 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 05/01/1990 |
| From: | Mccormick M PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9005080333 | |
| Download: ML20042F448 (4) | |
Text
_
0 PHILADELPHIA ELECTRIC COMPANY LIMF. RICK GENER ATING ST ATION P. O. BOX A SAN ATOG A PENNSYLVANI A ID464 (215) 3271200 axv. 2000 M. J. McCO RMICM. Ja., P E.
u....7^."'.".'".'.*..'"......
May 1, 1990 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPP-85 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington,.DC 20555
SUBJECT:
Limerick Generating Station (LGS), Units 1 and_2 Response to the Request for Transient Response Implementing Plan (TRIP) Procedures and Related Reference Material ~
Dear Sirs:
This letter is to inform you that copies of the LGS TRIP Procedures and related reference materials were provided to Mr.
D. J. Florek, NRC Region I, on April 30, 1990.
These documents were provided in response to a letter dated March 27, 1990, from R. M. Gallo (NRC), to C. A. McNeill, Jr. (PECo), regarding preparation for a planned NRC inspection'of the LGS TRIP Procedures._ The items included in the delivered package are listed in the attachment to this letter.
I If you have any question or require additional information, please do not hesitate to contact us.
L Very tr ly yours, l
e
,c DBN:cah ATTACIIMENT cc:
T. T. Martin, Administrator, Region I, USNRC Q
T. J. Kenny, USNRC Senior Resident Inspector 9005080333 9005 1 I
ADOCK0500p,{3[2f i
pga et
l bcct D. M.* Smith - 52C-7 G. M. Leitch - 200 M. J. McCormick, Jr. - A5-1 G. D. Edwards - AS-1 G. A. Hunger, Jr. -52A-5 J. M. Madara - 53A-1 J. A. Muntz - 336 G. L. Madsen -
SB3-4
.K.
J. Walsh - C4-1 R. J. Lees - 53A-1 R. M. Krich - 52A-5 Secretary,:NCB - 52C-7 (4 copies)
Commitment Coordinator - 52A-5 PA DER BRP Inspector - 335 Correspondence Control Desk DAC i
l
'I
.n.i
c I
o ATTACHMENT' 4
REFERENCE MATERIAL PROVIDED TO THE NRC REGION I TRIP PROCEDURE INSPECTION 1.
Complete abnormal operating procedure indices for both units.
A.
TRIP (T) Procedures P.
Operational Transient (OT)l Procedures 1
C.
Off Normal (ON) Procedures D.
Special Event (SE). Procedures E.
Event (E) Procedures 2.
One full size copy of the T-100 series TRIP flow charts colorized like in the Control Room.
3.
Two additional readable copies of the T-100 series TRIP flow charts for both units.
4.
One copy of all. procedures referenced.in the TRIP flow charts.
A.
T-200 series TRIP procedures (Narrative Emergency Procedures)
B.
System Operating Procedures
. S52.1.B, S09.1.A, S41.3, S4B.l.B, SSI.B.A, SS2.1.B, S57.3.B, S57.5.A, S58.1.B, S58.2.A, S75.1.A, S76.9.A C.
General Plant (GP) Procedures GP-2, GP-3, GP-8, GP-ll
~
i D.
OT-101 l
E.
Chemistry Procedure CH-222 l
F.
Emergency Preparedness (EP) Procedure EP-101, EP-304 G.
ON-lll 5.
Abnormal Operating Procedures OT, ON, SE and E Procedures t
I
.y i
l 1
,.4 6.
Procedure Generation Package including A.
Plant Specific Technical Guide (PSTG)
B.
Administrative Procedure A-94, Preparation of Transient Response Implementation Plan (TRIP) Procedures C.
Training Plan for the Emergency Operating Procedures (EOPs) 7.
The PSTG which is the deviation document that explains the differences between the BWR Owners Group EOP Guidelines ~and the PSTG.
8.
Simulator malfunction book 9.
Lesson plans and simulator scenarios used in the simulator for training on the TRIP procedures.
I x
___-__