RIQRITY PACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET N FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION WALDEN,J.V. Rochester Gas 6 Electric Corp.

WIDAY,J.A. Rochester Gas 6 Electric Corp. P RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for May 1995 for Ginna NP . /950606 ltr ~

DISTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specks NOTES:License Exp date in- accordance with 10CFR2,2.109(9/19/72). 05000244 p RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 PD 1 1 JOHNSON,A 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 KTE . 01 1 1 NRR/DISP/PIPB 1 1 NRR/DOPS70ECB 1 1 RGN1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

C U

N NOTE TO ALL RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACTTIIE DOCUWIENT CONTROL DESK, ROOK/ PI.37 (EXT. 504.2083 ) TO ELIAIINATEYOUR 4'AVE~ FRONI DISTRI!3UTION LISTS FOR DOCL'MEN'I'S YOU DON "I'L'ED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

7

~ V l/ized~ y zzz l 1I ~ Ow ~ 1 ~

ZZ::."

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TKI.KPHONK ARKA COOK 7IO 546.2700 GINNA STATION June 6, 1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for May, 1995 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No.'0-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of May, 1995.

Very truly yours, s h A. Wid ant Manager JAW:tjn Attachments c: Mr. Thomas T. Martin NRC (1)

I

'7506200025 9'50531 PDR 'ADOCK 05000244 R PDR ZpPf I

OPERATING DATA REPORT 50-244 Jun 6 1995 COMPLETED BY John V. Walden TELEPHONE (315)5244446 Ext.588

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT
2. Reporting Period: Ma 1995
3. Licensed Thermal Power (MWt): 1520
4. Nameplate Rating (Gross MWe): 490
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Capacity (Net MWe): 470 8., if Changes Occur in Capacity Rating (items Number 3 Through 7) Since Last Report, Give Reason:
9. Power Level to Which Restricted, If Any (Net MWe:
10. Reason For Restrictions, If An:

This Month Yr.-to-Date Cumulative

11. Hours in Reported Period 744.0 3623.0 223631.0
12. Number of hours Reactor Was Critical 690.2 2746.5 178562.2
13. Reactor Reserve Shutdown Hours 0.0 0.0 . 1687.6
14. Hours Generator On-line 658.3 2685.3 175657.6
15. Unit Reserve Shutdown Hours 0.0 0.0 8.5
16. Gross Thermal Energy Generated (MWH) 934804.0 3942688.0 249457925.0
17. Gross Electrical Energy Generated (MWH) 316061.0 1333378.0 82567430.0
18. Net Electrical Energy Generated (MWH) 300318.0 1267669.0 78376899.0
19. Unit Service Factor (%) 88.5 74.1 78.5
20. Unit Availability Factor (%) 88.5 74.1 78.6
21. Unit Capacity Factor (using MDC Net) (%) 85.9 74.4 75.7
22. Unit Capacity Factor (using DER Net) (%) 85.9 74.4 75.7
23. Unit Forced Outage Rate (%) 0.0 0.0 5.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuelin and Maintenance Started 3/26/95 Finished 5/4/95 Duration 39 da

25. If Shutdown At End of Report Period. Estimate Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
  • CUMULATIVETOTAL COMMENCING JANUARY 1. 1975 CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: June 6 1995 COMPLETED BY:

John Walden TELEPHONE: 315 524-4446 Ext. 588 MONTH Ma 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

17. 474 2 ~ 18. 474
3. 19. 474
4. 36 20. 475
5. 211 21. 475 6.

7.

8.

404 448 474 22.

23 24.

'75 474 475

9. 474 25. 475
10. 475 26. 475 475 27. 475 12; 475 28. 476
13. 475 29. 476
14. 475 30. 475
15. 474 31. 475
16. 474 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. 'ompute to the nearest whole megawatt.

DOCKET NO. ~0-244 UNlTNAhlE R.E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS COh)PLETl:D BY V g hn V. Walden TELEPlIONf( 3l5 ) 524-4446 Ext. 588 I

rI4 0 0I >> c c c v Licensee 0 IA Cause & Corrective 0 c Em c No. Date 0 I0 0 0

0 0>> 0 Event 0 0 0 0 0 0 Action to 0 0 0 Prevent Recurrence I ~

X.' 0 In C Report II cA (J O

0 O

5-03 3/26/95 S 937.7 Continuation of Annual Refueling Shutdown 1

F: Forced Reason: hletbod: Fxhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1 hhfanual for Preparation of Data B-Maintenance or Test 2-hlanual Scram. Entry Sheets for Licensee C-Rcfucling 3-Automatic Scram. Event Rcport (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative G.Operational Error (Explain)

REV. 4/SS 4949 El-Other (Explain) Exhibit 1 - Same Source

NARRATXVE SVMIEMY OP OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: J ne 6 1995 COMPLETED BY:

John Walden TELEPHONE: 315 524-4446 Ext. 588 MONTH Ma 1995 On March 26, the unit was taken off line as scheduled for its annual maintenance and refueling outage. The unit. was placed on line on May 4. Total outage duration was 39.1 days. Average power for the month following power ascension was 974.

"E J

'2 0 ~

1 e ~ ~

4