Monthly Operating Rept for Nov 1994 for Re Ginna Nuclear Power Plant.W/941205 Ltr
ML17263A871
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/30/1994
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9412120195
Download: ML17263A871 (7)


Text

PR.ICOR.I EY' ACCEI ERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION NALDEN,J.V. Rochester Gas 6 Electric Corp.

WIDAY,J.A. Rochester Gas 6 Electric Corp. P RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operat' for Nov 1994 for RE Ginna Nuclear Power Plant. 1205 r.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 R RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 PD 1 1 JOHNSON,A 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 1 1 NRR/DISP/PIPB-E 1 1 RR/DORS/OEAB 1 1 RGNl 1 1 EXTERNAL: LITCO BRYCE, J H 1 1 NOAC NRC PDR 1 1 D

0 C

U YOTE TO ALL"RIDS" RECIPIEY'TS:

PLEASE HELP US TO REDUCE 'O'ASTE! COYTACT'I'IIE DOCL'ifEYTCONTROL DESK. ROOK1 PI-37 (EXT. 504- 083 ) TO ELIhflYKTLYOUR i'AifLPl<Oil DISTRIBUTIOYLISTS I'OR DOCL'bfEi'I'S 5'OI.'O.'4"I'YI ED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Z IIIII l II~ Oa IF &

>'z(z zs erzzz r

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TCLCPHONC ARCA COOC 7IC 546-2700 GINNA STATION December 5, 1994 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for November, 1994 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of November, 1994.

4 Very truly yours, a.d.

se h A. Wid y Plant Manager JAW:tjn Attachments c: Mr. Thomas T. Martin NRC (1)

F 94i2i20i95 94ii30 PDR ADOCK 05000244 R PDR

50-244 December 5, 1994 COMPLETED BY V:U John V. Waldon TELEPHONE (315)524-444B Ext.588 0 GST S

l. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes:
2. Reporting Period: Novombor, 1994
3. Liconsed Thermal Power (MWt): 1520
4. Nameplate Rating (Gross MWo): 490
5. Design Electric Rating (Net MWe): 470 B. Maximum Dependable Capacity (Gross MWo): 490
7. Maximum Dependable Capacity (Not MWo): 470
8. If Changes Occur in Capacity Rating (Items Numbor 3 Through 7] Since Last Report, Give Reason:
9. Power Level to Which Restricted, If Any (Not MWo):
10. Reason For Restrictions, If Any:

This Month Yr.-to-Date Cumulative""

11. Hours in Reported Period 720.0 801 B.O 219284.0
12. Number of hours Reactor Was Critical 720.0 8545.1 176071.6
13. Reactor Reserve Shutdown Hours 0.0 0.0 1887.8 "
14. Hours Generator On-line 720.0 8475.9 172228.3
15. Unit Reserve Shutdown Hours 0.0 0.0 8.5 5
18. Gross Thermal Energy Generated (MWH) 1081351.0 9443713.0 24439972B.O
17. Gross Eiectrical Energy Generated (MWH) 38427B.O 3173512.0 80858871.0
18. Not Eloctrical Energy Generatod (MWH) 348843.0 3014934.0 78750307.0
19. Unit Service Factor (%) 100.0 80.8 78.5
20. Unit Availability Factor (%) 100.0 80.8 78.8
21. Unit Capacity Factor (using MDC Net) (%) 102.4 80.0 75.8
22. Unit Capacity Factor (using DER Net) (%) 102.4 80.0 75.8
23. Unit Forced Outage Rate (%) 0.0 5.7
24. Shutdowns Scheduled Over Next B Months (Typo, Dato and Duration of Each):

Refueling and Maintonanco, Start 3/28/95, Duration 3B days

26. If Shutdown At End of Report Poriod, Estimate Dato of Startup:
28. Units in Tost Status (Prior to Commercial Operation): Forcast Achiovod INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

'UMULATIVETOTAL COMMENCING JANUARY 1, 1975

" 'UMULATIVETOTAL COMMENCING NOVEMBER 8, 19B9

0 AVERAGE DAILY UNIT. POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: December 5 1994 COMPLETED BY:

Zohn Walden TELEPHONE: 315 524-4446 Ext. 588 MONTH November 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1~ 480 17. 482

2. 481 18. 482 3 ~ 481 19. 482 4 ~ 481 20. 482
5. 481 21. 481 6.

7 8.

~

481 481 481 22.

23 24.

'82 482 483

9. 481 25. 483
10. 481 26. 482 482 27. 483
12. 482 28. 482
13. 482 29. 482
14. 482 30. 482
15. 482 31.
16. 482 INSTRUCTIONS On this format, list the average daily unit, power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

A DOCKI:.T NO. 50-244 UNiq NAMI: R.E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS COhlPLETI:.D BY John V. Walden"

, 588 1'I'. Ll;PI lON E 0

Dl e- C 0 c v licensee Em Cl ul Cause & Corrective 0 E c Ho. Date 0 o > cc Event 0 D Action to 0 0 E 0 0 Report Prevent Recurrence O~ tx! Oan D II lA Q U

0 O

F: Forced Reason: hlethod: Fxhibit G - instructions S: Scheduled A-Etluipment Failure (Explain) 1-hfanual for Preparation of Data B-hlaintenance or Test 2-hlanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

REV. 4/SS 4949 H-Other (Explain) Exhibit 1 - Same Source

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: December 5 1994 COMPLETED BY:

John Walden TELEPHONE: 315 524-4446 Ext. 588 MONTH November 1994 During the month of November the average power was 99%.