PR.LC)R.I EY' ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION PLOOF,R. Rochester Gas & Electric Corp.

WIDAY,J.A. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operat' for Sept 1994 for RE Ginna Nuclear tr.

Power Plant 941007 DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs) f ENCL Q SIZE:

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 PD 1 1 JOHNSON,A 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE CENTER 0 1 1 NRR/DORS/OEAB 1 1 NBA'-PMA8j'-INC = 1 1 RGNl 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE KVASTE! CONTACI THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 504-2083 ) TO ELII4II.ATE YOUR NAME PRO%I DISTRIBUTION LISTS I'OR DOCI 'ME. JTS YOU DON"I'v'EED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Nr ~

Lail Owlaa I / //I///l///

//I// 'i/lllEuà ZZ::.::

ROCHESTER GAS ANDELECTRIC CORPORATION 89EASTA VENUE, ROCHESTER, N.Y. 14649<001 JOSEPH A. WIDAY TELEPHONE Plant Manager AREA CODE 7lB 546-2700 r lnna Nucloar Plant GINNA STATION October 7, 1994 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for September, 1994 Operating Status Information R'. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of September, 1994.

Very truly yours, s

a.d h A. Wid Plant Manager JAW: jkl Attachments c: Mr. Thomas T..Martin NRC (1)

J i'U~'=('7t410170121 940930 PDR R .

ADODK 05000244

. PDR- gpf

t OPERATING DATA REPORT t DOCKET NO. 50-244 DATE: October 7, 1994 COMPLETED BY:

Ronald D. Ploof TELEPHONE (315)5244446 Ext.673 OPERATING STATUS

1. Unit Na R.E. GINNA NUCLEAR POWER PLANT Notes: On 9/10/94 the unit reduced
2. Reporting Perhd: September, 1994 power to 50% for 24 hrs in order to
3. Lkensed Thermal Power (MWI): 1520 repair a condenser tube leak
4. Nameplate Rating (Gross MWe): 490
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Capacity (Net MWe): 470
8. If Changes Occur In Capadty Rating (Items Number 3 Through 7) Since Lest Report, Give Reason:
9. Power Level to Which Restrkted, If Any (Net MWe):
10. Reason For Restrktions, If Any:

This Month Yr.-to-Date Cumulative

11. Hours In Reported Period 720.0 6551.0 217799.0
12. Number of hours Reactor Was Critical 720.0 1165.0 1165.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-line 720.0 5010.9 '70762.9
15. Unit Reserve Shutdown Hours 0.0 0.0 85 ~
16. Gross Thermal Energy Generated (MWH) 1060583 7246875 242202888
17. Gross Eledrical Energy Generated (MWH) 351720 2435374 80118733
18. Net Electrkal Energy Generated (MWH) 334120 2312587 76047960
19. Unit Service Factor (%) 100.0 76.5 78.4
20. Unit AvailabilityFactor (%) 100.0 76.5 78.4
21. Unit Capadty Factor (using MDC Net) (%) 75.1 75.4
22. Unit Capadty Fador (using DER Net) (%) 75.1 75.4
23. Unit Forced Outage Rate (%) 0.0 5.7 0.2
24. Shutdovms Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refueling and Maintenance, Start 3/19/95, Duration 40 days

25. If Shutdovm At End of Report Period, Estimate Date of Startup:
26. Units ln Test Status (Prior to Commerdal Operation): Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION CUMULATIVETOTAL COMMENCING JANUARY 1, 1975 CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: ~10 7 94 COMPLETED BY:

Ron loof TELEPHONE: 315 524-4446 Ext. 673 MONTH Se tember 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 466 17. 469

2. 467 18. 469
3. 468 19. 470
4. 468 20. 469
5. 468 21. 470
6. 468 22. 469
7. 468 23. 472
8. 469 24. 478
9. 469 25. 479
10. 271 26. 480 463 27. 480
12. 469 28. 479
13. 470 29. 477
14. 469 30. 476
15. 471 31.
16. 470 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

DOCKET NO. t UNIT NAMI:. R.E. GINNA NUCLEAR POWER PLANT DATF 10 07 94 'll>

UNIT SHUTDOWN AND POWER REDUCTIONS Cohlp LI'.1'I'.D BY Ron P1oo 1'I'.LEPIIONE 315 524-4446, Ext. 673 c CC Ol c u

>>0 l.icensee cQ ill Cause ttl Corrective 0 C 0

Em c Ho. Date O o 0 o o>> Event O Vl Cl 0 Q

o Action to I- n-

~

Cl 0 l/l E

C Report l" lA o

(J E Prevent Recurrence n0 94-09 9/10/94 F 24.7 Repair Condenser Tube Leak F: Forced Reason: hlethod: Fxhibit G - Instructions S: Scheduled A-Ecluipment Failure (Explain) 1-hlanual for Preparation of Data B-hlaintenance or Test 2-hlanual Scram. Entry Shccts for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training gt License Examination F-Administrative G-Operational Error (Explain)

Rtv. 4/85 4949 Fl-Other (Explain) Exhibit I - Same Source

0 C NARRATIVE

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: ~10 7 94 COMPLETED BY:

Ron P oof TELEPHONE: 315 524-4446 Ext. 673 MONTH Se tember 1994 During the month of September, the average power level was 97%.

On September 10, the unit reduced power to 49~ to repair a condenser tube leak. The unit was returned to full power on September 11.