MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
AVERAGE DAILYUNIT POWER LEVEL Nov. 8, 1980 COMPLETED IIY V. T. Ch3.1SO>
4 MONTH OCTOBER~ 1980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL
{MWe.Net) (MWe-Net)
I 628 17 627 18 631 19 4 636 20 62 21 22 24 25 10 27 I'2 28 13 59 30 15 31 16 INSTRUCTIONS On this format. list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawat t.
(o/77)
OPERATING DATA REPORT, DOCKET NO.
DATE 39?~~180 COMPLETED 8Y V.T. Chilson TELEPHONE ~305~5-3824 OPERATING STATUS Turke Poiat Unit No. 3 Notes- Unit No. 3'perated at I Unit Name
~
o approximately 9?X R.P. until
- 2. Reporting Period:
2200 the unit was removed'rom
- 3. Licensed Thermal Power (MWt): service on Oct. 6,1980, for
- 4. Nameplate Rating (Gross MWe): 760 scheduled Steam Generator
- 5. Design Electrical Rating (Net MWe): 693 Tube Inspection Program,
- 6. Maximum Dependable Capacity (Gross MWe): 680 maintenance aad inspections.
- 7. Maximum Dependable Capacity (Net MWe): 646
- 8. IfChanges Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe): NONE
- 10. Reasons For Restrictions, lf Any:
This Month Yr..to-Date Cumulative I I. Hours In Reporting Period /45;0 7 320;0 69 321i6 53 090.4
- 13. Reactor Reserve Shutdown Hours -a- 213.4
- 14. Hours Generator On-Line 51 338;6
- 15. Unit Reserve Shutdown Hours >>0- 121.8
- 16. Gross Thermal Energy Ge'netated (MWH) 257 027 12 225 989 103 694 623
- 17. Gross Electrical Energy Generated (MWH) 79 650 3 844 350 32 925 350
- 18. Net Electrical Energy Generated (MWH) 72 844 3 641 796 31 163 890
- 19. Unit Service Factor 16.3 77 ' 74.1
- 20. Unit Availability Factor 16.3 7?.2 74.2
- 21. Unit Capacity Factor (Using MDC Net) 15.1 77.0 69.9
- 22. Unit Capacity Factor (Using DER Net) 14.1 71.8 64.9
- 23. Unit Forced Outage Rate 1.2 2.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each l:
Refuelin maintenance and ins ections March 1 1981 Ma 10 1981.
- 25. IfShut Down At End Of Report Period. Estimated Date of Startup: November 1 1980.
- 26. Units ln Test Status (Prior to Commercial Operation): Forecast . Achieved INITIALCRITICALITY INITIALELEGTRICITY > ~i~a i ' ~ ~ ~ ~
COMMERClALOPERATlON
('>/77)
UNIT SHUTDOWNS AND POIVER REDUCTIONS 1980 COhI PLETED BY REPORT MONTII OCTOBER PI Liccnsec c!D El Cl Cause & Corrective No. Dale Vl r3 Event Q Action to Q
Report
~ C ~ Prevent Rccurrcnce 19 80-10-06 S 623.7 B N/A HB HTEXCH Unit was removed from service for (P) scheduled Steam Generator Tube In-spection Program, maintenance, and inspections. (Nuclear and Non-nuclear systems) 3 F: Forced Reason: hlcthod: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I.Manual lor Preparation of Data B-h(alntenance or Test . 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Autotnatic Scram. Event Report (LER) File (NUREG-
!~
D-Regulatory Restriction 4.Other (Explain) 016I )
~ E-Operator Training & License Examination F-Administrative
'!)
G.Operational Error (Explain) Exhibit I - Saute Source
/77) II Other (Explain)
AVERAGE DAlLYUNIT POWER LEVEL DOCKET NO.
UNIT Nov. 8 1980 COMPLETED 8Y V. T. Chilson TELEPHONE MONTH OCTOBER P 1 9 8 0 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAlLYPOWER LEVEL (MWe-Net) (MWe-Net I 17 627 630 18 621 6 4 19 625 20 626 639 626 638 652 '24 641 651 587 10 26 221 641 28 641 13 641 29 626 14 643 30 619 15 31 612 16 NOTE: Average daily power level greater than 646 MWe due to cooler condenser cooling INSTRUCTIONS water.
On this format. list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole rnegawat t.
(n/77)
OPERATING DATA REPORT DOCKET NO.
DATE Eov.8 19 0 COMPLETED BY Z 'Kg~on TELEPHONE ~~~2-3824 OPERATING STATUS
- 1. Unit Name: Turke Point Unit No. 4 Notes- Unit No. 4 operated at
- 2. Reporting period: October, 1980 approximately 100X R.P., ex-
- 3. Licensed Thermal Power (MWt):
cept for outage of 0'ct.25-26
- 4. Namephte Rating (Gross MWe): 760 1980; and load restriction t 50X R.P. on Oct.26-27, 1980,
- 5. Design Electrical Rating (Ne! MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
after the unit was returned to service.
- 7. Maximum Dependable Capacity (Net MWe):
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, If Any:
Thh Month Yr.-to-Date Cumuhtive II. Hours In Reporting Period 7 320.0 63 049.0 Of Hours Reactor 742.9 5 995.0 46 822.8 Jt=
- 12. Number Was Critical
- 13. Reactor Reserve Shutdown Hours 12.3 166.6
- 14. Hours Generator On-Line 45 088;9
- 15. Unit Reserve Shutdown Hours 12.3 31.2
- 16. Gross Thermal Energy Generated (MWH) 1 582 803 12 790 137 94 009 117
- 17. Gross Electrical Energy Generated (MWH) 481 620 3 961 560 29 865 038 28 284 899
- 19. Unit Service Factor 99.6 80.7 71.5
- 20. Unit Availability Factor 99.6 80.9 71.6
- 21. Unit Capacity Factor (Using MDC Net) 94.8 79.4 69.7
". Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0.4 0.3 2.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
e uelin maintenance and ins ections November 9, 1980 January 10, 1981.
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY'OMMERCIAL OPERATION
('>/77)
DOCKET NO. 50 '2&l UNIT SIIVTDOWNS AND POWER REDUCTIONS UNITNAME Turke Point IJ it No.4 REPORT MONT(I OCTOBER 1980 Licenscc C< gtA Cause Ec Corrective No. Date 0 4 Event Actiun tu U~ c Repurt > rir G O Prevent Recurrence
~ Ch d ~ i 18 80-10-.25 P 33. A 3 N/A ED Unit was tripped by the reactor pro-tection system due to the loss of power supply to vit;al instrument AC
...Bus No. 4B.
19 80-10-26 P N/A RC zzzzzz Load restricted to 50X R.P. due to axial off-set limitations after the unit was returned to service.
(Nuclear system)
I 4
F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B.Maintenance or Test . 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG.
D.Regulatory Restriction 4-Other (Explain) OI6 I )
E.Operator Training h, License Exatnination F-Administrative G.Operational Errur (Explain) Exhibit I - Same Source I I-Other (Explain)
AVERAGE DAILYUNIT POWER LEVEL St. Lucie DATE Nov. 8 1980 JRILJ ->>4 MON~ OCTOBER'980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) (MWe-Net) 17 791 779 18 788 784 19 78 786 20 21 786 22 767 786
.8 789 24 783 790 25 785 10 16 790 77 789 28 787 13 789 79 14 30 783 15 31 784 790 NOTE: Average daily power 16
'evel greater than 777 MWe due to cooler condenser cooling water.
INSTRUCTIONS On this format. list the average daily unit power level in MWe Net for each day in the reporting month. Compute lo the nearest whole megawat t.
(o/77 1
OPERATING DATAREPORT, DOCKET NO.
DATE gtn~~80 COMPLETED'Y TELEPHONE
~~~son MlR ~-3824 OPERATING STATUS
- l. Unit Name: St. I;ucie Unit No. 1 Notes - Unit operated at
- 2. Reporting Period:
approximately 100X R.P., ex-
- 3. Licensed Thermal Power (MWt): 2560 cept for outage of (7ct. 21, 850 1980.
- 4. Nameplate Rating (Gross MWc):
- 5. Design Electrical Rating (Net MWc): 8 2
- 6. Maximum Dependable Capacity (Gross MWe): 822
- 7. Maximum Dependable Capacity (Net MWe): 777
- 8. IfChanges Occur in Capacity Ratings (Itqms Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. IfAny (Nct MWe):
- 10. Reasons For Restrictions, lf Any:
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 745.0 7 320.0 33 864.0
- 12. Number Of Hours Reactor Was Critical 740.3 5 457.7 26 967.5
- 13. Reactor Reserve Shutdown Hours -
129.5
- 14. Hours Generator On-Line 739.2 5 345.3 26 175;3
- 15. Unit Reserve Shutdown Hours 7.3 39.3
- 16. Gross Thermal Energy Ge'nerated (MWH) 1 885 676 13 271 993 63 531 559
- 17. Gross Electrical Energy Generated (MWH) 612 420 4 299 700 20 594 200
- 18. Net Electrica Energy Generated (MWH) 4 048 350 19'76 246
- 19. Unit Service Factor 99.2 73.0 77.3
- 20. Unit Availability Factor 99.2 73.1 77.4
- 21. Unit Capacity Factor (Using MDC Net) 100.1 71.2 73.6
- 22. Unit Capacity Factor (Using DER Nct) 97.0 69.0. '71.3
- 23. Unit Forced Outage Rate 0.8 8.4 '.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Acilieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION I'/77)
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT hIONTII OCTOBER 1980 r)
- ~L C
C Licenscc )=< C Cause & Correclive
~
Cl 4l 0 tS n Event IA Action lo
%K Q Report > cn Cr A Q Cr
~
Prevent Recurrence 17 80-.10-21 5.8 N/A HH INSTRU Unit was tripped by the steam genera tor level protection system caused by a spurious control signal to feedwater control valve No. 1A.
I 3
F: Forced Reason: Method:
S: Scheduled Exhibit G - Instructions A Equipment Failure (Explain) I-Manual for Preparation of Data B.h(aintenance or Test . 2.Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREC.
D Regulatory Restriction 4%ther (Explain) OI6 I )
E.Operator Training & Uccnsc Examination F-Administrative G.Operational Error (Explain) Exhibit I - Satnc Source
('t177) I I Other (Explain)
P.O, 80:C 5"9100, iVilAMI,FL
~ ~ 33'52
~'-CHID@ >CVlcR i:G>7 QC~N<;A~iY November 8, 1980 Office of Management Information and Program Controls U. S. Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the October, 1980, Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.
Very truly yours, A. D. Schmidt Vice President Power Resources VTC/ddc cc: Mr. James P. O'Reilly Robert Lowenstein, Esquire
SUMMARY
OF OPERATING EXPERIENCE POCKET NO. 50 - 250 Turkey Point UNIT Unit No 3 DATE November 8, 1980 COMPLETED BY '. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH OCTOBER 8 Unit No. 3 operated at approximately 97% R.P., until the unit was removed from service on October 6, 1980, for scheduled.Steam -Generator Tube In-spection Program, maintenance and inspections.'efer to "Unit Shutdowns and Power Reductions" Section of 'October, 1980, Operating Status Report for additional information.
Major Safety-related maintenance activities, performed. during the month included:
Inspections and requirements of IE. Bulletins and NUREG-0578 are continuing.
Florida Power 6 Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.
Completed Steam Generator Tube Inspection Program.
Installed feedwater piping sections to repair crack in the Heat Affected Zone (HAZ) of the weld connecting the feedwater piping to the 18" x 14" concentric reducer of Steam Generator Nos. 3A, 3B, and 3C.
SUMMA'RY OF OPERATING EXPERIENCE POCKET NO. 50 251 Turkey Point Unit No. 4 DATE November 8, 1980 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH OCTOBER 1980 Unit No. 4 operated at approximately 100% R..P., except for outage of October 25-26, 1980, and load restriction. to 50% R.P. on October 26-27, 1980, after the unit was returned to service. Refer to "Unit Shutdowns and Power Reductions" section of the October, 1980,. Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included:
Inspections and recpxirements of.IE Bulletins and NUREG-0578 in progress.
Florida Power & Light Company commitments for
.NUREG-0578 implementation are continuing. Refer to correspondence betwe'en FPL and NRC for ad-ditional information.
0 0
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50 335 St. Lucie UNIT Unit No. 1 DATE Nov. 8, 1980 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH OCTOBER 1980 Unit operated at approximately 100% R.P., except for outage of Oct. 21, 1980. Refer to "Unit Shutdowns and Power Reductions" section of the October, 1980, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the rponth included:
Inspections and requirements of IE Bulletins and NUREG-0578, are'ontinuing.
Florida Power Light Company commitments'or S
NUREG-0578 implementation are continuing. Refer to correspondence..between FPL and NRC for ad-ditional information.