Monthly Operating Repts for Oct 1980
ML17209A353
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 11/08/1980
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17209A354 List:
References
NUDOCS 8011180604
Download: ML17209A353 (15)


Text

AVERAGE DAILYUNIT POWER LEVEL Nov. 8, 1980 COMPLETED IIY V. T. Ch3.1SO>

4 MONTH OCTOBER~ 1980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL

{MWe.Net) (MWe-Net)

I 628 17 627 18 631 19 4 636 20 62 21 22 24 25 10 27 I'2 28 13 59 30 15 31 16 INSTRUCTIONS On this format. list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawat t.

(o/77)

OPERATING DATA REPORT, DOCKET NO.

DATE 39?~~180 COMPLETED 8Y V.T. Chilson TELEPHONE ~305~5-3824 OPERATING STATUS Turke Poiat Unit No. 3 Notes- Unit No. 3'perated at I Unit Name

~

o approximately 9?X R.P. until

2. Reporting Period:

2200 the unit was removed'rom

3. Licensed Thermal Power (MWt): service on Oct. 6,1980, for
4. Nameplate Rating (Gross MWe): 760 scheduled Steam Generator
5. Design Electrical Rating (Net MWe): 693 Tube Inspection Program,
6. Maximum Dependable Capacity (Gross MWe): 680 maintenance aad inspections.
7. Maximum Dependable Capacity (Net MWe): 646
8. IfChanges Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe): NONE
10. Reasons For Restrictions, lf Any:

This Month Yr..to-Date Cumulative I I. Hours In Reporting Period /45;0 7 320;0 69 321i6 53 090.4

13. Reactor Reserve Shutdown Hours -a- 213.4
14. Hours Generator On-Line 51 338;6
15. Unit Reserve Shutdown Hours >>0- 121.8
16. Gross Thermal Energy Ge'netated (MWH) 257 027 12 225 989 103 694 623
17. Gross Electrical Energy Generated (MWH) 79 650 3 844 350 32 925 350
18. Net Electrical Energy Generated (MWH) 72 844 3 641 796 31 163 890
19. Unit Service Factor 16.3 77 ' 74.1
20. Unit Availability Factor 16.3 7?.2 74.2
21. Unit Capacity Factor (Using MDC Net) 15.1 77.0 69.9
22. Unit Capacity Factor (Using DER Net) 14.1 71.8 64.9
23. Unit Forced Outage Rate 1.2 2.5
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each l:

Refuelin maintenance and ins ections March 1 1981 Ma 10 1981.

25. IfShut Down At End Of Report Period. Estimated Date of Startup: November 1 1980.
26. Units ln Test Status (Prior to Commercial Operation): Forecast . Achieved INITIALCRITICALITY INITIALELEGTRICITY > ~i~a i ' ~ ~ ~ ~

COMMERClALOPERATlON

('>/77)

UNIT SHUTDOWNS AND POIVER REDUCTIONS 1980 COhI PLETED BY REPORT MONTII OCTOBER PI Liccnsec c!D El Cl Cause & Corrective No. Dale Vl r3 Event Q Action to Q

Report

~ C ~ Prevent Rccurrcnce 19 80-10-06 S 623.7 B N/A HB HTEXCH Unit was removed from service for (P) scheduled Steam Generator Tube In-spection Program, maintenance, and inspections. (Nuclear and Non-nuclear systems) 3 F: Forced Reason: hlcthod: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I.Manual lor Preparation of Data B-h(alntenance or Test . 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Autotnatic Scram. Event Report (LER) File (NUREG-

!~

D-Regulatory Restriction 4.Other (Explain) 016I )

~ E-Operator Training & License Examination F-Administrative

'!)

G.Operational Error (Explain) Exhibit I - Saute Source

/77) II Other (Explain)

AVERAGE DAlLYUNIT POWER LEVEL DOCKET NO.

UNIT Nov. 8 1980 COMPLETED 8Y V. T. Chilson TELEPHONE MONTH OCTOBER P 1 9 8 0 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAlLYPOWER LEVEL (MWe-Net) (MWe-Net I 17 627 630 18 621 6 4 19 625 20 626 639 626 638 652 '24 641 651 587 10 26 221 641 28 641 13 641 29 626 14 643 30 619 15 31 612 16 NOTE: Average daily power level greater than 646 MWe due to cooler condenser cooling INSTRUCTIONS water.

On this format. list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole rnegawat t.

(n/77)

OPERATING DATA REPORT DOCKET NO.

DATE Eov.8 19 0 COMPLETED BY Z 'Kg~on TELEPHONE ~~~2-3824 OPERATING STATUS

1. Unit Name: Turke Point Unit No. 4 Notes- Unit No. 4 operated at
2. Reporting period: October, 1980 approximately 100X R.P., ex-
3. Licensed Thermal Power (MWt):

cept for outage of 0'ct.25-26

4. Namephte Rating (Gross MWe): 760 1980; and load restriction t 50X R.P. on Oct.26-27, 1980,
5. Design Electrical Rating (Ne! MWe):
6. Maximum Dependable Capacity (Gross MWe):

after the unit was returned to service.

7. Maximum Dependable Capacity (Net MWe):
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, If Any:

Thh Month Yr.-to-Date Cumuhtive II. Hours In Reporting Period 7 320.0 63 049.0 Of Hours Reactor 742.9 5 995.0 46 822.8 Jt=

12. Number Was Critical
13. Reactor Reserve Shutdown Hours 12.3 166.6
14. Hours Generator On-Line 45 088;9
15. Unit Reserve Shutdown Hours 12.3 31.2
16. Gross Thermal Energy Generated (MWH) 1 582 803 12 790 137 94 009 117
17. Gross Electrical Energy Generated (MWH) 481 620 3 961 560 29 865 038 28 284 899
19. Unit Service Factor 99.6 80.7 71.5
20. Unit Availability Factor 99.6 80.9 71.6
21. Unit Capacity Factor (Using MDC Net) 94.8 79.4 69.7

". Unit Capacity Factor (Using DER Net)

  • 88.4 74.0 '64.7
23. Unit Forced Outage Rate 0.4 0.3 2.9
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

e uelin maintenance and ins ections November 9, 1980 January 10, 1981.

25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY'OMMERCIAL OPERATION

('>/77)

DOCKET NO. 50 '2&l UNIT SIIVTDOWNS AND POWER REDUCTIONS UNITNAME Turke Point IJ it No.4 REPORT MONT(I OCTOBER 1980 Licenscc C< gtA Cause Ec Corrective No. Date 0 4 Event Actiun tu U~ c Repurt > rir G O Prevent Recurrence

~ Ch d ~ i 18 80-10-.25 P 33. A 3 N/A ED Unit was tripped by the reactor pro-tection system due to the loss of power supply to vit;al instrument AC

...Bus No. 4B.

19 80-10-26 P N/A RC zzzzzz Load restricted to 50X R.P. due to axial off-set limitations after the unit was returned to service.

(Nuclear system)

I 4

F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B.Maintenance or Test . 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG.

D.Regulatory Restriction 4-Other (Explain) OI6 I )

E.Operator Training h, License Exatnination F-Administrative G.Operational Errur (Explain) Exhibit I - Same Source I I-Other (Explain)

AVERAGE DAILYUNIT POWER LEVEL St. Lucie DATE Nov. 8 1980 JRILJ ->>4 MON~ OCTOBER'980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) (MWe-Net) 17 791 779 18 788 784 19 78 786 20 21 786 22 767 786

.8 789 24 783 790 25 785 10 16 790 77 789 28 787 13 789 79 14 30 783 15 31 784 790 NOTE: Average daily power 16

'evel greater than 777 MWe due to cooler condenser cooling water.

INSTRUCTIONS On this format. list the average daily unit power level in MWe Net for each day in the reporting month. Compute lo the nearest whole megawat t.

(o/77 1

OPERATING DATAREPORT, DOCKET NO.

DATE gtn~~80 COMPLETED'Y TELEPHONE

~~~son MlR ~-3824 OPERATING STATUS

l. Unit Name: St. I;ucie Unit No. 1 Notes - Unit operated at
2. Reporting Period:

approximately 100X R.P., ex-

3. Licensed Thermal Power (MWt): 2560 cept for outage of (7ct. 21, 850 1980.
4. Nameplate Rating (Gross MWc):
5. Design Electrical Rating (Net MWc): 8 2
6. Maximum Dependable Capacity (Gross MWe): 822
7. Maximum Dependable Capacity (Net MWe): 777
8. IfChanges Occur in Capacity Ratings (Itqms Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. IfAny (Nct MWe):
10. Reasons For Restrictions, lf Any:

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 745.0 7 320.0 33 864.0
12. Number Of Hours Reactor Was Critical 740.3 5 457.7 26 967.5
13. Reactor Reserve Shutdown Hours -

129.5

14. Hours Generator On-Line 739.2 5 345.3 26 175;3
15. Unit Reserve Shutdown Hours 7.3 39.3
16. Gross Thermal Energy Ge'nerated (MWH) 1 885 676 13 271 993 63 531 559
17. Gross Electrical Energy Generated (MWH) 612 420 4 299 700 20 594 200
18. Net Electrica Energy Generated (MWH) 4 048 350 19'76 246
19. Unit Service Factor 99.2 73.0 77.3
20. Unit Availability Factor 99.2 73.1 77.4
21. Unit Capacity Factor (Using MDC Net) 100.1 71.2 73.6
22. Unit Capacity Factor (Using DER Nct) 97.0 69.0. '71.3
23. Unit Forced Outage Rate 0.8 8.4 '.1
24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):
25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Acilieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION I'/77)

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT hIONTII OCTOBER 1980 r)

- ~L C

C Licenscc )=< C Cause & Correclive

~

Cl 4l 0 tS n Event IA Action lo

%K Q Report > cn Cr A Q Cr

~

Prevent Recurrence 17 80-.10-21 5.8 N/A HH INSTRU Unit was tripped by the steam genera tor level protection system caused by a spurious control signal to feedwater control valve No. 1A.

I 3

F: Forced Reason: Method:

S: Scheduled Exhibit G - Instructions A Equipment Failure (Explain) I-Manual for Preparation of Data B.h(aintenance or Test . 2.Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREC.

D Regulatory Restriction 4%ther (Explain) OI6 I )

E.Operator Training & Uccnsc Examination F-Administrative G.Operational Error (Explain) Exhibit I - Satnc Source

('t177) I I Other (Explain)

P.O, 80:C 5"9100, iVilAMI,FL

~ ~ 33'52

~'-CHID@ >CVlcR i:G>7 QC~N<;A~iY November 8, 1980 Office of Management Information and Program Controls U. S. Regulatory Commission Washington, D. C. 20555 Gentlemen:

Attached are the October, 1980, Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.

Very truly yours, A. D. Schmidt Vice President Power Resources VTC/ddc cc: Mr. James P. O'Reilly Robert Lowenstein, Esquire

SUMMARY

OF OPERATING EXPERIENCE POCKET NO. 50 - 250 Turkey Point UNIT Unit No 3 DATE November 8, 1980 COMPLETED BY '. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH OCTOBER 8 Unit No. 3 operated at approximately 97% R.P., until the unit was removed from service on October 6, 1980, for scheduled.Steam -Generator Tube In-spection Program, maintenance and inspections.'efer to "Unit Shutdowns and Power Reductions" Section of 'October, 1980, Operating Status Report for additional information.

Major Safety-related maintenance activities, performed. during the month included:

Inspections and requirements of IE. Bulletins and NUREG-0578 are continuing.

Florida Power 6 Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.

Completed Steam Generator Tube Inspection Program.

Installed feedwater piping sections to repair crack in the Heat Affected Zone (HAZ) of the weld connecting the feedwater piping to the 18" x 14" concentric reducer of Steam Generator Nos. 3A, 3B, and 3C.

SUMMA'RY OF OPERATING EXPERIENCE POCKET NO. 50 251 Turkey Point Unit No. 4 DATE November 8, 1980 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH OCTOBER 1980 Unit No. 4 operated at approximately 100% R..P., except for outage of October 25-26, 1980, and load restriction. to 50% R.P. on October 26-27, 1980, after the unit was returned to service. Refer to "Unit Shutdowns and Power Reductions" section of the October, 1980,. Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Inspections and recpxirements of.IE Bulletins and NUREG-0578 in progress.

Florida Power & Light Company commitments for

.NUREG-0578 implementation are continuing. Refer to correspondence betwe'en FPL and NRC for ad-ditional information.

0 0

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50 335 St. Lucie UNIT Unit No. 1 DATE Nov. 8, 1980 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH OCTOBER 1980 Unit operated at approximately 100% R.P., except for outage of Oct. 21, 1980. Refer to "Unit Shutdowns and Power Reductions" section of the October, 1980, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the rponth included:

Inspections and requirements of IE Bulletins and NUREG-0578, are'ontinuing.

Florida Power Light Company commitments'or S

NUREG-0578 implementation are continuing. Refer to correspondence..between FPL and NRC for ad-ditional information.