ML12361A155

From kanterella
Jump to navigation Jump to search
Summary of Entergy Drop-In on December 19, 2012
ML12361A155
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 12/26/2012
From: Arthur Burritt
Reactor Projects Branch 2
To: Darrell Roberts
Division Reactor Projects I
References
Download: ML12361A155 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 December 26, 2012 MEMORANDUM TO: Darrell J. Roberts, Director Division of Reactor Projects FROM: Arthur L. Burritt, Chief /RA/

Projects Branch 2

SUBJECT:

Summary of Entergy Drop-in Visit On December 19, 2012, Mr. John Ventosa, Indian Point Site Vice President, Mr. Larry Coyle, Plant Manager, Mr. Pat Conroy, Nuclear Safety Assurance Director, Mr. Bob Walpole, Licensing Manager, and Mr. Mark Woodby, Engineering Director, all representing Entergy Nuclear, met with the Regional Administrator and members of the Region I staff at the NRC offices in King of Prussia, PA. Entergy requested the meeting to provide a general update on the status of Indian Point.

During the meeting, the following topics were discussed:

1. Plant performance summary
2. Status of spent fuel activities at Indian Point Units 2 and 3
3. The decision making process and expectations for personnel
4. Status of fire protection systems modifications to address operator manual actions
5. Status of post Fukushima actions
6. Flex - an industry initiative developed to implement the NRCs Fukushima task force recommendations
7. Status of license renewal commitments and potential entry into the Period of Extended Operations
8. IPEC Management Changes
9. Security improvements
10. Stakeholder relationships The meeting began at 10:00 a.m. and ended at 12:15 p.m. No regulatory decisions were requested or made during the meeting and there were no commitments for any follow-up actions on the part of Region. The slides used by Entergy to conduct the briefing are enclosed with this memorandum.

Enclosure:

As stated

ML12361A155 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SMcCarver ABurritt DATE 12/21/12 12/26/12 Indian Point Energy Center Topics of Interest John Ventosa Vice President -/ Indian Point Energy Center Entergy Nuclear December 19, 2012

Discussion Points

  • PlantPerformance
  • Spent Fuel Summary
  • Decision Making
  • Fire Protection
  • Post Fukushima Actions
  • Flex
  • IPEC Management Changes
  • Security Improvements
  • Stakeholder relationships

QUESTIONS?