Other: ML15327A213, ML16133A459, ML16133A499, ML16312A270, ML17207A165, ML17250A244, ML17256A286, ML18212A032, ML18212A181, ML18212A185, ML18212A188, ML18212A190, ML18212A194, ML18212A195, ML18213A104, ML18213A114, NL-16-138, Amendment 18 to License Renewal Application, NL-17-005, Actions Concerning License Renewal Commitments 41 and 42 in Response to LR-ISG-2016-01, Changes to Aging Management Guidance for Various Steam Generator Components, NL-17-019, Amendment to License Renewal Application - Reflecting Shortened License Renewal Terms, NL-17-020, License Renewal Application - Revisions to Reactor Vessel Internals Aging Management Program and Inspection Plan, NL-17-157, Amendment 19 to License Renewal Application (LRA)
|
MONTHYEARML15344A4362015-12-10010 December 2015 Lr Hearing - (External_Sender) Draft Audit Plan Edits Project stage: Request ML15327A2132015-12-21021 December 2015 Plan for the Regulatory Audit of the Service Water Integrity and Fire Water System Aging Management Programs Pertaining to the Indian Point Nuclear Generating Unit Nos. 2 and 3 LRA Project stage: Other ML15351A2032015-12-30030 December 2015 Summary of Conference Call Held on December 9, 2015, Between the NRC and Entergy Nuclear Operations, Inc. Concerning the Draft Audit Plan for the Service Water Integrity and Fire Water System Aging Management Programs Project stage: Draft Other 05000247/LER-2016-004, Re Unanalyzed Condition Due to Degraded Reactor Baffle-Former Bolts2016-05-31031 May 2016 Re Unanalyzed Condition Due to Degraded Reactor Baffle-Former Bolts Project stage: Request ML16133A4592016-06-15015 June 2016 Service Water and Fire Water Systems Aging Management Programs Audit Report for the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application Project stage: Other ML16133A4992016-06-21021 June 2016 Summary of Telephone Conference Call Held Between NRC and Entergy Concerning the Indian Point LRA Safety Review Project stage: Other ML16138A1942016-07-25025 July 2016 Request for Additional Information for the Review of License Renewal Application, Set 2016-01 Project stage: RAI ML16208A2772016-07-26026 July 2016 Lr Hearing - RAI Set 2016-01 Project stage: Request ML16312A2702016-11-0909 November 2016 Project Manager Change for the License Renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3 Project stage: Other NL-16-122, Reply to Request for Additional Information for the Review of License Renewal Application, Set 2016-012016-12-0202 December 2016 Reply to Request for Additional Information for the Review of License Renewal Application, Set 2016-01 Project stage: Response to RAI NL-16-138, Amendment 18 to License Renewal Application2016-12-15015 December 2016 Amendment 18 to License Renewal Application Project stage: Other ML16350A4852016-12-15015 December 2016 Letter Enclosing Sipos Notice of Withdrawal Project stage: Request NL-17-005, Actions Concerning License Renewal Commitments 41 and 42 in Response to LR-ISG-2016-01, Changes to Aging Management Guidance for Various Steam Generator Components2017-01-17017 January 2017 Actions Concerning License Renewal Commitments 41 and 42 in Response to LR-ISG-2016-01, Changes to Aging Management Guidance for Various Steam Generator Components Project stage: Other NL-17-020, License Renewal Application - Revisions to Reactor Vessel Internals Aging Management Program and Inspection Plan2017-02-0606 February 2017 License Renewal Application - Revisions to Reactor Vessel Internals Aging Management Program and Inspection Plan Project stage: Other NL-17-019, Amendment to License Renewal Application - Reflecting Shortened License Renewal Terms2017-02-0808 February 2017 Amendment to License Renewal Application - Reflecting Shortened License Renewal Terms Project stage: Other ML17046A2312017-03-0808 March 2017 Request for Additional Information for the Review of the Indian Point License Renewal - Set 2017-01 Project stage: RAI ML17082A3112017-04-11011 April 2017 Summary of Clarification Call with Entergy Regarding Follow-Up RAIs on ISG-2012-02 Project stage: RAI ML17088A3272017-04-19019 April 2017 Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-02 Project stage: RAI ML17088A4052017-04-20020 April 2017 Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-3 Project stage: RAI ML17101A6972017-04-25025 April 2017 License Renewal Clarification Call on Baffle Bolt RAIs Project stage: Approval NL-17-052, Reply to Request for Additional Information for the Review of the License Renewal Application, Set 2017-012017-05-0808 May 2017 Reply to Request for Additional Information for the Review of the License Renewal Application, Set 2017-01 Project stage: Response to RAI NL-17-053, Reply to Request for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-032017-05-18018 May 2017 Reply to Request for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-03 Project stage: Response to RAI NL-17-060, Reply to Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-022017-05-19019 May 2017 Reply to Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-02 Project stage: Response to RAI ML17128A3352017-05-23023 May 2017 Summary of Telephone Conference Call Between the NRC and Entergy Concerning RAIs Pertaining to IP2 and IP3 Project stage: RAI NL-17-061, Reply to Requests for Additional Information for the Review of the License Renewal Application RAI Set 2017-042017-05-24024 May 2017 Reply to Requests for Additional Information for the Review of the License Renewal Application RAI Set 2017-04 Project stage: Response to RAI NL-17-069, Reply to Requests for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application RAI Set 2017-052017-06-0808 June 2017 Reply to Requests for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application RAI Set 2017-05 Project stage: Response to RAI ML17170A2862017-06-27027 June 2017 RAI Set 2017-06 Project stage: RAI NL-17-074, Supplemental Information Regarding Reply to Request for Additional Information Set 2017-01 for the Review of the License Renewal Application (LRA)2017-06-27027 June 2017 Supplemental Information Regarding Reply to Request for Additional Information Set 2017-01 for the Review of the License Renewal Application (LRA) Project stage: Supplement ML17160A1652017-06-27027 June 2017 Summary of Telephone Conference Call Held on May 31,2017, Between the NRC and Entergy Nuclear Operations Inc. Concerning Requests for Additional Information Pertaining to the Indian Point, License Renewal Application (TAC Nos. MD5407/MD5408 Project stage: RAI NL-17-092, Amended Response to Request for Additional Information Question RAI 3.3.2-17-IP3-1 Re License Renewal Application RAI Set 2017-052017-07-27027 July 2017 Amended Response to Request for Additional Information Question RAI 3.3.2-17-IP3-1 Re License Renewal Application RAI Set 2017-05 Project stage: Response to RAI NL-17-084, Reply to Requests for Additional Information for the Review of the License Renewal Application. Re RAI Set 2017-062017-07-27027 July 2017 Reply to Requests for Additional Information for the Review of the License Renewal Application. Re RAI Set 2017-06 Project stage: Response to RAI ML17243A3152017-08-31031 August 2017 NMFS to NRC, Endangered Species Act Section 7 Conference Report for Proposed Indian Point Relicensing Project stage: Request ML17207A1652017-09-0101 September 2017 License Renewal Audit Plan Regarding the Service Water Integrity Program Project stage: Other ML17250A2442017-09-20020 September 2017 Audit Report for IP Swi - Aug 2017 Project stage: Other ML17191A4562017-09-20020 September 2017 Telecon Summary Related to Indian Point License Renewal RAIs Associated with ISG-2016-01 Project stage: RAI ML17180A5032017-09-21021 September 2017 Summary of Teleconference with Entergy Nuclear Operations, Inc., Concerning Request for Additional Information Pertaining to the Indian Point Unit Nos. 2 and 3 License Renewal Application Project stage: RAI ML17256A2862017-09-25025 September 2017 Summary of Telephone Call on 09/06/17, Between NRC and Entergy Concerning Next Steps from the Site Audit on 08/1-3/17 Project stage: Other NL-17-127, Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA)2017-11-0808 November 2017 Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA) Project stage: Supplement ML17298A5442017-11-13013 November 2017 Summary of Meeting with the National Marine Fisheries Service Related to Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Project stage: Meeting NL-17-155, Re-Submittal of Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA)2017-12-14014 December 2017 Re-Submittal of Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA) Project stage: Supplement NL-17-157, Amendment 19 to License Renewal Application (LRA)2017-12-14014 December 2017 Amendment 19 to License Renewal Application (LRA) Project stage: Other NL-17-161, Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Units 2 and 3 License Renewal Application (LRA)2017-12-21021 December 2017 Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Units 2 and 3 License Renewal Application (LRA) Project stage: Supplement NL-18-010, Supplemental Information Regarding the Review of the License Renewal Application2018-02-26026 February 2018 Supplemental Information Regarding the Review of the License Renewal Application Project stage: Supplement ML18107A7592018-04-30030 April 2018 NUREG-1437, Suppl. 38, Vol. 5, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 38 Regarding Indian Port Nuclear Generating Unit Nos. 2 and 3 Final. Project stage: Acceptance Review NL-18-030, Supplemental Information Associated with Amendment 19 to the License Renewal Application (LRA)2018-05-0808 May 2018 Supplemental Information Associated with Amendment 19 to the License Renewal Application (LRA) Project stage: Supplement NL-18-044, Supplemental Information Regarding the Review of the License Renewal Application2018-06-25025 June 2018 Supplemental Information Regarding the Review of the License Renewal Application Project stage: Supplement ML18200A3332018-08-0101 August 2018 NUREG-1930, Supp 3, Safety Evaluation Report Related to the License Renewal of Indian Point Nuclear Generating Plant, Units 2 and 3. Project stage: Approval ML18213A1142018-09-17017 September 2018 Renewed Facility Operating License Project stage: Other ML18211A5962018-09-17017 September 2018 Transmittal Letter - Issuance of Renewed Facility Operating License Nos. DPR-26 and DPR-64 for Indian Point Nuclear Generating Unit Nos. 2 and 3 Project stage: Approval ML18211A5782018-09-17017 September 2018 Federal Register Notice - Announcing the Issuance of the Indian Point Renewed Licenses Project stage: Approval 2017-04-19
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 21, 2017 LICENSEE:
Entergy Nuclear Operations, Inc.
FACILITY:
Indian Point Unit Nos. 2 and 3
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON APRIL 19, 2017, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE INDIAN POINT UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION (CAC. NOS. MD5407 AND MD5408)
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc., held a telephone conference call on April 19, 2017, to discuss and clarify the staffs additional information concerning the Indian Point Unit Nos. 2 and 3, license renewal application to ensure compliance with Title 10 of the Code of Federal Regulations (10 CFR) Part 54.
provides a listing of the participants and Enclosure 2 summarizes the key issues.
Entergy had an opportunity to comment on this summary.
Sincerely,
/RA/
William Burton, Senior Project Manager Projects Management and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
Enclosures:
- 1. List of Participants
- 2. Key issues cc w/encls: Listserv
ML17180A503 OFFICE PM:RPGB:DLR LA:DLR BC:RPGB:DLR PM:RPGB:DLR NAME WBurton YEdmonds S Stuchell W Burton DATE 9/21/2017 9/20/2017 9/21/2017 9/21/2017
TELEPHONE CONFERENCE CALL INDIAN POINT UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS APRIL 19, 2017 PARTICIPANTS AFFILIATIONS William Butch Burton U.S. Nuclear Regulatory Commission (NRC)
Andrew Prinaris NRC Richard Louie Entergy Nuclear Operations, Inc.
SUMMARY
OF TELEPHONE CONFERENCE CALL LICENSE RENEWAL APPLICATION APRIL 19, 2017 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc., (Entergy) held a telephone conference call on April 19, 2017, to discuss and clarify request for additional information concerning the license renewal application (LRA) to ensure compliance with Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54).
Background:
By letter dated April 23, 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML071210512), Indian Point Energy Center (IPEC), submitted a License Renewal Application (LRA) pursuant to Title 10 of the Code of Federal Regulations (CFR) Part 54 for review by the U.S. Nuclear Regulatory Commission, to renew operating licenses DPR-26 and DPR-64 for Indian Point, Units 2 and 3 (IP2 and IP3), for an additional 20 years.
By letters dated February 23, 2016 and March 13, 2015, the NRC staff approved for IP2 (ADAMS Accession No. ML15349A794) and IP3 (ADAMS Accession No. ML15028A308) license amendment requests (LARs) supplemented with additional information provided (for IP2 see ADAMS Accession Nos. ML14353A015, ML15149A137, ML15149A139, ML15163A166 and ML15189A026 and for IP3 see ADAMS Accession Nos. ML14050A383 and ML14365A038, respectively) to extend the test interval of 10 CFR 50, Appendix J tests. For IP2, amendment No. 283 revised Technical Specification (TS) 5.5.14, Containment Leakage Rate Testing Program, to extend the frequency of the containment integrated leak rate test (ILRT) from once every 10 years to once every 15 years on a performance basis, following a one-time extension to 15 years approved on August 5, 2002 (ADAMS Accession No. ML021860178). Similarly, for IP3, amendment No. 256, revised TS 5.5.15, Containment Leakage Rate Testing Program, to extend the frequency of the containment ILRT from once every 10 years to once every 15 years on a performance basis, following the one-time extension of 15 years approved on April 17, 2001 (ADAMS Accession No. ML011020315).
Following the review of the IPEC LRA Annual Update dated December 15, 2016 (ADAMS Accession No. ML16358A526), the staff noted that it did not include a revised LRA AMP B.1.7, Containment Leak Rate Program, subscribing to the new extended testing for ILRT in full alignment of the program with the IP2 and IP3 TS. Therefore, the staff held, as noted above, a teleconference with Entergy seeking clarification.
Discussion:
The NRC staff initiated the discussion requesting Entergy to clarify the inconsistency between the IP2 and IP3 TS having the NEI 94-01, Revision 2-A, as the implementing document to 10 CFR 50 Appendix J, while LRA AMP B.1.7 used RG 1.163 endorsing NEI 94-01, Revision 0, as the implementing document. Entergy acknowledged that the 2016 Annual Update did not contain a revised LRA AMP B.1.7 and agreed to provide an amendment to the LRA to include the revised program in full alignment with the TSs and updates of the relevant plan/procedures.