Indian Point 2 & 3 Annual Assessment Indian Point 2 & 3 Safety y Performance in 2011 Reactor Oversight g Process Nuclear Regulatory Commission - Region I ADAMS Accession No: ML12130A131 Slides made public on May 9, 2012 1

NRC Assessment Summary

  • Entergy operated Indian Point 2 & 3 safely and in a manner that preserved the public health and safety and protected t t d the th environment i t
  • Licensee Response column of the Action Matrix for each unit
  • Baseline inspections planned for each unit nit in 2012 2

NRC Independent Safety Inspections Reactor Oversight Program

  • NRC inspectors have unfettered access to all plant activities related to nuclear safety and security
  • At least two full-time NRC resident inspectors at each nuclear site
  • NRC specialists conduct additional i

inspections ti att each h nuclear l site it 3

Reactor Oversight Process Strategic g

Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance g

Threshold Threshold Action Matrix Regulatory Response 4

NRC Action Matrix Licensee Regulatory Degraded Multiple Repetitive Unacceptable Response Response Cornerstone Degraded Performance Cornerstone All Inputs are 1 or 2 White 2 White or 1 Multiple Yellow Overall Green; Inputs; Yellow Input; Inputs or 1 Red Unacceptable Cornerstone Cornerstone Cornerstone Input; Cornerstone Performance; Objectives Objectives Objectives Met w/ Objectives Met w/ Plants not Fully Met Fully Met Moderate Significant permitted to Degradation in Degradation in Operate w/in this Safety Safety Performance Column; Performance Unacceptable Margin to Safety

  • IIncreasingi safetyf t significance i ifi
  • Increasing NRC inspection efforts
  • Increasing NRC/Licensee management in ol ement involvement
  • Increasing regulatory actions

Indian Point 2 Inspection Activities in 2011

  • 4700 hours0.0544 days <br />1.306 hours <br />0.00777 weeks <br />0.00179 months <br /> of inspection and related activities
  • 7 regional inspections
  • 2 major team inspections
  • Permanent Plant Modifications 6

Indian Point 2 Performance Indicator and Inspection Results January y 1 through g December 31,, 2011

  • All Green Performance Indicators
  • 13 G Green/Severity

/S it Level L l IV inspection findings

  • No greater than Green inspection findings 7

Indian Point 3 Inspection Activities in 2011

  • 6300 hours0.0729 days <br />1.75 hours <br />0.0104 weeks <br />0.0024 months <br /> of inspection and related activities
  • 11 regional inspections
  • 3 major team inspections
  • Permanent Plant Modifications
  • Problem Identification and Resolution 8

Indian Point 3 Performance Indicator and Inspection Results January y 1 through g December 31,, 2011

  • All Green Performance Indicators
  • 11 G Green/Severity

/S it Level L l IV inspection findings

  • No greater than Green inspection findings 9

2011 Indian Point 2 & 3 Assessment Summary

  • Indian Point 2 & 3 operated safely
  • Licensee Response column of the Action Matrix
  • Baseline inspections planned for 2012 10

Contacting the NRC

  • R Reportt a safety f t concern
  • 1-800-695-7403
  • allegation@nrc.gov allegation@nrc gov
  • General questions
  • www.nrc.gov
  • Region I Public Affairs
  • Diane Di S Screnci, i 610 610-337-5330 337 5330 diane.screnci@nrc.gov