ML17171A187

From kanterella
Jump to navigation Jump to search
NRC Staff Presentation - Baffle-Former Bolt Inspections at Indian Point
ML17171A187
Person / Time
Site: Indian Point  
Issue date: 06/14/2017
From: David Rudland
Office of Nuclear Reactor Regulation
To:
Setzer T
References
Download: ML17171A187 (5)


Text

BaffleFormerBolt InspectionsatIndianPoint Remarksby DavidL.Rudland Chief,VesselandInternalsIntegrityBranch OfficeofNuclearReactorRegulations U.S.NuclearRegulatoryCommission June14,2017 ML17171A187

BaffleformerAssembly Stainless steel bolts are 5/8 dia. x ~2 long Direct coolant flow through the core and provides lateral support to the core during a seismic event or loss-of-coolant accident (LOCA).

2

BaffleBoltInspection

  • MRP227Acoversinspectionof reactorinternals

- MRPLetter2017011dictated interimguidance

  • Ultrasonicinspectiontechnique

- Oneprobeperbolt,severalsensors andchannelsofdata

- Qualifiedfordetectiononly-go/no go

  • Techniqueappearsconservative

- >50%ofboltsremovedretained someloadcarryingcapacity 3

RecentInspectionsatIndianPoint Plant EFPY@DateofUTExam DateofUTExam No.ofvisuallyfailed bolts No.ofboltswithUT indications No.ofboltsthatcould notbeUTexamined TotalNo.ofPotentially DegradedBolts No.ofBoltsReplaced No.BoltswithUT indicationsthatfailed uponremoval Indian

Point, Unit2 31.1 Mar 2016 31 182 14 227 278 103 Indian
Point, Unit3 28.6 Mar 2017 0

256 3

259 270 35 4

Total number of baffle-former bolts at IP2/3 is 832/unit

Conclusion

  • Structuralintegrityofbaffleformerassemblyis maintainedatIndianPointdueto

- ReplacementofallboltswithUTindications

- Replacementofadditionalnondegradedboltsformarginand

- Subsequentboltinspectionsateveryrefuelingoutage

  • NRCwillcontinuetoinspectboltexaminationresults throughthebaselineinspectionprogramatIndianPoint
  • Morebroadly,theNRCstaffwillcontinuetoclosely monitorthebaffleformerboltoperatingexperienceand updatedinspectionguidancetoensurestructural integrity 5