UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 June 20, 2017 MEETING

SUMMARY

LICENSEE: ENTERGY NUCLEAR NORTHEAST FACILITY: INDIAN POINT UNITS 2 AND 3

SUBJECT:

SUMMARY

OF ANNUAL ASSESSMENT MEETING On June 14, 2017, at 7:00 p.m., the U.S. Nuclear Regulatory Commission (NRC) conducted a public meeting at the Doubletree by Hilton in Tarrytown, New York, to discuss its assessment of the safety performance at Indian Point Units 2 and 3 for calendar year 2016.

A notice of the meeting was issued on May 18, 2017, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession Number ML17138A339. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC discussed its assessment of the safety performance of Indian Point Units 2 and 3 for the period of January 1 through December 31, 2016, as documented in our letter dated March 1, 2017 (ADAMS Accession Number ML17059D265). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Indian Point Units 2 and 3 can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The NRC also presented slides on two topics of public interest, which included the assessment of degraded baffle-former bolts at Unit 3 and decommissioning. Following the discussion of plant performance and presentations, the NRC held a question and answer session.

Members of the public, local officials, State officials, and members of the media attended the meeting and were offered the opportunity to question the NRC regarding Entergys performance and the role of the agency in ensuring safe plant operations.

/RA/

Thomas C. Setzer, Chief Projects Branch 2 Division of Reactor Projects

Enclosures:

1. NRC Staff Presentation - Baffle-Former Bolt Inspections at Indian Point (ML17171A187)
2. NRC Staff Presentation - Power Reactor Decommissioning Program (ML17171A192)
3. Presentations by Members of the Public (ML17171A198)

ML17172A197 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME MHenrion TSetzer DATE 6/20/17 6/20/17