ML14078A399

From kanterella
Jump to navigation Jump to search
Summary of Conference Call Held on February 20, 2014, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning a Draft Request for Additional Information on LR-ISG-2012-02 and Draft LR-ISG-2013-01
ML14078A399
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/21/2014
From: Kimberly Green
NRC/NRR/DLR/RAPB
To:
Entergy Nuclear Operations
Green K, 415-1627
References
LR-ISG-2012-02, LR-ISG-2013-01
Download: ML14078A399 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20555-0001 March 21, 2014 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Indian Point Nuclear Generating Unit Nos. 2 and 3

SUBJECT:

SUMMARY

OF CONFERENCE CALL HELD ON FEBRUARY 20, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING A DRAFT REQUEST FOR ADDITIONAL INFORMATION ON LR-ISG-2012-02 AND DRAFT LR-ISG-2013-01 Representatives of the US. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant) held a conference call on February 20, 2014, to discuss a draft request for additional information (RAI) on LR-ISG-2012-02 and Draft LR-ISG-2013-01. A list of the participants is enclosed.

By email dated February 2, 2014, the staff sent a draft RAI to Entergy regarding the recently issued interim staff guidance (ISG) document on management of aging effects on internal surfaces of piping, and the recently issued draft ISG document on management of aging effects for internal coatings. In both lSG documents, the staff recommends that initial inspections of certain piping and coatings be conducted within five years and ten years, respectively, prior to entering the period of extended operation. Indian Point Nuclear Generating Unit 2 (IP2) is already operating in the period of extended operation, and Indian Point Nuclear Generating Unit 3 (IP3) will enter the period of extended operation at midnight on December 12, 2015.

Therefore, Entergy wanted clarification on when the initial inspections must be conducted. and whether conduct of the recommended inspections would be a condition of receiving a renewed license.

The staff stated that it understands the issue of timing for the IP units, and that an exception to the timing for the conduct of the initial inspections could be requested. The staff would review the exception and make a determination regarding the timing of the planned initial inspections.

The applicant requested some changes to the wording of the draft RAI. The staff agreed to consider these requested changes and provide a revised draft RAI prior to issuance of the final vers1on.

The applicant requested a 180-day response period for the RAI. The staff agreed to this request.

The applicant had an opportunity to comment on this summary.

Kimberly J. Green, Sr. Mechanical Engineer Aging Management of Plant Systems Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

List of Participants cc w/encl: Listserv

  • ML14078A399 *concurrence via e-mail OFFICE LA: DLR/RPB1* PM: DLR/RAPB BC: RPB1 :DLR PM: DLR/RAPB NAME YEdmonds KGreen YDiaz KGreen DATE 3/20/14 3/20/14 3/21/14 3/21/14 TELEPHONE CONFERENCE CALL INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS FEBRUARY 20 2014 PARTICIPANTS: AFFILIATIONS:

Kim Green U.S. Nuclear Regulatory Commission (NRC)

William Holston NRC Roger Waters Entergy Nuclear Operations, Inc. (Entergy)

Charlie Caputo Entergy John Curry Entergy Dave Lach Entergy Sal Zulla Entergy Tom Orlando Entergy Peter Guglielmino Entergy Alan Cox Entergy Andy Taylor Entergy ENCLOSURE

SUBJECT:

SUMMARY

OF CONFERENCE CALL HELD ON FEBRUARY 20, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING A DRAFT REQUEST FOR ADDITIONAL INFORMATION ON LR-ISG-2012-02 AND DRAFT LR-ISG-2013-01 DISTRIBUTION:

HARDCOPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDir Resource RidsNrrDirRpb1 Resource RidsNrrDirRpb2 Resource RidsNrrDirRarb Resource RidsNrrDirRasb Resource RidsNrrD\rRerb Resource RidsNrrDirRsrg Resource RidsNrrOraAfpb Resource RidsNrrDeEvib Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMaiiCenter Resource RidsNrrPMindianPoint Resource YDiaz ABurritt, Rl KGreen DonaldJackson, Rl WHolston GMeyer, Rl STurk, OGC MModes, Rl BMizuno, OGC NSheehan, Rl OPA DRoth, OGC DScrenci, Rl OPA BHarris, OGC DTifft, Rl SBurnell, OPA NMcNamara, Rl DMclntyre, OPA GNewman, Rl EDacus, OCA JSStewart, Rl MGray, Rl AmiPatel, Rl