ML091380435

From kanterella
Jump to navigation Jump to search
Meeting Slides SM-0902, Testing the Functionality of Parameter Change Enable Keyswitch
ML091380435
Person / Time
Site: Oconee, Indian Point  Duke Energy icon.png
Issue date: 04/15/2009
From:
AREVA NP
To:
Office of Nuclear Reactor Regulation
References
TSC 2007-09, Suppl 16
Download: ML091380435 (21)


Text

....

...... SM- 902 J Testing the functionality of PERAB ETEKeC witch ENABýStL E Keyxs W Sc

>TXS RTE PARAM Change Enable Testing - April 15, 2009 1

PARAMETER CHANGE ENABLE Keyswitch

> Each RPS Channel (A, B, C, D & E) and ESFAS Channel (A, B & C) and ESFAS Voter Train (EVEN and ODD) include a PARAMETER CHANGE ENABLE Keyswitch.

> The PARAMETER CHANGE ENABLE Keyswitches are administrativelycontrolled and shall allow only one Channel to be placed into the PARAMETER CHANGE ENABLE position at a time.

> The Keyswitch contact is powered by 24VDC and is connected to an input channel on a S430 Digital Input Module for the TXS computer.

2

> 7XS RTE PARAM Change Enable PARAM Change Enable Testing April 15, Testing -- April 2009 15, 2009 2

Task of PARAMETER CHANGE ENABLE S Keyswitch J w

Under normal operating conditions, the TXS processoris in the OPERA TION mode.

3

- April 15, 2009

> TXS RTE PARAM 7XS RTE PARAM Change Enable Testing Change Enable Testing - April 15, 2009 3

Task of PARAMETER CHANGE ENABLE Keyswitch 4

> TXS RTE PARAM 7XS RTE Enable Testing Change Enable PA RAM Change 15, 2009

- April 15, Testing -April 2009 4

Testing the functionality of PARAMETER CHANGE ENABLE Keyswitch confirms:J 5

> TXS RTE PARAM 7XS PARAM Change Enable Testing Change Enable April 15, Testing -- April 2009 15, 2009 5

Initial Conditions

........00-J Starting the test with the correct initial setting Case 0: Initial Conditions This section ensures that the test starts with the correct initial conditions.

Fe, Action Complete Verify that all Parameter Change Enable Keyswitches are inthe off position for RPS Channels Al, B1, C1, and.D, ESFAS Channels A2, B2, and C2, ESFAS Voters F1, F2 and G1, G2, ESFAS Status Computers H1 and 11, and RPS Channel EiMSI.

- I 6

> Change Enable

> 7XS RTE PARAM Change April 15, Testing -- April Enable Testing 2009 15, 2009 6

ParameterChange Enable Test J

Keyswitch "OFF" Here are two links H

(Ii which drive the Statalarms (TEST) and (TROUBLE ALARM) via the miscellaneous functions FU-0014 and FU-0019 k

> TXS RTE

> 7XS Change Enable PARAM Change RTE PARAM Enable Testing i

Testing -- April 15, 2009 April 15, 2009

~Th 7 7

Verification the acceptance criterialisted on the expected results J P 4III4Ift4I~0444(4I"I s' c4,vi44.

=s 41127

),z S451 are captured K i :1zt J

~ 44 44 44~ 4,44 4,9

< ~ (2 < ~ C-C 2< < a"4?

]

Annundlator Ch, A I SAS-05 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 1 1 I Ch, B ISAS-17 Test procedure o

Ch, C ISAS-29

  • 1 0 0 0 0 0 0 0 11 0 0 0 0 1 0 0 1 0 1 0 0 0 1 0 1 1 1 1 1 n Ch. D 1SAS-41 1 0 0 0 0 0 o O 1 0 0 0 0 1 0o0 1 0 1 0 0 0 0 0 1 1 1 1 101 0 0 a 0 a 0 0 .00!O1 0 0 a 0 0 0 00 0 0 1 0 0 0 0 0 1 1 1 1 1 n*

01 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 1 0 0 0 0 0 1 1 1 1 1 n TROUBLE 000000010010000100101000001101110I ALARM 1 0 L 0 0 0 0 1 0 0 0 0 10 0 1 1 0 0 0 01 00 0 1 1 0 1 I n S00010100100000000001000000 110 11 0 0 0 0 02 0 0 0 1 0 0 0 0 0 0 0 0 D- 1 0 0 0 0 0 1 1 1 1 1 -..

Wi g10000000111000100101000011111110 00010000110 00 10000100000 111 1011o 0 0 0 0 1 11000000010000110010100000111110*

0 0 0 1 o 0 0 1 0 0 1 0 1 0 0 0 0 1 1 1 1 I1 c'4 S45 1 1 0 1 010 0 0 1010000010000i10010100000101110 0 1 0 0 0 0 1 0 0 1 0 1 0 0 0 0 0 1-0 1 1 1 n 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 D 0 0 0 0 0 1 1 1 1 0 R07 a 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 .01010 1 01 1 1 o0 1 00 0 0 0 0 0 1 0 0 0 o 1 0 0 1 1 1 0 0 0 0 0 1 1 1 1 1 0i 01 0 0 0 000 0 0 0- 0 0 000 1 000 0 0 0 0 0 011 0 0 0 0 0 1 001 '11 00 o 0 00 00 0 1 1 1 11 1 1 1 1 01 0 1 0 0 0 0 0. 0 0 1 0 1 0 0 1 0 0 1 0 1 0 0 0 0 1 1 1 1 1 1 0I ChL A tSA5-02 Ch. B 1SA5-14 1 0 0 0 0 0 0 0 1 0 0 0 0 110 0 1 0 0 1 0 0 0 0 1 1 il 1 1 m Ch. C ISAS-26 1 0 0 0 0 0 0 0 1 0 0 0 0 110 0 010 0 1 00 0 0 1 1 1 1 1 (. Chl D 1SAS-3, 0 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0 1 0 0 0 0 0 1 1 1 1 01 0 0 0

0 0

0 0

0 0 1 0 0 0 0 10010 0- 0 0 I 10 1 0 0 0

1 10 0 1 0 a 0 1 0 0 0

0 0

0 0 1 1 1 1 1 1 0 1 1 1 1 r0 TEST 10 1 0 1 110000111001 011010000100000000 1 1 10 10 0 0 1 1 0 0 0 D0 1 0 0 0 0 8

> Enable Testing Change Enable

> 7XS RTE PARAM Change April 15, Testing -- April 2009 15, 2009 8

ParameterChange Enable Test 7XS RTE PARAM Change Enable Testing - April 15, 2009 ý 9

ParameterChange Enable Test J

'eyswitch

'OFF"

> TXS RTE PARAM Change Enable Testing - April 15, 2009 10

ParameterChange Enable Test

> TIXS RTE PARAM Change Enable Testing - April 15, 2009

ParameterChange Enable Test 9

Keyswitch "ON" I:_

12

.> 7XS RTE PARAM Change

> TXS Testing -- April Enable Testing Change Enable 15, 2009 April 15, 2009 12

ParameterChange Enable Test J

The above 3 steps confirm that after the Keyswitch is turned "OFF", the signal state is held by the latch logic.

> IXS RTE PARAM Change Enable Testing - April 15, 2009 13

ParameterChange Enable Test

> IXS RTE PARAM Chanqe Enable Testing - April 15, 2009 14

ParameterChange Enable Test 15

> 7XS RTE PARAM 7XS RTE Enable Testing Change Enable PARAM Change 15, 2009 April 15, Testing -- April 2009 15

ParameterChange Enable Test

> TXS RTE PARAM Change Enable Testing - April 15, 2009 16

ParameterChange Enable Test TXS RTE PARAM Change Enable Testing - April 15, 2009 17,

Parameter Change Enable Test

> IXS RTE PARAM Change Enable Testing -April 15, 2009 18

ParameterChange Enable Test

  • . , N

> TXS RTE PARAM Change Enable Testing - April 15, 2009 19

ParameterChange Enable Test J-J 2

The above 3 steps set the Keyswitch function to normal operation by placing the Keyswitch into the "OFF" position and resetting the CPU.

J

> TXS RTE PARAM Change Enable Testing - April 15, 2009 20

  • Condition the TEST and Report DIAG 2009-2237 mode, coverage of
  • *CR 2009-2237 addressed a question of coverage of the TEST and DIAG mode enable logic.

> 7XS RTE PARAM Change Enable Testing - April 15, 2009 21