Category:Meeting Briefing Package/Handouts
MONTHYEARML23031A2532022-12-0707 December 2022 NRC Presentation at New York State Decommissioning Oversight Board on December 7, 2022 in Cortlandt, New York (Dockets 50-003, 247, 286) ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22130A0092022-04-28028 April 2022 Duke Presentation for April 28, 2022 Public Meeting - Bolting Integrity ML22130A0102022-04-28028 April 2022 Duke Presentation for April 28, 2022 Public Meeting - Containment Liner ML22067A1992022-03-0303 March 2022 Annual Assessment Meeting Presentation ML22063A1142022-01-17017 January 2022 Duke Presentation for Public Meeting on February 17, 2022 ML21235A0452021-08-25025 August 2021 August 25, 2021, Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Public Environmental Scoping Meeting Presentation ML21217A1992021-08-18018 August 2021 Virtual Public Meeting Presentation Slides - Post Shutdown Decommissioning Activities Report, 08/15/2021 PSDAR Public Webinar Meeting ML21207A0262021-07-29029 July 2021 Public Meeting Presentation Slides - Post Shutdown Decommissioning Activities Report, 07/29/2021 PSDAR Public Meeting ML21214A1402021-07-29029 July 2021 Updated Indian Point Public Meeting Presentation Slides - Post Shutdown Decommissioning Activities Report, 07/29/2021 PSDAR Public Meeting ML21102A0632021-04-14014 April 2021 ONS Slides for Pre-Application Meeting to Discuss Proposed Relief Request Related to Code Case N-853 ML21089A1732021-03-30030 March 2021 EOC Slides Final ML21081A1242021-03-22022 March 2021 EOC Slides Final ML21036A0382021-02-0808 February 2021 Pre-submittal Meeting Presentation (02/08/2021) Relief Request No. IP3-ISI-RR-16 ML20300A0872020-10-27027 October 2020 Subsequent License Renewal Application NRC Environmental Pre-Application Meeting - Duke Energy Presentation ML20300A0902020-10-27027 October 2020 Subsequent License Renewal Environmental Pre-Application Meeting - NRC Presentation ML20269A1722020-09-30030 September 2020 Presentation Material for 9/30/2020 Pre-Submittal Meeting Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Onsite Exercise Requirements ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20265A2902020-09-22022 September 2020 Annual Assessment Meeting - Quick Start Guide for Meeting Access ML20265A2842020-09-22022 September 2020 Annual Assessment Meeting - Webinar Presentation NL-20-008, Transmittal of Presentation Slides for Partially Closed Pre-Submittal Meeting to Discuss a Planned License Amendment Request to Replace the Fuel Handling Building Crane2020-01-0606 January 2020 Transmittal of Presentation Slides for Partially Closed Pre-Submittal Meeting to Discuss a Planned License Amendment Request to Replace the Fuel Handling Building Crane ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19302E0512019-11-0606 November 2019 High Energy Line Break License Amendment Public Meeting ML19289A0042019-10-17017 October 2019 Presentation Material for 10/17/19 Pre-Submittal Meeting Entergy to Holtec Proposed License Transfer Application ML19269B6832019-10-0202 October 2019 NEIMA Section 108 Public Meeting Slides - Indian Point - October 2, 2019 ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML19207A0172019-07-30030 July 2019 Summary of Meeting with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment Request for Oconee Nuclear Station, Units 1, 2, and 3 Regarding High Energy Line Break Licensing Basis ML19198A2392019-07-17017 July 2019 Annual Assessment Meeting for Indian Point Energy Center - Meeting Summary ML18227B3212018-09-0505 September 2018 Tornado License Amendment Pre-Application Meeting Slides ML18134A2292018-05-14014 May 2018 Summary of April 26, 2018, Public Teleconference with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment and 3 Regarding Technical Specification 3.8.1 ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML17258A0122017-09-26026 September 2017 Presentation Slide Regarding Committee to Review Generic Requirements Meeting on Oconee Nuclear Station Cable Separation TIA ML17200C9272017-07-0606 July 2017 07/26/2017 Entergy Presentation Slides for Public Meeting Regarding Spent Fuel Pool Management Project, New Criticality Analysis ML17166A2892017-06-20020 June 2017 Entergy Slides for 06/20/2017 Public Meeting, Licensing Action Submittal Plan - Decommissioning. ML17150A0012017-06-20020 June 2017 6/20/2017 Meeting Slides - Entergy Nuclear Operations, Inc. - Licensing Action Submittal Plan - Decommissioning (CAC Nos. MF9624, MF9625, MF9626, MF9627, and MF9628) ML17171A1922017-06-14014 June 2017 NRC Staff Presentation - Power Reactor Decommissioning Program ML17171A1872017-06-14014 June 2017 NRC Staff Presentation - Baffle-Former Bolt Inspections at Indian Point ML16182A0672016-06-30030 June 2016 6/8/2016 - Indian Point Units 2 & 3 Annual Assessment Meeting - NRC Presentation Slides ML16182A1022016-06-30030 June 2016 6/8/2016 - Indian Point Units 2 & 3 Annual Assessment Meeting - Presentations from the Public ML16182A1772016-06-30030 June 2016 6/8/2016 - Indian Point Units 2 & 3 Annual Assessment Meeting - Handouts & Submissions from Individuals ML15348A2032015-12-14014 December 2015 Duke Energy Presentation in Support of December 15, 2015, Public Meeting with NRC Staff Cable Testing Discussion for Proposed 50.55a Alternative Request ML15343A1142015-12-0808 December 2015 NRC Questions to Duke Energy Regarding Cable Testing in Support of Public Meeting on 12/15/15 ML15321A1782015-11-17017 November 2015 Presentation Material in Support of November 18, 2015 Pre-Application Meeting Between NRC and Duke 50.55a(z) Alternative to Code and Standards Requirements ML15286A0762015-10-13013 October 2015 Duke Energy Presentation in Support of October 13, 2015, Public Meeting with NRC Staff Pre-Application Meeting for LAR to Support Khu Stator Replacement. (Revised) ML15282A0722015-10-0909 October 2015 Duke Energy Presentation in Support of October 13, 2015, Public Meeting with NRC Staff Pre-Application Meeting for LAR to Support Khu Stator Replacement ML15148A2632015-05-27027 May 2015 Meeting Slides from the May 27, 2015 Oconee Major Projects Between Duke Energy and NRC ML15113A6262015-04-23023 April 2015 April 14, 2015 Summary of Public Meeting on Oconee Nuclear Station, Units 1, 2 and 3 to Discuss the Annual Assessment ML14356A0062014-12-0303 December 2014 Presentation at December 3, 2014, Category 1 Public Meeting with Duke Energy Carolinas, LLC to Discuss NTTF Recommendation 2.1, Flooding Response ML14211A2162014-07-31031 July 2014 NRC Meeting Slides 7-31-14 Reg Conference ML14211A2132014-07-31031 July 2014 Duke Energy Presentation for 2014-07-31 Meeting 2022-09-14
[Table view] |
Text
....
...... SM- 902 J Testing the functionality of PERAB ETEKeC witch ENABýStL E Keyxs W Sc
>TXS RTE PARAM Change Enable Testing - April 15, 2009 1
PARAMETER CHANGE ENABLE Keyswitch
> Each RPS Channel (A, B, C, D & E) and ESFAS Channel (A, B & C) and ESFAS Voter Train (EVEN and ODD) include a PARAMETER CHANGE ENABLE Keyswitch.
> The PARAMETER CHANGE ENABLE Keyswitches are administrativelycontrolled and shall allow only one Channel to be placed into the PARAMETER CHANGE ENABLE position at a time.
> The Keyswitch contact is powered by 24VDC and is connected to an input channel on a S430 Digital Input Module for the TXS computer.
2
> 7XS RTE PARAM Change Enable PARAM Change Enable Testing April 15, Testing -- April 2009 15, 2009 2
Task of PARAMETER CHANGE ENABLE S Keyswitch J w
Under normal operating conditions, the TXS processoris in the OPERA TION mode.
3
- April 15, 2009
> TXS RTE PARAM 7XS RTE PARAM Change Enable Testing Change Enable Testing - April 15, 2009 3
Task of PARAMETER CHANGE ENABLE Keyswitch 4
> TXS RTE PARAM 7XS RTE Enable Testing Change Enable PA RAM Change 15, 2009
- April 15, Testing -April 2009 4
Testing the functionality of PARAMETER CHANGE ENABLE Keyswitch confirms:J 5
> TXS RTE PARAM 7XS PARAM Change Enable Testing Change Enable April 15, Testing -- April 2009 15, 2009 5
Initial Conditions
........00-J Starting the test with the correct initial setting Case 0: Initial Conditions This section ensures that the test starts with the correct initial conditions.
Fe, Action Complete Verify that all Parameter Change Enable Keyswitches are inthe off position for RPS Channels Al, B1, C1, and.D, ESFAS Channels A2, B2, and C2, ESFAS Voters F1, F2 and G1, G2, ESFAS Status Computers H1 and 11, and RPS Channel EiMSI.
- I 6
> Change Enable
> 7XS RTE PARAM Change April 15, Testing -- April Enable Testing 2009 15, 2009 6
ParameterChange Enable Test J
Keyswitch "OFF" Here are two links H
(Ii which drive the Statalarms (TEST) and (TROUBLE ALARM) via the miscellaneous functions FU-0014 and FU-0019 k
> TXS RTE
> 7XS Change Enable PARAM Change RTE PARAM Enable Testing i
Testing -- April 15, 2009 April 15, 2009
~Th 7 7
Verification the acceptance criterialisted on the expected results J P 4III4Ift4I~0444(4I"I s' c4,vi44.
=s 41127
),z S451 are captured K i :1zt J
~ 44 44 44~ 4,44 4,9
< ~ (2 < ~ C-C 2< < a"4?
]
Annundlator Ch, A I SAS-05 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 1 1 I Ch, B ISAS-17 Test procedure o
Ch, C ISAS-29
- 1 0 0 0 0 0 0 0 11 0 0 0 0 1 0 0 1 0 1 0 0 0 1 0 1 1 1 1 1 n Ch. D 1SAS-41 1 0 0 0 0 0 o O 1 0 0 0 0 1 0o0 1 0 1 0 0 0 0 0 1 1 1 1 101 0 0 a 0 a 0 0 .00!O1 0 0 a 0 0 0 00 0 0 1 0 0 0 0 0 1 1 1 1 1 n*
01 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 1 0 0 0 0 0 1 1 1 1 1 n TROUBLE 000000010010000100101000001101110I ALARM 1 0 L 0 0 0 0 1 0 0 0 0 10 0 1 1 0 0 0 01 00 0 1 1 0 1 I n S00010100100000000001000000 110 11 0 0 0 0 02 0 0 0 1 0 0 0 0 0 0 0 0 D- 1 0 0 0 0 0 1 1 1 1 1 -..
Wi g10000000111000100101000011111110 00010000110 00 10000100000 111 1011o 0 0 0 0 1 11000000010000110010100000111110*
0 0 0 1 o 0 0 1 0 0 1 0 1 0 0 0 0 1 1 1 1 I1 c'4 S45 1 1 0 1 010 0 0 1010000010000i10010100000101110 0 1 0 0 0 0 1 0 0 1 0 1 0 0 0 0 0 1-0 1 1 1 n 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 D 0 0 0 0 0 1 1 1 1 0 R07 a 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 .01010 1 01 1 1 o0 1 00 0 0 0 0 0 1 0 0 0 o 1 0 0 1 1 1 0 0 0 0 0 1 1 1 1 1 0i 01 0 0 0 000 0 0 0- 0 0 000 1 000 0 0 0 0 0 011 0 0 0 0 0 1 001 '11 00 o 0 00 00 0 1 1 1 11 1 1 1 1 01 0 1 0 0 0 0 0. 0 0 1 0 1 0 0 1 0 0 1 0 1 0 0 0 0 1 1 1 1 1 1 0I ChL A tSA5-02 Ch. B 1SA5-14 1 0 0 0 0 0 0 0 1 0 0 0 0 110 0 1 0 0 1 0 0 0 0 1 1 il 1 1 m Ch. C ISAS-26 1 0 0 0 0 0 0 0 1 0 0 0 0 110 0 010 0 1 00 0 0 1 1 1 1 1 (. Chl D 1SAS-3, 0 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0 1 0 0 0 0 0 1 1 1 1 01 0 0 0
0 0
0 0
0 0 1 0 0 0 0 10010 0- 0 0 I 10 1 0 0 0
1 10 0 1 0 a 0 1 0 0 0
0 0
0 0 1 1 1 1 1 1 0 1 1 1 1 r0 TEST 10 1 0 1 110000111001 011010000100000000 1 1 10 10 0 0 1 1 0 0 0 D0 1 0 0 0 0 8
> Enable Testing Change Enable
> 7XS RTE PARAM Change April 15, Testing -- April 2009 15, 2009 8
ParameterChange Enable Test 7XS RTE PARAM Change Enable Testing - April 15, 2009 ý 9
ParameterChange Enable Test J
'eyswitch
'OFF"
> TXS RTE PARAM Change Enable Testing - April 15, 2009 10
ParameterChange Enable Test
> TIXS RTE PARAM Change Enable Testing - April 15, 2009
ParameterChange Enable Test 9
Keyswitch "ON" I:_
12
.> 7XS RTE PARAM Change
> TXS Testing -- April Enable Testing Change Enable 15, 2009 April 15, 2009 12
ParameterChange Enable Test J
The above 3 steps confirm that after the Keyswitch is turned "OFF", the signal state is held by the latch logic.
> IXS RTE PARAM Change Enable Testing - April 15, 2009 13
ParameterChange Enable Test
> IXS RTE PARAM Chanqe Enable Testing - April 15, 2009 14
ParameterChange Enable Test 15
> 7XS RTE PARAM 7XS RTE Enable Testing Change Enable PARAM Change 15, 2009 April 15, Testing -- April 2009 15
ParameterChange Enable Test
> TXS RTE PARAM Change Enable Testing - April 15, 2009 16
ParameterChange Enable Test TXS RTE PARAM Change Enable Testing - April 15, 2009 17,
Parameter Change Enable Test
> IXS RTE PARAM Change Enable Testing -April 15, 2009 18
ParameterChange Enable Test
> TXS RTE PARAM Change Enable Testing - April 15, 2009 19
ParameterChange Enable Test J-J 2
The above 3 steps set the Keyswitch function to normal operation by placing the Keyswitch into the "OFF" position and resetting the CPU.
J
> TXS RTE PARAM Change Enable Testing - April 15, 2009 20
- Condition the TEST and Report DIAG 2009-2237 mode, coverage of
- *CR 2009-2237 addressed a question of coverage of the TEST and DIAG mode enable logic.
> 7XS RTE PARAM Change Enable Testing - April 15, 2009 21